Citation preview
CARTY GROUPCelebrating 75 Years
1939 - 2014
CGA CARTY GROUP
COMPANY
CECECLEBR
ATITITNINIG
75YEYEYAEAE
RS,1939
-2014
CON
TEN
TS
CGA CARTY GROUP
COMPANY
CONTENTS
6 CONTRACTS PROFILE8 COMPANY VALUES & DIRECTION10 LONGFORD REGIONAL WATER SUPPLY SCHEME STAGE 312 LONGFORD REGIONAL WATER SUPPLY SCHEME STAGE 614 MALLOW BALLYVINITNER WATER SUPPLY SCHEME16 KINLOUGH WATER TREATMENT PLANT18 TULLAGHAN KINLOUGH PIPELINE & RESERVOIR20 MAYO DBO & GROUP WORKS22 FROSSES/ INVER WATER SUPPLY SCHEME24 TYDAVNET GWS INTAKE26 BAILIEBOROUGH REGIONAL WATER SUPPLY SCHEME28 LONGFORD FIVE VILLAGES DBO SEWAGE PLANTS30 ROSCOMMON DBO SEWAGE PLANTS32 CLONLARA PUMPED SEWER AND PUMPHOUSE34 SLIGO ENVIRONS CALTRAGH SEWER EXTENSION36 KILKERNAN & KILLA PIER40 BUNDORAN PIER AND DREDGING42 ROSSES POINT RNLI BOATHOUSE AND SLIPWAY44 CLAREGALWAY TEMPORARY BRIDGE 46 BALLYSHONNON FOOTBRIDGE48 SLIGO AND ENVIRONS WEIR & FOOTBRIDGE50 GLOBE HOSE DEVELOPMENT52 DRUMGALLON COURT54 LISGREY GARDENS56 PORTBEG HOLIDAY HOMES58 STATION LANE DEVELOPMENT60 PROPERTY PROFILE62 DEVELOPMENT PARTNERS64 SELECTED ESB PROJECTS66 ROSCOMMON RETAIL PARK68 SELECTED IDA PROJECTS70 SLIGO BUSINESS AND TECHNOLOGY PARK
CECECLEBR
ATITITNINIG
75YEYEYAEAE
RS,1939
-2014
COM
PAN
Y H
ISTOR
Y
CGA CARTY GROUP
COMPANY
ABOUT US“FOR THE PAST 75 YEARS THE CARTY GROUP HAS HAD A LARGE INFLUENCE ON THE CONSTRUCTION INDUSTRY IN THE NORTH WEST OF IRELAND, AND IN THE PAST 20 YEARS HAS GROWN TO BE ONE OF THE BEST KNOW WATER AND WASTE UTILITY PROVIDERS IN IRELAND. THE ORIGINS OF THE BUSINESS DATE BACK TO 1939 WHEN PATRICK CARTY SR. CARRIED OUT HIS FIRST CONSTRUCTION PROJECTS IN ENNISKILLEN AND THE SURROUNDING AREAS WITH A MIXTURE OF MUNICIPAL AND PRIVATE PROJECTS, FOR CLIENTS LIKE THE LORD OF LOUGH ERNE. P CARTY & SONS WERE INVOLVED
IN CONSIDERABLE AND SIZABLE BUILDING AND CIVIL ENGINEERING PROJECTS THROUGH ULSTER UNTIL THE MID 1970S. CARTY CONTRACTORS AND CARTY QUARRIES JOINED THE COMPANY PORTFOLIO IN THE EARLY 1970S AND THE QUARRYING OPERATIONS IN SLIGO, LEITRIM AND DONEGAL BECAME THE DRIVING FORCE FOR THE CARTY GROUP UNTIL THEY WERE SOLD IN THE LATE 1980S. AT THIS POINT CARTY CONTRACTORS LTD HAD GROWN TO BE A WELL ESTABLISHED AND REPUTABLE CIVIL ENGINEERING AND PLANT OPERATOR IN THE NORTH WEST. THIS BUSINESS HAS CONTINUED TO GROW WITH THE COMPANY LESSENING IT’S INVOLVEMENT IN PLANT HIRE AND FOCUSING ON PUBLIC INFRASTRUCTURE CONSTRUCTION. IN THE 1990S THE CARTY GROUP EXTENDED IT’S PORTFOLIO BY ADDING CARTY PROPERTIES, A DEVELOPMENT COMPANY WITH IT’S OWN STRONG PROPERTY PORTFOLIO. NOW IN IT’S 75TH YEAR OF EXISTENCE, THE CARTY GROUP IS A LARGE PROVIDER OF MUNICIPAL PROJECTS AND PRIVATE DEVELOPMENT PROJECTS, WITH A FOCUS TOWARDS THE PROVISION OF WATER & WASTE WATER SERVICES. IN GROWING THE GROUP HAS HAD TO INCREASE IT’S CORPORATE PROFILE, BUT TODAY WE STILL PRIDE OURSELVES IN BEING A 3RD GENERATION FAMILY RUN BUSINESS.”
WATER & WASTER WATER SCHEMES
CONTRACT YEAR VALUE
LONGFORD FIVE VILLAGES DBO WASTE WATER TREATMENT PLANTS
2013 €3.0M
LONGFORD CENTRAL REGIONAL WATER SUPPLY SCHEME STAGE 3 2012 €9.0M
ROSCOMMON DBO WASTE WATER TREATMENT PLANTS 2011 €.0M
MALLOW BALLLYVINITNER REGIONAL WATER SUPPLY SCHEME 2010 €3.0M
CLONLARA WASTE WATER SCHEME 2009 €1.5M
KINLOUGH WATER TREATMENT PLANT 2009 €0.3M
LONGFORD CENTRAL REGIONAL WATER SUPPLY SCHEME STAGE 6 2008 €3.0M
LONGFORD REHABILITATION 2008 €0.4M
TULLAGHAN KINLOUGH RWSS 2008 €1.8M
STRAIDE GROUP WATER SCHEME 2008 €0.22M
BENBULBIN GROUP WATER SCHEME 2007 €0.3M
MAYO DBO BUNDLE 2 ADVANCED WORKS 3 2007 €10.3M
KILATURLEY GROUP WATER SCHEME 2007 €0.6M
FAHY GROUP WATER SCHEME 2007 €0.5M
MAYO DBO BUNDLE 1 ADVANCE WORKS 2 2006 €5.2M
SLIGO WATER METERING 2006 €6.0M
KILBANNON GROUP WATER SCHEME 2005 €1.3M
NORTH ROSCOMMON RWSS EXTENSION STAGE 2 2005 €0.25M
BAHOLA GROUP WATER SCHEME EXTENSION 2005 €0.4M
FROSSES/ INVER WATER SUPPLY SCHEME 2005 €0.8M
TOURMAKEEDY GROUP WATER SCHEME 2005 €0.6M
MAYO DBO BUNDLE 1 ADVANCED WORKS 1 2005 €3.3M
ANNAGH GROUP WATER SCHEME EXTENSION 2005 €2.2M
GEEVAGH/ HIGHWOOD GROUP WATER SUPPLY SCHEME 2004 €1.3M
TYDAVNET GROUP WATER SUPPLY SCHEME 2004 €0.95M
BALLYCLARE GROUP WATER SUPPLY SCHEME 2004 €0.12M
BALLINLOUGH GROUP WATER SUPPLY SCHEME 2004 €0.1M
ACLARE GROUP WATER SUPPLY SCHEME 2004 €0.15
KILBANNON GROUP WATER SUPPLY SCHEME 2004 €1.4M
ANNAGH GROUP WATER SUPPLY SCHEME STAGE 2 2003 €2.1M
BOHOLA GROUP WATER SUPPLY SCHEME 2003 €0.5M
CORRICK GROUP WATER SUPPLY SCHEME 2002 €0.3M
LOUGH TALT WATER SUPPLY SCHEME STAGE 2 2002 €0.7M
BAILIEBOROUGH REGIONAL WATER SUPPLY SCHEME 2001 €5.4M
MONESTERADEN SEWERAGE TREATMENT PLANT 2001 €0.4M
NEWPORT & MULRANEY WATER SUPPLY SCHEME 2000 €1.2M
MONAGHAN RWSS CONTRACT AUGMENTATION SCHEME 1999 €3.1M
SLIGO ENVIRONS CONTRACT NO. 7 CALTRAGH SEWER 1998 €1.2M
CECECLEBR
ATITITNINIG
75YEYEYAEAE
