8/13/2019 Camparative Statement Hortifinal H 1 to H 4
1/8
H-1
Note : The rates are inclusive of all taxes etc and for
estimation purpose only
Increase Decrea
se
1 2 3 4 5 6 7 8
1.1 Supply of dry manure including loading unloading
transportation & stacking at site :
1.1.1 Fram Yard Manure (Organic) Cum 300.00 300.00 0.00
1.1.2 Compost Cum 350.00 350.00 0.00
1.1.3 Goat Dungmanure Cum 500.00 500.00 0.00
1.2 Supply of Chemical Fertilizers at store in bags
weighing not less than 50 Kg each includingloading unloading & transportation etc.
1.2.1 Urea Per 50
Kg Bag220.00 220.00
0.00
1.2.2 D.A.P. Per 50
Kg Bag550.00 550.00
0.00
1.2.3 Super Phosphate Per 50
Kg Bag300.00 300.00
0.00
1.2.4 Murrate of Photash Per 50
Kg Bag450.00 450.00
0.00
1.2.5 Straw Meal Per 50
Kg Bag900.00 900.00
0.00
1.3 Supply & Stacking good earth at site complete
including loading unloading & transportation etc. Cum 75.00 75.00 0.00
1.4 Supply of Insecticides & Pesticides at store in dust
/ liquid form complete :
1.4.1 Methyl Prathion 2 % Per 25
Kg Bag400.00 400.00
0.00
1.4.2 Karathion (Liquid) Per 250
ml300.00 300.00
0.00
1.4.3 Metacid (Liquid) Per Litre 370.00 370.00 0.00
1.4.4 Roger (Liquid) Per Litre 280.00 280.00 0.00
1.4.5 Cholorophyriphos 20 Ec Per Litre 325.00 325.00 0.00
1.4.6 Bauiston 50 % Per 100
Grms100.00 100.00
0.00
Proposed
Rate (Rs.)2007
% Variation
CHAPTER H-1
SUPPLY OF MANURE, INSECTICIDES, PLANTS, POTS, T & P ETC
Chapte
r Code
No. Description Unit
Rate (Rs)
2005
Reason
for
variation
8/13/2019 Camparative Statement Hortifinal H 1 to H 4
2/8
H-2
Increase Decrea
se
1 2 3 4 5 6 7 8
Proposed
Rate (Rs.)
2007
% VariationChapte
r Code
No.Description Unit
Rate (Rs)
2005
Reason
for
variation
1.5 Supply of Garden Tools & Implements at store
complete :
1.5.1 Spade weighing 1.5 Kg with handle Each 75.00 75.00 0.00
1.5.2 Khurpa weighing 500 gm with handle Each 45.00 45.00 0.00
1.5.3 Gurvana weighing 800 gm with handle Each 60.00 60.00 0.00
1.5.4 Hedge Shear (Kamani Steel) Each 275.00 275.00 0.00
1.5.5 Secaetur Each 150.00 150.00 0.00
1.5.6 Garden Rack with handle Each 60.00 60.00 0.00
1.5.7 Pick - Axe Each 90.00 90.00 0.00
1.6 Supply of different sized pots at site store
including loading Unloading & transportation etc.
1.6.1 Cement pot 300 mm Size Each 46.00 46.00 0.00
1.6.2 Cement Pot 350 mm size Each 65.00 65.00 0.00
1.6.3 Asbestos Pot 350 mm size Each 46.00 46.00 0.00
1.7 Supply of different sized earthen pots at site / store
including loading unloading & transportation etc.
complete :
1.7.1 Earthen Pot 150 mm size Each 6.00 6.00 0.00
1.7.2 Earthen Pot 225 mm size Each 10.00 10.00 0.00
1.7.3 Earthen Pot 300 mm size Each 15.00 15.00 0.00
1.8 Supply of different sized lawn mower including
transportation etc. as store complete :
1.8.1 300 mm size Hand Lawn Mower Each 2200.00 2200.00 0.00
1.8.2 350 mm size Hand Lawn Mower Each 2500.00 2500.00 0.00
1.8.3 450 mm size Hand Lawn Mower Each 3800.00 3800.00 0.00
1.8.4 500 mm size Hand Lawn Mower Each 4800.00 4800.00 0.00
1.8.5 600 mm size Hand Lawn Mower Each 5500.00 5500.00 0.00
1.9 Supply of different size Tokaras / Tokaris etc. at
store complete :
1.9.1 Big Size (600 mm dia) Each 35.00 35.00 0.00
8/13/2019 Camparative Statement Hortifinal H 1 to H 4
3/8
H-3
Increase Decrea
se
1 2 3 4 5 6 7 8
Proposed
Rate (Rs.)
