‘BIM Use in Social Housing with Westminster Council’

Building Information Modelling (BIM)

Presenting todayPatrick KingAssociate Director & Head of BIM Technologies

Agenda

• Introduction

• Implementing BIM for Councils

• BIM Pilot Project

• Conclusion

Introduction

4

Public

Participation

Consultation &

Research

Project Management,

Cost Consultancy,

Building Surveying

and Principal

Designer Services

Architecture

Masterplanning

Urban Design

Energy &

Sustainability

Consultancy

Group Overview

5

Award Winning Designs

6

7

Office in London & Glasgow

8

Our Team

9

Three Year Process:

All projects delivered using BIM processes & modelling

techniques.

1. Training & Support from the Top Down

• ALL Directors have completed the BRE BIM

Level 2 Essentials Course

2. Upskilling ALL staff

• Over 90% are Revit Certified Professionals

• All Staff receive 4 hours per month of BIM &

Revit training

• All Senior Staff to complete BIM Essentials

• ECD YouTube & Vimeo channel for Staff

training

3. Modelling Tools

• Revit • Navisworks • Cato • Dynamo • AutoCAD

4. ECD Standards & Validation Procedures

• Development of ECD Standards, Methods &

Procedures Documents & Modelling Templates

• Validation of Models using DynamoBIM for

Office/BS Standards and BIM LOD/LOI

compliance

• Validation of Models using Navisworks for

Coordination

Implementing BIM for Councils

Three new priorities for Westminster City Council.

BUILDING HOMES AND CELEBRATINGNEIGHBOURHOODS.

GREENER CITY

SMART

COUNCIL

BIM Implementation on Pilot Projects

STAGE 3

Work stream

• Pilot Project Review

• User Group Workshop

• Client Training

• Document Development

• KPI Assessment

1

2

3

4

5

STAGE 1

Work stream

• Implementation plan

• Capability Assessment

• User Group setup

• Workshops

• Document creation

• Procurement & Legal Documents

STAGE 2

Work stream

• Procurement of Pilot Project

• Team Capability Assessment

• Project Set Up & Workshops

• Client Document review & feedback

• KPI Assessment

STAGE 4

Work stream

• Pilot Project Review (Design Team)

• User Group Workshops

• Smart City Review & Strategy

• Document creation

• Procurement & Legal Review

• KPI Assessment

STAGE 5

• Pilot Project Deliver Review

• User Group Workshop Review

• Capability Assessment of WCC

• Workshops

• Document Review & Signoff

• Procurement & Legal Review

• Business case of BIM Review

SMP Document Creation

Westminster City Council BIM Business Case

Lessons Learned

Smart City Approach

BIM Assessment

BIM Workshop Group

ProcurementBIM

Finance

Asset

Management

Project

Managers

Policy Legal

(OIR)

EIR)

(AIR)

(OIR)

EIR)

(AIR)

BIM Business Case

WCC Project Implementation Documents

BIM Pilot Project

Ashbridge Street

Proposed development on this site to deliver 26

new affordable homes.

Design principles• Create a gateway to the neighbourhood and kick-off the

masterplan's aim to make a greener neighbourhood

• Public realm enhancements to Ashmill Street and

courtyard behind existing building

• Building height of new development should have

appropriate relationship with neighbouring buildings

• Hybrid green/blue or brown roofs

Existing situationBT repeater station

Homes• 26 new homes

• 4-5 storey building

Client Suppliers Submission

RIBA Stage 1&2

BIM Pilot Project

(OIR)

RIBA Stage 1 BIM Kick-off Meeting

RIBA Stage 1&2

Design Model

QS Cost Model Client

RIBA Stage 3&4

BIM Pilot Project

(OIR)

RIBA Stage 3&4 BIM Kick-off Meeting

(OIR)

TIDP Programme

Information Exchange Process

Design Team Models

S1.P1

File Naming Convention1564_ECD_00_XX_M3_A_PROPOSED_S1.P1

Suitability

Shared

S1 Issued for co-ordination

S2 Issued for information

S3 Issued for internal

review and comment

S4 Issued for construction

approval

S5 Issued for manufacture

S6 Issued for PIM

authorization (Information

Exchanges 1-3)

S7 Issued for AIM

authorization (Information

Exchange 6)

D1 Issued for costing

D2 Issued for tender

D3 Issued for contractor

design

D4 Issued for

manufacture/procurement

Validation Process

Design Model

QS Cost Model Client

Information Checks for

Costing (LOI)

Checker for Asset

Information (AIR)

Design Coordination & Clash Validation

Client Model Review

Coordination Meeting

BIM Pilot Project Delivery

Gateway/Approval

2D Information Delivery BIM Model Delivery

Conclusion

BIM Pilot Project Lesson Learned

(OIR)The building is Data- Based

Information model

01

02

03

04

05

BIM

Change in design team workflow

Strong understanding of what is

required (PAS1192,EIR & BEP)

Stakeholder engagement in using the model

Sharing knowledge and training the team

Faster and better quality of information delivered

Thank youECD Architects Ltd