RS,1939
-2014
CON
TR
ACT
S PRO
FILE 2013 - 1998
CGA CARTY GROUP
COMPANY
WATER & WASTER WATER SCHEMES
CONTRACT YEAR VALUE
LONGFORD FIVE VILLAGES DBO WASTE WATER TREATMENT PLANTS
2013 €3.0M
LONGFORD CENTRAL REGIONAL WATER SUPPLY SCHEME STAGE 3 2012 €9.0M
ROSCOMMON DBO WASTE WATER TREATMENT PLANTS 2011 €.0M
MALLOW BALLLYVINITNER REGIONAL WATER SUPPLY SCHEME 2010 €3.0M
CLONLARA WASTE WATER SCHEME 2009 €1.5M
KINLOUGH WATER TREATMENT PLANT 2009 €0.3M
LONGFORD CENTRAL REGIONAL WATER SUPPLY SCHEME STAGE 6 2008 €3.0M
LONGFORD REHABILITATION 2008 €0.4M
TULLAGHAN KINLOUGH RWSS 2008 €1.8M
STRAIDE GROUP WATER SCHEME 2008 €0.22M
BENBULBIN GROUP WATER SCHEME 2007 €0.3M
MAYO DBO BUNDLE 2 ADVANCED WORKS 3 2007 €10.3M
KILATURLEY GROUP WATER SCHEME 2007 €0.6M
FAHY GROUP WATER SCHEME 2007 €0.5M
MAYO DBO BUNDLE 1 ADVANCE WORKS 2 2006 €5.2M
SLIGO WATER METERING 2006 €6.0M
KILBANNON GROUP WATER SCHEME 2005 €1.3M
NORTH ROSCOMMON RWSS EXTENSION STAGE 2 2005 €0.25M
BAHOLA GROUP WATER SCHEME EXTENSION 2005 €0.4M
FROSSES/ INVER WATER SUPPLY SCHEME 2005 €0.8M
TOURMAKEEDY GROUP WATER SCHEME 2005 €0.6M
MAYO DBO BUNDLE 1 ADVANCED WORKS 1 2005 €3.3M
ANNAGH GROUP WATER SCHEME EXTENSION 2005 €2.2M
GEEVAGH/ HIGHWOOD GROUP WATER SUPPLY SCHEME 2004 €1.3M
TYDAVNET GROUP WATER SUPPLY SCHEME 2004 €0.95M
BALLYCLARE GROUP WATER SUPPLY SCHEME 2004 €0.12M
BALLINLOUGH GROUP WATER SUPPLY SCHEME 2004 €0.1M
ACLARE GROUP WATER SUPPLY SCHEME 2004 €0.15
KILBANNON GROUP WATER SUPPLY SCHEME 2004 €1.4M
ANNAGH GROUP WATER SUPPLY SCHEME STAGE 2 2003 €2.1M
BOHOLA GROUP WATER SUPPLY SCHEME 2003 €0.5M
CORRICK GROUP WATER SUPPLY SCHEME 2002 €0.3M
LOUGH TALT WATER SUPPLY SCHEME STAGE 2 2002 €0.7M
BAILIEBOROUGH REGIONAL WATER SUPPLY SCHEME 2001 €5.4M
MONESTERADEN SEWERAGE TREATMENT PLANT 2001 €0.4M
NEWPORT & MULRANEY WATER SUPPLY SCHEME 2000 €1.2M
MONAGHAN RWSS CONTRACT AUGMENTATION SCHEME 1999 €3.1M
SLIGO ENVIRONS CONTRACT NO. 7 CALTRAGH SEWER 1998 €1.2M
MARINE WORKS & BRIDGE WORKS
CONTRACT YEAR VALUE
CLAREGALWAY BRIDGE DIVERSION, GALWAY 2010 €0.3M
BUNDORAN HARBOR DREDGING PHASE 3, DONEGAL 2005 €.0M
EASKY PIER , SLIGO 2005 €.0M
KILKERNAN PIER, GALWAY 2004 €3.0M
KILALA PIER, SLIGO 2002 €1.2M
BUNDORAN PIER REFURBISHMENT & EXTENSION 2000 €0.2M
BUNDORAN HARBOUR DREDGING PHASE 1, DONEGAL 2000 €0.1M
ROSSES POINT RNLI STATION & SLIPWAY 2001 €1.1M
ESB FOOTBRIDGE BALLYSHANNON, DONEGAL 2000 €0.13M
SLIGO AND ENVIRONS WEIR & FOOTBRIDGE 1998 €1.8M
CIVIL’S & RELATED WORKS
CONTRACT YEAR VALUE
MERVUE BUSINESS PARK REHABILITATION, GALWAY 2006 €0.3M
ROSCOMMON RETAIL PARK, ROSCOMMON 2006 €1.0M
ARDFINN HOUSING DEVELOPMENT, SLIGO 2007 €0.8M
ST. ANGELA’S STUDENT HOUSING DEVELOPMENT, SLIGO 2005 €1.8M
MILL FALLS APARTMENT DEVELOPMENT AND RIVER RETENTION 2005 €1.3M
O’CONNELL STREET DUCTING SLIGO 2005 €0.08M
IDA ROUNDABOUT, CASTLE BAR, MAYO 2004 €0.25M
STATION ROAD HOUSING DEVELOPMENT, CAVAN 2004 €0.3M
ESB DUCTING LETTERKENNY, DONEGAL 2003 €0.45M
BALLISODARE ENVIRONMENTAL IMPROVEMENT SCHEME 2003 €0.1M
IDA LETTERKENNY BUSINESS PARK PHASE 1 - WINDYHALL II 2002 €0.8M
FINNISKILLEN BUSINESS PARK CIVIL & STREET LIGHTWORKS 2002 €1.8M
ESB DUCTING STRANDHILL, SLIGO 2002 €0.1M
IDA LETTERKENNY BUSINESS PARK -LISSENAN, DONEGAL 2001 €2.3M
IDA BALLYSHANNON BUSINESS PARK EXTENSION, DONEGAL 2001 €0.8M
ASHAI ESB EMERGENCY GENERATION PLANT 2001 €0.3M
DEVELOPMENT & BUILDING WORKS
CONTRACT YEAR VALUE
RIVERSIDE DEVELOPMENT GARRISON, FERMANAGH 2009 €0.5M
BUNDORAN MOTORS EXTENSION, DONEGAL 2008 €0.2M
DRUMGALLON COURT HOUSING DEVELOPMENT, FERMANAGH 2007 €6M
LISGREY GARDENS HOUSING DEVELOPMENT, CAVAN 2006 €9M
ARD NA SI HOUSING DEVELOPMENT, LEITRIM 2005 €3.6M
BOTHAR BUI & BOTHAR GLAS HOUSING DEVELOPMENTS, CAVAN 2003 €15M
DUNCARBERRY HEIGHTS HOUSING DEVELOPMENT, LEITRIM 2000 €1.3M
MERCY CONVENT REDEVELOPMENT, SLIGO 2000 €1.1M
PORTBEG HOUSING DEVELOPMENT, DONEGAL 1998 €2.6M
7
CECECLEBR
ATITITNINIG
75YEYEYAEAE
RS,1939
-2014
COM
PAN
Y V
ALU
ES & D
IRECT
ION
CGA CARTY GROUP
COMPANY
COMMITMENT TO WATER INFRASTRUCTURE IN THE PAST 15 YEARS WE HAVE COMPLETED OVER 35 WATER SUPPLY PROJECTS, WHICH HAS AMOUNTED TO OVER 400KM OF WATER MAINS, 15,000 BOUNDARY BOXES, 40 WATER STORAGE RESERVOIRS, 30 WATER TREATMENT PLANTS AND PUMPING STATIONS, COUNTLESS COMMERCIAL METERS, VALVES, FIRE HYDRANTS AND OTHER IMPORTANT FACTORS THAT MAKE US ONE OF THE MOST EXPERIENCED WATER CONTRACTORS IN IRELAND TODAY
FAMILY VALUESALTHOUGH THE CARTY GROUP HAS EMPLOYED HUNDREDS OF PEOPLE OVER THE LAST THREE QUARTERS OF A CENTURY , MORE THE TWENTY MEMBERS AND THREE GENERATIONS OF THE CARTY FAMILY HAVE BEEN INVOLVED IN IT’S FORMATION AND DEVELOPMENT. TODAY THE COMPANY FINDS ITSELF IN THE OWNERSHIP OF AIDEN & MARGARET CARTY, WITH THEIR ELDEST SON, IARLA CARTY AT THE HELM AS MANAGING DIRECTOR AND HIS COUSIN SHANE CARTY AS PROJECTS MANAGER.