2007
% VariationChapte
r Code
No.Description Unit
Rate (Rs)
2005
Reason
for
variation
1.9.2 Small Size (450 mm dia) Each 25.00 25.00 0.00
1.10 Supply of P.V.C. hose pipe of different sizes at
Store including transportation etc. complete :
1.10.1 50 mm dia R. Mtr 100.00 100.00 0.00
1.10.2 38 mm dia R. Mtr 85.00 85.00 0.00
1.10.3 25 mm dia R. Mtr 40.00 40.00 0.00
1.11 Supply of different H.P. Motor pumps submersible
pumps / Multistaged pumps at store including
transportation etc. complete :
1.11.1 Motor Pumps 5 H.P. ISI Marked Each 9230.00 9230.00 0.00
1.11.2 Motor Pumps 7.5 H.P. ISI Marked Each 11830.00 11830.00 0.00
1.11.3 Motor Pumps 10 H.P. ISI Marked Each 14130.00 14130.00 0.00
1.11.4 Submersible Pumps 3 H.P. ISI Marked KSB Each 16000.00 16000.00 0.00
1.11.5 Submersible Pumps 5 H.P. ISI Marked KSB Each 19000.00 19000.00 0.00
1.11.6 Submersible Pumps 10 H.P. ISI Marked KSB Each 25000.00 25000.00 0.00
1.12 Supply of different varities of tree/ shrubs/
climbers according to height and age of the plant at
site including loading/ unloading & transportation
etc. complete :
1.12.1 Different flowing plants 900 mm to 1500 mmEach
15.00 to
40.00
15.00 to
40.00
1.12.2 Different varities of shrubs 600 mm to 900 mmEach
12.00 to
25.00
12.00 to
25.00
1.12.3 Different varities of Climber 900 mm to 1500 mmEach
25.00 to
50.00
25.00 to
50.00
1.13 Supply of different varieties of Bougainvillea in
poly bags/ earthen pots according to height,
growth and age of plant at site including loading/unloading & transportation etc. complete :
1.13.1 Local Variety of Bougainvillea 600 mm to 900
mmEach
10.00 to
25.00
10.00 to
25.00
1.13.2 Different Varieties of Bougainvillea 600 mm to
900 mmEach
25.00 to
40.00
25.00 to
40.00
1.14 Supply of different varieties of Rose plants in
Polyethylene bags/ earthen pots according to
height , growth and age of the plant at site
including loading/ unloading & transportation etc.
8/13/2019 Camparative Statement Hortifinal H 1 to H 4
4/8
H-4
Increase Decrea
se
1 2 3 4 5 6 7 8
Proposed
Rate (Rs.)
2007
% VariationChapte
r Code
No.Description Unit
Rate (Rs)
2005
Reason
for
variation
1.14.1 Desi Rose / Root Stock Plants/ GanganagriEach
10.00 to
15.00
10.00 to
15.00
1.14.2 Different varieties of Grafted Rose PlantEach
30.00 to
50.00
30.00 to
50.00
1.15 Supply of different varieties of Palms in
polyethylene bags/ earthen pots according to
height , growth and age of the plant at site
including loading/ unloading & transportation etc.
Each
25.00 to
50.00
25.00 to
50.00
1.16 Supply of different varieties of Palms indoor plants
in polythene bags/ earthen pots according to
height , growth and age of the plant at site
includin loadin / unloadin & trans ortation etc.
