COMENIUS PROJECT LYCEE SAVARY DE MAULEON LES SABLES D’OLONNE

Preview:

DESCRIPTION

COMENIUS PROJECT LYCEE SAVARY DE MAULEON LES SABLES D’OLONNE. Presentation of VENDÉE EAU Strategic directions and operational decisions to fight water scarcity. CONTENTS. A few key figures Presentation of Vendée Eau Strategic direction : Water safety plan Operational decisions : - PowerPoint PPT Presentation

Citation preview

COMENIUS PROJECT LYCEE SAVARY DE

MAULEON LES SABLES D’OLONNE

• Presentation of VENDÉE EAU

Strategic directions and operational decisions to fight water scarcity

CONTENTS

A few key figuresPresentation of Vendée EauStrategic direction :

Water safety planOperational decisions :

Raise people’s awareness of water scarcity The fight against water waste program

A few key figuresDid you know that ?

The average daily water comsumption per person :In France : 151 litres on average

In the Pays de la Loire region : around 138 litres

In Cyprus : around 85 litres (figures for 2005 to 2007)

The water footprint concept or « virtual water »Litres of water required to produce : 1 kg of lettuce → 25 litres 1 kg of wheat → 1 500 litres 1 hamburger → 2 400 litres 1 glass of orange juice → 170 litres 1 ton of steel → 20,000 litres 1 ton of plastic → 2 million litres A car → 35,000 litres 1 ton of medecine → 5 billion litres A pair of shoes → 8 000 litres

A few key figures Did you know that ?

How is water consumptiondistributed (in France)

A few key figures Did you know that ?

Drinking Cooking Car/Garden Washing-up Laundry Toilets Baths/Showers Miscellaneous

Water consumption at Savary de Mauléon High School

2007 : 3,906 m3

2008 : 4,186 m3

2009 : 4,507 m3

2010 : 4,479 m3

NB : A large swimming-pool holds about 500 m3 of water. A year’s water consumption in Savary de Mauléon would fill about 9 swimming-pools.

A few key figures Did you know that ?

General code for territorial groupingsArt.L2224-7-1« The communes have jurisdiction over the matter of

drinking water distribution. Within this framework, they settle upon a drinking water distribution scheme defining the areas served by the water distribution network. They can also provide drinking water production as well as its transportation and storage. »

Presentation of Vendée Eau

Presentation of Vendée Eau

1961 :

1936 – 1955 :

Jurisdiction : Drinking water distribution to 276 communes in Vendée

Jurisdiction : Drinking water production

20 inter-communal syndicates and 2 communes

Amalgamation into inter-communal syndicates

276 communes in Vendée out of 282

Amalgamation into a single departmental service

The missions of Vendée Eau Operate and maintain the public service of water

distribution on behalf of communes, that is to say supply drinking water in sufficient quantity.

Satisfy people’s needs and activities while respecting present quality standards.

Offer subscribers a quality service in accordance with their requirements and at the cheapest price possible.

Presentation of Vendée Eau

Presentation of Vendée Eau

Communes which adhere to Vendée Eau

Independent communes

Inter-communal syndicates boundaries

Presentation of Vendée Eau

Budget :€ 105 million Investment : € 25 million Operating coasts : € 80 million

Water distribution by private contractorsSubcontractors are selected after a competitive tendering procedure, in accordance with the French Code of Public Markets, and for a limited period of timeSubcontractors are responsible for the daily overseeing of water works potabilisation plants, water towers, pipesThey are responsible for taking metre readingsand invoicing on behalf of Vendée Eau→ Vendée Eau supervises their work and retains total control over subscribers’ terms and conditions of service

Presentation of Vendée Eau

Presentation of Vendée Eau

Private contractors’operating zones for the distribution of potable water

Origin of the water supply45 200 000 m3 of water produced in 2009 90 % surface water

12 water dams and 10 water production plants5 % groundwater 12 groundwater abstractions and drillings5 % water imports, mainly from Loire Atlantique

Presentation of Vendée Eau

Presentation of Vendée Eau

Where water requirements are higher in summer

Where the most important resources are located

DamDamWater production plantWater catchmentSurface water collection

Presentation of Vendée Eau

Public drinking water networks14,000 km of water pipes, from 60 to 600 mm in diameter