9
WA
WA
WTETETR
&W
AW
AW
STETETRW
AW
AW
TETETRSER
VI
VI
VCECECS
LON
GFO
RD
REG
ION
AL W
ATER
SUPPLY
SCH
EME STA
GE 3
CGA CARTY GROUP
COMPANY
CLIENT COMMITMENT: “CARTY CONTRACTORS HAVE BEEN WORKING FOR LONGFORD COUNTY COUNCIL SINCE 2008 AND SINCE THEN HAVE COMPLETED THREE POTABLE WATER CONTRACTS AND A WASTE WATER CONTRACT IN THE COUNTY. THIS CONTINUED RELATIONSHIP HAS ALLOWED US TO SEE A FULL UPGRADE OF LONGFORD TOWN’S WATER SUPPLY WHICH INCLUDES A 5,000M3 CAST IN SITU RESERVOIR AT PRUCKLISH AND A 10,000M3 DISTRIBUTION RESERVOIR AT KNOCKAHAW.”
LONGFORD CRWSS PRUCKLISH RESERVOIR
NAME: LONGFORD REGIONAL WATER SUPPLY SCHEME. CLIENT: LONGFORD COUNTY COUNCIL. CONSULTANT ENGINEERS: TOBIN CONTRACT DETAILS: CONSTRUCTION OF NEW RISING MAIN BETWEEN LOUGH FORBES WATER TREATMENT RESERVOIR AND NEW 5,000M2 RESERVOIR AT PRUCKLISH. CONNECTION TO 500MM TRUCK MAIN LAID BY CARTY GROUP UNDER STAGE 6. DISTRIBUTION MAIN BETWEEN PRUCKLISH RESERVOIR AND DRUMLISH AND CONSTRUCTION OF NEW RISING MAIN BETWEEN GLANNAGH PUMPING STATION AND NEW 1,000M2 PRECAST CONCRETE RESERVOIR AT LISANNAGH.
LONGFORD 2008-2013_ 1 NO. 10,000M3 CAST IN SITU RESERVOIR_ 1 NO. 5,000M3 CAST IN SITU RESERVOIR_ 1 NO. 1,000M3 PRE-CAST RESERVOIR_ 25KM OF TRUNK MAINS_DUCTILE IRON_HIGH DENSITY POLYETHELENE_DIAMETER_500MM - 200MM, REHABILITATION OF 200 EXISTING HOUSE CONNECTIONS, FIVE WASTE WATER TREATMENT PLANTS.
11
WA
WA
WTETETR
&W
AW
AW
STETETRW
AW
AW
TETETRSER
VI
VI
VCECECS
LON
GFO
RD
CEN
TR
AL W
ATER
SUPPLY
SCH
EME STA
GE 6
CGA CARTY GROUP
COMPANY
NAME: LONGFORD REGIONAL WATER SUPPLY SCHEME STAGE 6 CLIENT: LONGFORD COUNTY COUNCIL CONSULTANT ENGINEERS: NICOLAS O’DWYER CONSULTING ENGINEERSCONTRACT DETAILS: CONSTRUCTION OF 14KM OF DUCTILE IRON WATER MAIN WITH DIAMETERS RANGING FROM 200MM -500MM . CONSTRUCTION OF 10,000M3 CAST IN SITU CONCRETE RESERVOIR AND ASSOCIATED SITE WORKS.
NAME: LONGFORD REHABILITATIONCLIENT: LONGFORD COUNTY COUNCIL CONSULTANT ENGINEERS: NICOLAS O’DWYER CONSULTING ENGINEERSCONTRACT DETAILS: CONSTRUCTION OF 3KM OF 180MM & 125MM PE DISTRIBUTION PIPEWORK IN LONGFORD TOWN CENTER. INSTALLATION OF 200 ASSOCIATED HOUSE CONNECTIONS, METER BOXES AND OTHER REHABILITATION WORKS.
WA
WA
WTETETR
&W
AW
AW
STETETRW
AW
AW
TETETRSER
VI
VI
VCECECS
MA
LLOW
/ BA
LLYV
INIT
ER R
EGIO
NA
L WAT
ER SU
PPLY SC
HEM
E
CGA CARTY GROUP
COMPANY
NAME: MALLOW / BALLYVINITER REGIONAL WATER SUPPLY SCHEME CLIENT: CORK COUNTY COUNCIL CONSULTANT ENGINEERS: TJ O’ CONNOR CONTRACT DETAILS: THE BOX CROSS PHASE 1 SCHEME WAS IMPLEMENTED TO SECURE A RELIABLE AND SAFE DRINKING WATER SUPPLY FOR MALLOW TOWN AND IT’S ENVIRONS. IT INVOLVES THE PUMPING OF TREATED DRINKING WATER FROM BORE HOLES AT BOX CROSS TO MALLOW TOWN AND IT’S ENVIRONS VIA SECURE MAINS AND ASSOCIATED RESERVOIRS.