1.16.1 Desi CrotonsEach
30.00 to
40.00
30.00 to
40.00
1.16.2 Selective Varieties of CrotonsEach
40.00 to
60.00
40.00 to
60.00
1.16.3 Rubber Plants etc.Each
80.00 to
100.00
80.00 to
100.00
1.16.4 Daffen BachiaEach
100.00 to
200.00
100.00 to
200.00
1.16.5 Arecca Palm
Each
200.00 to
400.00
200.00 to
400.00
1.16.6 Song of IndiaEach
80.00 to
150.00
80.00 to
150.00
1.16.7 AglonmiaEach
80.00 to
100.00
80.00 to
100.00
1.16.8 DrassinaEach
80.00 to
100.00
80.00 to
100.00
1.16.9 Singonium with Moss StickEach
125.00 to
250.00
125.00 to
250.00
1.16.10 MiscellaneousEach
100.00 to
250.00
100.00 to
250.00
8/13/2019 Camparative Statement Hortifinal H 1 to H 4
5/8
H-13
Note :- The Rates are inclusive of all taxes etc. and for
estimation purpose only.
Increa
se
Decreas
e
1 2 3 4 5 6 7 8
2.1 Maintenance of Lawns :
2.1.1 Spreading of manure and good earth in required
thickness (Cost of manure and good earth to be paid
separately). Cum 4.00 4.00 0.00
2.1.2 Irrigation of Lawns
Per HectPer Day -- --
2.1.3 Uprooting weeds from the lawn plots and treched
area after 10 to 15 days of its flooding with
including disposal of uprooted vegetation.
100
Sqm 150.00 150.00 0.00
2.1.4 Mowing manually / with power machines
a) Manually
Per Hect 1000.00 1000.00 0.00
b) With power machines
Per Hect 800.00 800.00 0.00
2.1.5 Maintenance of Shrubbary or hedge cutting
inlcuding disposal of rubbish with all leads & lifts.
100
Sqm 300.00 300.00 0.00
2.1.6 Sweeping / Cleaning of Garden roads. Lawns &
Paths & disposal of all rubbish.
Per 100
Sqm 1.50 1.50 0.00
2.1.7 Security of the Garden per gate for 24 Hours in 3
Shift with the exilitary persons.
Per Day
(24
Hours) -- --
2.1.8 Maintenance / Fittig of permanent ornamental pots/
Seasonal plots
Per 50
Kg Bag 900.00 900.00 0.00
(a) Mixing earth and manure inproporotion as specified
or directed for pots Cum 30.00 30.00 0.00
(b) Filling and planting of sapplings and watering of
plots
Per 100
Pots Per
day 50.00 50.00 0.00
Proposed Rate
(Rs.)
2007
% Variation
CHAPTER - H-2
MAINTENANCE OF GARDENS
Chapt
erCode
No.Description Unit
Rate
(Rs)
2005
Reason for
variation
8/13/2019 Camparative Statement Hortifinal H 1 to H 4
6/8
H-14
Increa
se
Decreas
e
1 2 3 4 5 6 7 8
Propose
d Rate
(Rs.)
2007
% VariationChapt
er
Code
No.Description Unit
Rate
(Rs)
2005
Reason for
variation
(c) Weding Hoeing, stacking & colouring of pots
material will be supplied by the department
Per 100
Pots Perday 50.00 50.00 0.00
2.1.9 Preparation of beds for bedging and shrubbary by
excavating 60 cms deep and trenching the
excavated base to a further depth of 30 cms
refilling the excavated earth after breaking clods &
mixing with manure in the ratio 8 : 1 ( 8 Parts of
stacked volume of earth after reduction by 20 % one
part of stacking volume of manure after reduction
by 8% flooding with water filling with earth if
necessary (Cost of manure of extra earth to be paid
for separately) Each 10.00 10.00 0.00
2.2 Digging pits in ordinary soil & refilling the same
with the excavated earth mixed with manure in the
ratio of 2 : 1 by volume (2 parts of stacked volume
of earth after reduction by 20 % 1 parts of stacked
volume of manure after reduction by 8 %) flooding
with water and dressing including removal of
surplus earth (Cost of manure or extra good earth if
needed to be paid separately) pit dia 60 cm x 60 cm
deep Each 10.00 10.00 0.00
2.3 Planting of annual sapplings watering in the bed Sqm 0.50 0.50 0.00
2.4 Watering of group plantation at the bed Sqm 0.10 0.10 0.00
2.5 Preparation of eding cutting Lawn Sqm 0.25 0.25 0.00
2.6 Group plantation in the bed specified place Sqm 1.00 1.00 0.00
8/13/2019 Camparative Statement Hortifinal H 1 to H 4
7/8
81
Note :- The Rates are inclusive of all taxes etc. and for
estimation purpose only.