(steel, cast-iron, PVC, HDPE, asbestos cement)331,000 water subscribers56 water towers, 25 reservoirs30 high pressure and chlorine stations

Presentation of Vendée Eau

Presentation of Vendée Eau

Pipe Laying worksite

Painted water tower in Saint Révérend

Présentation de Vendée Eau

Presentation of Vendée Eau

Evolution de la consommation moyenne par abonné

95.0

100.0

105.0

110.0

115.0

120.0

125.0

1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

m3

117,0 m3/ab117,3 m3/ab

102,0 m3/ab

Water resources : Surface water – around 90 %Ground water – around 10 %

Population served : 520 000 Subscribers : 336 000 in 2009Total water consumption : 34 275 000 m3

Strategic direction of water safety plan

Increased needs in summertime

→33 % of the water is consumed during summer months (June, July, August), half of which in the coastal areas

Growing needs in the coastal areas and in the North East of the Vendée departement.

INSEE study (December 2010) : Population growth forecast

→840 000 inhabitants en 2040

Critical years, close to water shutdown ( 2003 - 2004 - 2005 - 2009)

Water supply safety plan (Vendée Eau – Novembre 2004)

→Water waste reduction programme

Strategic direction of Water safety plan

-7,5 Mm3

-2,1 Mm3

+0,9 Mm3

-1,3 Mm3

+2,0 Mm3+2,0 Mm3

+0,25 Mm3

Coastal zones

-8,8 Mm3

ZONE COTIERE NORD

ZONE COTIERE SUD

ZONE NORD EST

ZONE MERVENT

ZONE CENTRE LAY

LA ROCHE SUR YON

FONTENAY LE COMTE

Strategic direction of Water safety plan

Structural assessment and transfer in 2005

PPreliminary and voluntary actionsDevelopment of groundwater useFuture use of specific quarriesFurthering localized seawater desalinationDevelopment of water quality recovery programsOverall plan for water conservation and the fight

against water wasting

Strategic direction of Water safety plan

Strategic direction of Water safety plan

Groundwater research campaign

A few structuring scenarios to study :Building of an impounding reservoir (reservoir on the

Auzance river)Desalination of seawaterWater transfer from the South of the Vendée

(Mervent) to coastal areas (Apremont)Transfer of treated water from Nantes (water plant

in La Roche) to the North West of VendéeRe-use of water from wastewater treatment plants

Strategic direction of Water safety plan

Water framework directive of October 22, 2000Ensure the ecological stability of waterways1964 and 1992 laws on water / 2006 laws on water and

on aquatic environments SDAGE Loire-Bretagne

Water orientation and planification documents for the Loire-Brittany area SAGE (Auzance Vertonne / Vie et Jaunay, Lay, the Vendée …)

Orientation documents for the catchment area

→ The dam reservoir on the Auzance river is subject to necessary derogation

Strategic direction of Water safety plan

Regional communities

Subscribers and the general publicPupils

A communication adapted to all

Operational Decisions Fight water waste

Programme (2008-2012) : Targeting communitiesGoals Carry on the programme initiated with specific diagnoses Encourage the use of hydro-saving devices Encourage people to watch their water consumptionActions Diagnosis survey results, thoughts on the continuation of the

survey, updating database records Advice and technical support from communities

Editing guides, providing IT tools, advice for installing hydro-saving devices, AEU/HQE project monitoring (HQE = High Environmental Quality)

Operational DecisionsFight water waste

Programme (2008-2012) : Targeting private individuals

Goals Carry on water information campaigns to promote water

conservation Incite people to install hydro-saving devices Start new and more concrete test actions

Operational DecisionsFight water waste

Programme (2008-2012) : Targeting private individualsActions Carry on parntnerships and find new ones Develop pilot actions Install water-saving devices in show houses Improve our knowledge on water

consumption ratios Promote water-saving appliances Carry on marketing communication Release new documents Partnership with media Gardening charter

Operational DecisionsFight water waste

Programme (2008-2012) : Targeting studentsGoals

Initiate a teaching programme for the fight against water waste

Meet schools’ requestsActions Setting-up an educational programme Intervention in schools Water consumption assessments in schools and installation support for water-saving appliances

(Eco-school)

Operational DecisionsFight water waste

This slide show was realized by the students of Management Literacy class (first year, 1ère STG) at Savary de Mauléon

High School, following a conference by our partner « Vendée Eau ».