BOX CROSS PUMPING STATION & TREATMENT PLANT
WA
WA
WTETETR
&W
AW
AW
STETETRW
AW
AW
TETETRSER
VI
VI
VCECECS
KIN
LOU
GH
WAT
ER T
REAT
MEN
T FA
CILIT
YNAME: KINLOUGH WATER TREATMENT FACILITY CLIENT: VEOLA WATER IRELAND CONSULTANT ENGINEERS: TJ O’ CONNOR & ASSOCIATES CONTRACT DETAILS: THE CONSTRUCTION OF A WATER TREATMENT PLANT WITH AN OUTPUT CAPACITY OF 1320M2 PER DAY WITH A RAW INTAKE OF 68M3 PER HOUR FROM AN UPHILL STREAM. THE WORKS CONSISTED OF CIVIL ENGINEERING INFRASTRUCTURE, EARTHWORKS FOUL SURFACE WATER SYSTEMS, WATER MAIN PIPEWORK AND INTERCONNECTING PIPEWORK. ALL ASSOCIATED SITE WORKS INCLUDING DUCTING, PLINTHS, FOOTPATHS, PAVING, FENCING AND CONTROL BUILDING.
CGA CARTY GROUP
COMPANY
KINLOUGH TREATMENT PLANT
WATER TREATMENT: “OVER THE PAST 15 YEARS THE CARTY CONTRACTORS HAVE BECOME LEADERS AT THE CONSTRUCTION OF WATER TREATMENT PLANTS AND THE DIFFICULTIES ASSOCIATED WITH THEIR SITE-WORKS AND INTAKES. SINCE 1998 WE HAVE CONSTRUCTED OVER 30 WATER TREATMENT PLANTS, BORE-HOLE PUMPING STATIONS AND BOOSTER STATIONS ACROSS IRELAND. VEOLIA WATER, EPS, AND EARTHTECH HAVE BEEN SOME OF OUR WORKING PARTNERS. “
OVER 20 WATER T R E A T M E N T FACILITIES IN THE PAST 10 YEARS
WATER PARTNERS
WA
WA
WTETETR
&W
AW
AW
STETETRW
AW
AW
TETETRSER
VI
VI
VCECECS
TU
LLAG
HA
N/ K
ILOU
GH
GR
OU
P WAT
ER SU
PPLY SC
HEM
E
NAME: TULLAGHAN/ KINLOUGH GROUP WATER SUPPLY SCHEMECLIENT: LEITRIM COUNTY COUNCILCONSULTANT ENGINEERS: TJ O’ CONNOR ASSOCIATES CONTRACT DETAILS: CONSTRUCTION OF 15KM OF HIGH DENSITY POLYETHYLENE PIPE CONNECTING THE VILLAGES OF TULLAGHAN TO KINLOUGH AND TRUNK MAIN TO RESERVOIR. CONSTRUCTION OF 1 NO. PRECAST CONCRETE RESERVOIR AND ASSOCIATED SITE-WORKS. 1000M OF URBAN DISTRIBUTION MAIN, TEN MAJOR CONNECTIONS AND 400 DOMESTIC CONNECTIONS AND METERS.
CGA CARTY GROUP
COMPANY
CLOONE RESERVOIR
WATER NETWORKS: “CARTY CONTRACTORS POSITION AS ONE OF THE LARGEST INSTALLERS OF WATER NETWORKS IN IRELAND HAS ALLOWED US TO HAVE A CONTINUED RELATIONSHIP WITH COUNTY COUNCILS, GROUP WATER SCHEMES AND OTHER WATER PROVIDERS IN IRELAND.”
WATER CLIENTS
• DONEGAL COUNTY COUNCIL• MONAGHAN COUNTY COUNCIL• CAVAN COUNTY COUNCIL• SLIGO COUNTY COUNCIL• LEITRIM COUNTY COUNCIL• ROSCOMMON COUNTY COUNCIL• MAYO COUNTY COUNCIL• GALWAY COUNTY COUNCIL• CLARE COUNTY COUNCIL• CORK COUNTY COUNCIL• WESTMEATH COUNTY COUNCIL• FINGAL COUNTY COUNCIL
WA
WA
WTETETR
&W
AW
AW
STETETRW
AW
AW
TEETETRRSER
VI
VI
VCECECS
MAYO
DB
O &
GR
OU
P WAT
ER SC
HEM
ES
CGA CARTY GROUP
COMPANY
PRE-CAST CAST RESERVOIRS: OVER THE PAST 15 YEARS CARTY GROUP HAS CONSTRUCTED MORE THAN 30 PRE-CAST CONCRETE RESERVOIRS AND THEIR ASSOCIATED SITE-WORKS AT VARIOUS LOCATIONS ACROSS IRELAND.
NAME: MAYO COUNTY COUNCILCLIENT: MAYO DBO BUNDLE 2 ADVANCED WORK 3CONSULTANT ENGINEERS: RYAN HANDLEY CONSULTING ENGINEERSCONTRACT DETAILS: INSTALLATION OF 80KM OF DISTRIBUTION MAINS OF VARIOUS SIZES RANGING FROM 53MM TO 315MM ALL HIGH DENSITY POLYETHYLENE, VARIOUS OPEN TRENCH AND TRENCH-LESS METHODS USED. 3,500 BOUNDARY BOXES AND CONSUMER METERS.
NAME: MAYO COUNTY COUNCILCLIENT: MAYO DBO BUNDLE 2 ADVANCED WORK 1CONSULTANT ENGINEERS: RYAN HANDLEY CONSULTING ENGINEERSCONTRACT DETAILS: INSTALLATION OF 75KM OF DISTRIBUTION MAINS OF VARIOUS SIZES RANGING FROM 53MM TO 315MM ALL HIGH DENSITY POLYETHYLENE, VARIOUS OPEN TRENCH AND TRENCH-LESS METHODS USED. 6000 BOUNDARY BOXES AND CONSUMER METERS. NAME: MAYO DBOCLIENT: EARTHTECHCONSULTANT ENGINEERS: ALAN TRAYNORCONTRACT DETAILS: CONSTRUCTION OF 12 NO. WATER TREATMENT WORKS ASSOCIATED INTAKES AND SITE-WORKS FOR VARIOUS LOCATIONS IN MAYO. NAME: MAYO DBOCLIENT: MAYO COUNTY COUNCILCONSULTANT ENGINEERS: RYAN HANDLEY CONSULTING ENGINEERSCONTRACT DETAILS: INSTALLATION OF 40KM OF DISTRIBUTION MAINS OF VARIOUS SIZES, 12 NO. PRE-CAST WATER STORAGE RESERVOIRS AND ASSOCIATED SITE-WORKS FOR VARIOUS LOCATIONS IN MAYO.
WA
WA
WTETETR
&W
AW
AW
STETETRW
AW
AW
TETETRSER
VI
VI
VCECECS
NAME: FROSSES/ INVER WATER SUPPLY SCHEMECLIENT: DONEGAL COUNTY COUNCILCONSULTANT ENGINEERS: JENNINGS O’DONAVAN & PARTNERSCONTRACT DETAILS: THIS CONTRACT INVOLVED THE LAYING OF A RAW WATER INTAKE PIPELINE FROM ST. PETER’S LOUGH DOWN TO FROSSES INVER WATER TREATMENT PLANT AT DRUMBEG AND A TREATED WATER MAIN FROM THE WORKS TO A NEW RESERVOIR AT GLENCOAGH HILL, THE TOTAL PIPELINE WAS 4.5KM.CG
A CARTY GROUP COMPANY
FRO
SSES / INV
ER W
ATER
SUPPLY
SCH
EME
WA
WA
WTETETR
&W
AW
AW
STETETRW
AW
AW
TETETRSER
VI
VI
VCECECS
CGA CARTY GROUP
COMPANY
TY
DAV
ENT
GW
S INTA
KE
NAME: TYDAVENT GWS MONAGHANCLIENT: MONAGHAN COUNTY COUNCILCONSULTANT ENGINEERS: JENNINGS O’DONOVAN & PARTNERSCONTRACT DETAILS: INSTALLATION OF 4KM OF HDPE PIPELINE AND CONSTRUCTION OF A PRECAST DISTRIBUTION RESERVOIR. CONSTRUCTION OF INTAKE PIPE LINE, SCREEN, WALKWAY AND ASSOCIATED CONSTRUCTION ROADS.