Increase
Decrease
1 2 3 4 5 6 7 8
3.1 Laying of lawns including ploughing levelling
breaking of clods manuring & removal of stones etc.
(Cost of manure or extra good earth to be paid
separately) Maintenance of lawns for 30 days or
more till the grass forms a thick lawns free from
weeds & fit for moving in the duration of planting if
lawn die some where the contractor will replant it at
his own cost
3.1.1 In rows 15 cms apart in either direction 100
Sqm 1000.00 1000.00 0.00
3.1.2 In rows 7.5 cms apart in either direction 100
Sqm 1500.00 1500.00 0.00
3.1.3 In rows 5 cms apart in either direction 100
Sqm 2000.00 2000.00 0.00
3.2 Renovating lawns including weeding cheeling the
grass forking the ground top dressing with manure
Mixing the same with forked soil watering
maintaining the lawns for 30 days or more till grass
forms a thick lawns free from weeds & fit for
moving & disposal of rubbish as directed.
100
Sqm 3000.00 3000.00 0.00
3.3 Planting of trees / Shrubs/ hedge & climbers plants
at desired distance in a row & watering.
100
Plants 10.00 10.00 0.00
3.4 Preparation of different sized beds as directed. 100
Sqm 300.00 300.00 0.00
Proposed
Rate
(Rs.)2007
% Variation
CHAPTER - H-3
DEVELOPMENT OF GARDENS
Chapt
er
CodeNo.
Description Unit
Rate
(Rs)
2005
Reason
for
variation
8/13/2019 Camparative Statement Hortifinal H 1 to H 4
8/8
H-88
Increa
se
Decrea
se
1 2 3 4 5 6 7 8
1
a) Preparation of soil including cleaning & removing
of unwanted shrubs removal of stones & garbage.
Per 100
Sqm 80.00 80.00 0.00
b) Digging of pits size 60 x 60 x 60 cms including
removal of stones. Manuring applicable of
insecticides & watering atleast 15 litre per plant
after planting. Per Pit 15.00 15.00 0.00
c) Loading & unloading of plants from Deptt
Nursery to site Per Km.
Per 1000
Plants 80.00 80.00 0.00
d) Preparation of Thawala sizing 60 cms Diametre &
10 cms Deep once in a month.
Per
Thawala 0.50 0.50 0.00
e) Inter cultural operation hoeing & weeding etc, in
90 cms Dia & 15 cms deep. Per Plants 0.60 0.60 0.00
f) Watering of plants with the own tanker i.e.at least
20 Litre water for plant at one time. Per Plants 0.50 0.50 0.00
g) Transportation of tree guards from Depot to the
plantation site including loading & unloading.
Per Tree
Guard 10.00 10.00 0.00
h) Security of plants & fencing etc. Per PlantPer Month 0.50 0.50 0.00
i) Prunning & trumming and cutting of old big trees
on the road side. The contractor will deposit the
cut wood in the Deptt. Per Tree 30.00 30.00 0.00
2 Maintenance of plants by the contractor including
of pits / bids watering preparation of Thawala
Hoeing weeding etc. & application of insecticides
etc. & security if the plant die during maintenance
contractor has to replace same height plant at his
own cost.
Per Plant
Per Month 10.00 10.00 0.00
Propos
ed
Rate
(Rs.)
2007
% Variation
CHAPTER - H-4
MAINTENANCE OF ROAD SIDE PLANTATION
Chapt
er
Code
No.Description Unit
Rate
(Rs)
2005
Reason for
variation
Recommended