15,000 BOUNDARY BOXES AND
DOMESTIC METERS IN THE LAST 15
YEARS
WA
WA
WTETETR
&W
AW
AW
STETETRW
AW
AW
TETETRSER
VI
VI
VCECECS
CGA CARTY GROUP
COMPANY
NAME: BAILIEBOROUGH REGIONAL WATER SUPPLY SCHEMECLIENT: CAVAN COUNTY COUNCILCONSULTANT ENGINEERS: EG PETIT & CO.CONTRACT DETAILS: CONSTRUCTION OF 20KM OF WATER PIPELINES RANGING FROM 100MM TO 350MM IN UPVC DUCTILE IRON AND HDPE CONNECTING THE TWO TOWNS OF BAILIEBOROUGH AND VIRGINIA, AND INSTALLATION OF DISTRIBUTION RING MAIN TO VIRGINIA TOWN. THIS CONTRACT ALSO INCLUDED THE CONSTRUCTION OF TWO PRE-CAST CAST WATER STORAGE RESERVOIRS.
BA
ILIEBO
RO
UG
H R
EGIO
NA
L WAT
ER SU
PPLY SC
HEM
E
WATER MAINS1998-2013
SLIGO_28.5KM GALWAY _15KM
MAYO _231KMLEITRIM _16KM
DONEGAL _12KMLONGFORD_25KM
MONAGHAN_16KMROSCOMMON_8KM
CAVAN_36KMCORK_14KM
_________________OVER 400 KM
WA
WA
WTETETR
&W
AW
AW
STETETRW
AW
AW
TETETRSER
VI
VI
VCECECS
LON
GFO
RD
5 VILLA
GES D
BO
SEWER
AG
E CON
TR
ACT NAME: LONGFORD FIVE VILLAGES DBO SEWERAGE
CONTRACT CLIENT: EPS - LONGFORD COUNTY COUNCIL CONSULTANT ENGINEERS: NICHOLAS O’DWYER & PARTNERS CONTRACT DETAILS: THE CONSTRUCTION OF FIVE NO. SEWAGE TREATMENT PLANTS RANGING FROM 1000 PE TO 5000PE INCLUDING ALL ASSOCIATED SITE WORKS, INLET PIPEWORK, OUTFALLS AND ACCESS ROADS.CG
A CARTY GROUP COMPANY
WASTE WATER TREATMENT: THE CARTY GROUP HAS BEEN CONSTRUCTING WASTE WATER TREATMENT PLANTS FOR OVER FIFTY YEARS WE HAVE CONSTRUCTED 12 BETWEEN 2011 -2013
WA
WA
WTETETR
&W
AW
AW
STETETRW
AW
AW
TETETRSER
VI
VI
VCECECS
CGA CARTY GROUP
COMPANY
NAME: ROSCOMMON DBO SEWERAGE CONTRACT CLIENT: EPS - ROSCOMMON COUNTY COUNCIL CONSULTANT ENGINEERS: JENNINGS O DONOVAN SUPERVISORY ENGINEERS: NICHOLAS O’DWYER & PARTNERS CONTRACT DETAILS: THE PROJECT INVOLVED THE CONSTRUCTION OF SLUDGE HANDLING/STORAGE FACILITIES, FOR THE 7NO VILLAGES OF CREAGH, FRENCHPARK, ELPHIN, KNOCKROCKERY,BALLYLEAGUE, HUDSON BAY AND STROKESTOWN. THE WASTEWATER TREATMENT PLANTS VARY IN SIZE WITH DIFFERING LEVELS OF TREATMENT REQUIRED TO SATISFY THE ASSIMILATIVE CAPACITY OF THE RECEIVING WATERS. PROJECT INCLUDED 6 NO. TREATMENT BUILDINGS,OUTFALL PIPES, RISING MAINS, ACCESS ROADS AND CHAMBERS AND IN-SITU CONCRETE TANKS. IT ALSO INCLUDED THE TIE IN TO 7NO EXISTING SEWERS AND THE LAYING OF 4350M OF SEWERS BETWEEN 100-300MM.
RO
SCOM
MO
N D
BO
SEWER
AG
E CON
TR
ACT
P CARTY & SONS “SOME OF THE CARTY GROUPS EARLIEST LARGE SCALE MUNICIPAL PROJECTS WERE LARGE WASTE WATER TREATMENT PLANTS IN FERMANAGH IN THE 1970’S”
WA
WA
WTETETR
&W
AW
AW
STETETRW
AW
AW
TETETRSER
VI
VI
VCECECS
CLON
LAR
A SEW
ERA
GE SC
HEM
E
NAME: CLONLARA SEWERAGE SCHEME CLIENT: CLARE COUNTY COUNCIL CONSULTANT ENGINEERS: TOBIN CONSULTANTS ENGINEERS CONTRACT DETAILS: THE CONTRACT CONSISTED OF THE CIVIL ENGINEERING INFRASTRUCTURE AND INSTALLATION OF MECHANICAL AND ELECTRICAL PLANT. THE CONSTRUCTION OF 2 NO. IN-SITU PUMPING STATIONS WITH 500M3 CAPACITY IN UNSTABLE GROUND. INSTALLATION OF 8000M OF 225MM RISING MAIN AND 1.5KM OF GRAVITY MAINS, ASSOCIATED MANHOLES, CHAMBERS , VENTILATION POINTS, CONTROL BUILDINGS AND SITE-WORKS. CG
A CARTY GROUP COMPANY
CLONLARA WASTEWATER PUMPING STATION
1970“IN THE 1970’S AS CARTY GROUP WAS FINISHING UP THE WASTE WATER PUMPING STATION IN BUNDORAN, CO. DONEGAL AN ATLANTIC STORM RIPPED THROUGH AND SET THE ALMOST FINISHED BUILDING BACK WEEKS”
BUNDORAN 1970’S
WA
WA
WTETETR
&W
AW
AW
STETETRW
AW
AW
TETETRSER
VI
VI
VCECECS
SLIGO
ENV
IRO
NS C
ALT
RA
GH
SEWER
EXT
ENSIO
N
NAME: SLIGO AND ENVIRONS CALTRAGH SEWER EXTENSION CLIENT: SLIGO COUNTY COUNCILCONSULTANT ENGINEERS: JENNINGS O’ DONOVAN AND PARTNERS.CONTRACT DETAILS: CONSTRUCTION OF TWIN FOUL AND SURFACE WATER DRAINAGE IN 600MM AND 450MM PRECAST CONCRETE MANHOLES AND CHAMBER INCLUDING RAILWAY CROSSING.CG
A CARTY GROUP COMPANY
1980s“OUR HEADQUARTERS HAVE BEEN IN FERMANAGH 1950-1970, DONEGAL 1970-1980, BEFORE EVENTUALLY CHOOSING BALLISODARE, CO. SLIGO AS THE CENTER FOR OUR OPERATIONS IN THE LATE 1970S, OUR COMPANY HAS BEEN A VALUABLE EMPLOYER IN THE AREA EVER SINCE”
MA
MA
MR
ININIE
NE
NW
OW
OW
RK
SK
SK
&B
RIDIDI
GE
WO
WO
WR
KS
KS
K
KILK
IERN
AN
PIER&
KILLA
LAPIER
NAME: KILKERNAN PIER CLIENT: GALWAY COUNTY COUNCIL CONSULTANT ENGINEERS: MALACHY WALSH AND PARTNERS CONTRACT DETAILS: THE CONSTRUCTION OF 400M2 X 10M DEEP REINFORCED CONCRETE PIER. THIS INVOLVED SUB AQUA WORK IN TIDAL CONDITIONS.
CGA CARTY GROUP
COMPANY
NAME: KILLALA PIER CLIENT: MAYO COUNTY COUNCIL CONSULTANT ENGINEERS: MALACHY WALSH AND PARTNERS CONTRACT DETAILS: THE CONSTRUCTION OF NEW REINFORCED CONCRETE SLIPWAY AND RETAINING WALL AT KILALA PIER. THIS INVOLVED SUB AQUA DREDGING AND PILING WORK IN TIDAL CONDITIONS.
MA
MA
MR
ININIE
NE
NW
OW
OW
RK
SK
SK
&B
RIDIDI
GE
WO
WO
WR
KS
KS
K
CGA CARTY GROUP
COMPANY
BU
ND
OR
AN
DR
EDG
ING
& PIER
REFU
RB
ISHM
ENT
NAME: BUNDORAN CHANNEL WIDENINGCLIENT: RNLI & DONEGAL COUNTY COUNCIL CONSULTANT ENGINEERS: DONEGAL COUNTY COUNCIL CONTRACT DETAILS: THE CONSTRUCTION OF 400M2 X 10M DEEP REINFORCED CONCRETE PIER. THIS INVOLVED SUB AQUA WORK IN TIDAL CONDITIONS.
NAME: BUNDORAN PIER REFURBISHMENT & EXTENSIONCLIENT: DONEGAL COUNTY COUNCIL CONSULTANT ENGINEERS: DONEGAL COUNTY COUNCILCONTRACT DETAILS: DEEPENING AND WIDENING OF HARBOUR ENTRANCE THROUGH CONSTRUCTION OF A TEMPORARY CAUSEWAY, TIDAL ROCK BREAKING AND EXCAVATION OF UNDERWATER MATERIALS.
ENVIRONMENTAL WORKS“WORKING WITH THE NATURAL ENVIRONMENT COMES WITH IT’S OWN SPECIFIC SET OF CHALLENGES BUT WE AT THE CARTY GROUP FEEL THAT RESPECT OF THIS GOES ALONG WAY. THAT IS WHY WE HAVE WORKED IN SAC (SPECIAL AREAS OF CONSERVATION) AND COASTAL CONDITIONS ALL AROUND IRELAND”
MA
MA
MR
ININIE
NE
NW
OW
OW
RK
SK
SK
&B
RIDIDI
GE
WO
WO
WR
KS
KS
K
NAME: ROSSES POINT RNLI STATION & SLIPWAYCLIENT: ROYAL NATIONAL LIFEBOAT INSTITUTECONSULTANT ENGINEERS: JENNINGS O DONOVAN AND PARTNERSCONTRACT DETAILS: CONSTRUCTION ON THE NEW LIFEBOAT STATION AND 30M SLIPWAY INTO THE CHANNEL WAS COMPLETED IN 2002. IT HOUSES A D CLASS LIFEBOAT NAMED EISINORE AND FACILITIES FOR 22 VOLUNTEER CREW MEMBERS AND A LIFEBOAT SHOP.
CGA CARTY GROUP
COMPANY
RO
SSES POIN
T R
NLI B
OAT
HO
USE &
SLIPWAY
RNLI WORKS “WE HAVE DONE WORKS FOR THE RNLI AT BUNDORAN AND ROSSES POINT AND CONTINUALLY PROVIDE ASSISTANCE TO BUNDORAN RNLI WITH THEIR IMPORTANT FUNDRAISING PROGRAM”
MA
MA
MR
ININIE
NE
NW
OW
OW
RK
SK
SK
&B
RIDIDI
GE
WO
WO
WR
KS
KS
K
NAME: CLAREGALWAY TEMPORARY BRIDGE CLIENT: OFFICE OF PUBLIC WORKSCONSULTANT ENGINEERS: RYAN HANLEYCONTRACT DETAILS: DIVERSION OF THE 600MM AND 250MM MAIN GALWAY CITY SUPPLY TO FACILITATE AN ADDITIONAL ARCH ON THE CLAREGALWAY BRIDGE.
CGA CARTY GROUP
COMPANY
CLAR
EGA
LWAY
TEM
POR
AR
Y B
RID
GE W
OR
KS
LARGE FLEET“COMPLETING SUCH A LARGE VARIETY OF WORKS AT SUCH A LARGE VARIETY OF SCALES MEANS WE MUST HAVE A FLEXIBLE CONSTRUCTION FLEET WITH A WIDE VARIETY OF EXCAVATORS, TRUCKS, VANS, TANKERS, TRAILERS, OFF SET BOOMS, EXTENSION BOOMS, ROCK BREAKERS, ALU BUCKETS, ROLLERS, GENERATORS, LIGHTING TOWERS, BOATS, PONTOONS, WELDERS, POWER TOOLS, HAND TOOLS,OFFICES, COMPUTERS, PRINTERS, MOBILE PHONES, CONSTRUCTION MANAGERS, SKILLED EMPLOYEES..........ANDLUCKILY WE DO!
MA
MA
MR
ININIE
NE
NW
OW
OW
RK
SK
SK
&B
RIDIDI
GE
WO
WO
WR
KS
KS
K
CGA CARTY GROUP
COMPANY
BA
LLYSH
AN
NO
N FO
OT
BR
IDG
E
ESB NETWORKS: “CARTY CONTRACTORS HAS BEEN WORKING FOR THE ESB FOR OVER 30 YEARS AND IN THAT TIME HAVE COMPLETED A DIVERSE RANGE OF PROJECTS”
ESB PROJECTS• FOOTBRIDGE• FISH FARM• ELECTRICITY SUB STATIONS• DUCTING WORKS • POWER GENERATION STATIONS
NAME: BALLYSHANNON FOOTBRIDGE CLIENT: ESB INTERNATIONAL CONSULTANT ENGINEERS: ESB CONTRACT DETAILS: THE CONSTRUCTION OF A FOOTBRIDGE ACROSS THE RIVER ERNE IN BALLYSHANNON. THE PROJECT INVOLVED THE CONSTRUCTION OF ABUTMENTS ON EITHER BANK WITH THE ONLY ACCESS BEING FROM EITHER SIDE. INSTALLATION OF A PREFABRICATED STEEL BRIDGE, ACCESS RAMPS, LIGHTING AND PAVING.
MA
MA
MR
ININIE
NE
NW
OW
OW
RK
SK
SK
&B
RIDIDI
GE
WO
WO
WR
KS
KS
K
NAME: SLIGO AND ENVIRONS WEIR AND FOOTBRIDGE. CLIENT: SLIGO COUNTY COUNCIL CONSULTANT ENGINEERS: JENNINGS O DONOVAN AND PARTNERS CONTRACT DETAILS: CONSTRUCTION OF A WEIR AND FOOTBRIDGE 150M LONG OVER THE GARAVOGUE RIVER. THE PROJECT INVOLVED WORKS IN THE RIVER INCLUDING A COFFERDAM. CG
A CARTY GROUP COMPANY
SLIGO
AN
D EN
VIR
ON
S WEIR
& FO
OT
BR
IDG
E
SLIGO CITY“SINCE MOVING OUR HEADQUARTERS TO SLIGO WE’VE COMPLETED COUNTLESS PROJECTS IN THE CITY. THIS INCLUDES A WEIR, THREE GENERATIONS OF AN INDUSTRIAL NEIGHBORHOOD, THE CITY WATERWORKS, MILES OF DUCTING, SEWERS, PIPEWORK, FOOTPATHS, TARMAC, COBBLE STONE STREETS, STONE WALLS, UPGRADING THE INSTITUTE OF TECHNOLOGY CAMPUS AND THAT’S IN THE CITY ALONE”
DEV
EV
EV
LOPMPMP
EM
EM
NT
&B
UI
UI
ULILID
ININIG
WO
WO
WR
KS
KS
K
CGA CARTY GROUP
COMPANY
GLO
BE H
OU
SE REN
OV
ATIO
NS A
ND
RE-D
EVELO
PMEN
T
NAME: GLOBE HOUSE CLIENT: CARTY GROUPCONSULTANT ENGINEERS: JENNINGS O DONOVAN AND PARTNERS CONTRACT DETAILS: ORIGINALLY REDEVELOPED BY THE CARTY GROUP IN 1995 TO HOUSE THE ART DEPARTMENT OF SLIGO INSTITUTE OF TECHNOLOGY. IN 2003 CARTY GROUP RE DEVELOPED THE ENTIRE MERCY COMPLEX INCLUDING RESTORATION AND REDEVELOPMENT OF THE CHURCH AND RESIDENTIAL BUILDINGS TO FORM THE GLOBE HOUSE COMPLEX.
CARTY PROPERTIES“CARTY PROPERTIES JOINED THE CARTY GROUP TO BUILD A PROPERTY DEVELOPMENT BUSINESS AND PROPERTY PORTFOLIO WHICH COULD WORK IN PARTNERSHIP WITH THE CIVIL ENGINEERING AND CONSTRUCTION COMPANY”
DEV
EV
EV
LOPMPMP
EM
EM
NT
&B
UI
UI
ULILID
ININIG
WO
WO
WR
KS
KS
K
CGA CARTY GROUP
COMPANY
DR
UM
GA
LLON
COU
RT
HO
USIN
G D
EVELO
PMEN
T
NAME: DRUMGALLON COURTCLIENT: CARTY PROPERTIESCONTRACT DETAILS: A NEW DEVELOPMENT CONSISTING OF 8 X 2 BEDROOM APARTMENTS, 4 X 3 BEDROOM TOWNHOUSES, 7 X 4 BEDROOM TOWNHOUSES, OFF STREET PARKING AND ALL MODERN AMENITIES.DRUMGALLON COURT IS A MODERN DEVELOPMENT WITH A TRADITIONAL EXTERIOR DESIGN AND SUPERIOR BUILD QUALITY. THE CONTEMPORARY DWELLINGS ENCIRCLE A BEAUTIFULLY LANDSCAPED COURTYARD, THE ENVIRONS ARE RURAL YET THE AMENITIES ARE EASILY ACCESSIBLE.
DEV
EV
EV
LOPMPMP
EM
EM
NT
&B
UI
UI
ULILID
ININIG
WO
WO
WR
KS
KS
K
NAME: LISGREY GARDENS HOUSING DEVELOPMENT CLIENT: CARTY PROPERTIES IRELAND CONSULTANT ARCHITECT: DAVID MC CORMAC AND CO CONTRACT DETAILS: LISGREY GARDENS IS A MODERN DEVELOPMENT WITH CLEAN CUT DESIGN, AND SUPERIOR BUILD QUALITY. EACH HOUSE IS SITUATED ON A LARGE SITE WITH SPACIOUS GARDENS AND IS POSITIONED TO OPTIMIZE VIEWS OF THE AREA FROM EACH DWELLING. THIS DEVELOPMENT OF 48 HOUSES RANGES FROM THE FOUR BEDROOM DELUXE DETACHED SHEEHY - SKEFFINGTON, THE FOUR BEDROOM DETACHED BAILIE HOUSE, AND THE O’REILLY A THREE BEDROOM SEMI-DETACHED HOUSE.
CGA CARTY GROUP
COMPANY
LISGR
EY G
AR
DEN
S HO
USIN
G D
EVELO
PMEN
T
CARTY PROPERTIES “CARTY PROPERTIES IS COMMITTED TO THE DEVELOPMENT, RENTAL AND SALE OF PROPERTIES WHICH EMBODY QUALITY LOCATION, DESIGN, BUILD AND STANDARD OF FINISH”
HOUSING PROJECTS
• PORTBEG HOLIDAY HOMES, BUNDORAN, CO. DONEGAL
• DUNCARBERRY HEIGHTS, TULLAGHAN, CO. LEITRIM
• BOTHAR BUI, BALLYCONNELL, CO. CAVAN
• BOTHAR GLAS, BALLYCONNELL, CO. CAVAN
• ARD NA SI, MOHILL, CO. LEITRIM
• LISGREY GARDENS, BAILIEBOROUGH, CO. CAVAN
• DRUMGALLON COURT, ENNISKILLEN, CO. FERMANAGH
• RIVERSIDE APARTMENTS, GARRISON, CO. FERMANAGH
DEV
EV
EV
LOPMPMP
EM
EM
NT
&B
UI
UI
ULILID
ININIG
WO
WO
WR
KS
KS
K
NAME: PORTBEG HOLIDAY HOMES CLIENT: CARTY GROUPCONSULTANT ARCHITECT: MC MULLAN AND ASSOCIATES CONTRACT DETAILS: THIS EXCLUSIVE DEVELOPMENT OF 21 NO. FOUR STAR LUXURY HOLIDAY HOMES, IS IDYLLICALLY PLACED OPENING ONTO THE ATLANTIC OCEAN, WITH A VIEW OF BEN BENBULBIN TO THE EAST.
CGA CARTY GROUP
COMPANY
POR
TB
EG LU
XU
RY
HO
LIDAY
HO
MES
DEV
EV
EV
LOPMPMP
EM
EM
NT
&B
UI
UI
ULILID
ININIG
WO
WO
WR
KS
KS
K
CGA CARTY GROUP
COMPANY
NAME: STATION LANE HOUSING DEVELOPMENTCLIENT: MC GURRAN CONSTRUCTIONCONSULTANT ARCHITECT: DAVID MC CORMAC & ASSOCIATESCONTRACT DETAILS: EARTHMOVING AND SITE DEVELOPMENT OF A LARGE HOUSING DEVELOPMENT IN CAVAN TOWN FOR MC GURRAN CONSTRUCTION. DEVELOPING THE SITE INFRASTRUCTURE FROM SETTING OUT TO FULLY SERVICED SITES, ROADS, FOOTPATHS.
STATIO
N LA
NE H
OU
SING
DEV
ELOPM
ENT
SITE INFRASTRUCTURE DEVELOPMENT“THE CARTY GROUP HAS BEEN PROVIDING EARTHWORKS AND CIVIL ENGINEERING SERVICES TO BUILDING CONTRACTORS FOR OVER 30 YEARS, IN THE PAST 15 YEARS WE HAVE DEVELOPED OVER 30 RESIDENTIAL AND COMMERCIAL SITES”
DEV
EV
EV
LOPMPMP
EM
EM
NT
&B
UI
UI
ULILID
ININIG
WO
WO
WR
KS
KS
K
CA
RT
YPR
OPER
TIES
REN
TATATL
&SA
LESPPO
RT
FOLIO
CGA CARTY GROUP
COMPANY
CARTY PROPERTIES HAS DEVELOPED OVER 200 HOMES IN DONEGAL,CAVAN, LEITRIM, SLIGO AND FERMANAGH FROM 1998 - 2013. WE ARE CURRENTLY DEVELOPING, SELLING AND RENTING OVER 100 QUALITY DOMESTIC AND COMMERCIAL PROPERTIES
DEV
EV
EV
LOPMPMP
EM
EM
NT
&B
UI
UI
ULILID
ININIG
WO
WO
WR
KS
KS
K
NAME: MILL FALLS DEVELOPMENT CLIENT: KEVINSFORT DEVELOPMENTS ARCHITECT : RHATIGAN ARCHITECTS CONTRACT DETAILS: MILL FALLS, SET ON A BEAUTIFULLY MATURE SITE ALONG THE BANKS OF THE OWENMORE RIVER , IS DISTINGUISHED FROM MOST NEW DEVELOPMENTS BY IT’S HISTORY AND CHARACTER. THIS CONTRACT INVOLVED CAREFUL WORKING ALONGSIDE AND RENOVATING THE 1830 STRUCTURES AS WELL AS EXTENSIVE CONCRETE WORKS AND FISHERMAN’S PASS ALONGSIDE THE RIVER.
CGA CARTY GROUP
COMPANY
MILL FA
LLS DEV
ELOPM
ENT
DEVELOPMENT PARTNERS
LONG TERM RELATIONSHIPS“75 YEARS OF BUSINESS HAS ALLOWED US TO BUILD UP GOOD RELATIONSHIPS WITH MANY DEVELOPERS AND CONTRACTORS”
COR
POR
ATETETCICICV
IV
IV
LILIEN
GININI
EN
EN
ERINNINI
GW
OW
OW
RK
SK
SK
CGA CARTY GROUP
COMPANY
NAME: ASHAI POWER GENERATOR CIVIL WORKSCLIENT: INDUSTRIAL DEVELOPMENT AGENCY IRELAND CONSULTANT ENGINEER: SHANAHAN ENGINEERINGCONTRACT DETAILS: CONSTRUCTION OF A 650M’ REINFORCED CONCRETE BASE FOR THE POWER GENERATOR AT ASHAI, CO. MAYO. ASSOCIATED DUCTING, SITE-WORKS AND SAFETY REQUIREMENTS.
NAME: EMERGENCY GENERATING PLANT, ASHAICLIENT: ESB INTERNATIONAL CONSULTANT ENGINEER: ESB INTERNATIONALCONTRACT DETAILS: CONSTRUCTION OF SITE INFRASTRUCTURE AND COMPOUNDS FOR EMERGENCY GENERATING PLANT.
SELECTED
ESB PR
OJECT
S
CORPORATE RESPONSIBILITY“ WORKING FOR LARGE NATIONAL AND MULTI NATIONAL COMPANY MEANS WE AT THE CARTY GROUP MUST HOLD OURSELVES TO INTERNATIONAL STANDARDS, WE OPERATE UNDER AND INTERNATIONAL AL STANDARDS ORGANIZATION RECOGNIZED QUALITY CONSTRUCTION ORGANIZATION MODEL AND A INTERNATIONALLY STANDARD ORGANIZATION RECOGNIZED SAFETY MODEL.”
CGA CARTY GROUP
COMPANY
NAME: ROSCOMMON RETAIL PARKCLIENT: BRIDGE STOCK IRELAND CONTRACT DETAILS: DEVELOPMENT OF A RETAIL PARK IN ROSCOMMON TOWN INCLUDING MAJOR GROUND STABILIZATION AND INFRASTRUCTURAL ROADWORKS.
RO
SCOM
MO
N R
ETAIL PA
RK
COR
POR
ATETETCICICV
IV
IV
LILIEN
GININI
EN
EN
ERININI
GW
OW
OW
RK
SK
SK
CGA CARTY GROUP
COMPANY
SELECTED
IDA
PRO
JECTS
COR
POR
ATETETCICICV
IV
IV
LILIEN
GININI
EN
EN
ERININI
GW
OW
OW
RK
SK
SK
NAME: LETTERKENNY BUSINESS AND TECHNOLOGY PARKCLIENT: INDUSTRIAL DEVELOPMENT AUTHORITY IRELAND CONSULTANT ENGINEER: TJ O’CONNOR & ASSOCIATESCONTRACT DETAILS: CONSTRUCTION OF 1KM OF ROAD NETWORK WITH ALL SERVICES AND LANDSCAPING. SERVICES INCLUDE 1500M OF FOUL AND STORM SEWERS, 2000M OF WATER-MAINS AND 15000M OF DUCTING.
NAME: FOUL SEWER LETTERKENNY BUSINESS AND TECHNOLOGY PARKCLIENT: INDUSTRIAL DEVELOPMENT AUTHORITY IRELAND CONSULTANT ENGINEER: TJ O’CONNOR & ASSOCIATESCONTRACT DETAILS: CONSTRUCTION OF FOUL SEWER & ASSOCIATED MANHOLES
NAME: FINNISKILLEN BUSINESS PARK STREET LIGHTINGCLIENT: INDUSTRIAL DEVELOPMENT AGENCY IRELAND CONSULTANT ENGINEER: RYAN HANDLEYCONTRACT DETAILS: REFURBISHMENT OF EXISTING ESTATE INCLUDING REPLACEMENT CURBING, PAVEMENT WORKS, PUBLIC LIGHTING SYSTEM, DRAINAGE AND LANDSCAPING.
CGA CARTY GROUP
COMPANY
NAME: SLIGO BUSINESS AND TECHNOLOGY PARKCLIENT: INDUSTRIAL DEVELOPMENT AUTHORITY IRELAND CONSULTANT ENGINEER: RYAN HANLEY CONTRACT DETAILS: CONSTRUCTION OF A NEW BUSINESS PARK INCLUDING, ROAD WORKS, STORM AND FOUL SEWERS, WATER MAINS, DUCTING AND ALL ASSOCIATED WORKS AND LANDSCAPING.
SLIGO
BU
SINESS A
ND
TEC
HN
OLO
GY
PAR
KCO
RPO
RATETET
CICICVI
VI
VLILI
ENG
ININIE
NE
NER
ININIG
WO
WO
WR
KS
KS
K
75 YEARS OF CONTINUED SERVICE“ WHEN WE TAKE ON A NEW CLIENT WERE NOT THINKING ABOUT THE SHORT TERM, THE CARTY GROUP PRIDES ITSELF ON FORMING LONGSTANDING PARTNERSHIPS WITH OUR CLIENTS, SUB CONTRACTORS, EMPLOYEES AND CONSULTANTS. WE HAVEN’T BEEN IN BUSINESS FOR 75 YEARS AND COMPLETED MILLIONS OF EURO OF WORK WITHOUT FORMING MANY STRONG BONDS ALONG THE WAY.”
CARTY GROUPBALLISODARE
CO. SLIGO071 91 67788
info @cartygroup.comwww.cartygroup.com
CARTY BROTHERS 1970AIDEN CARTY, SEAMUS CARTY, PATRICK CARTY