‘BIM Use in Social Housing with Westminster Council’
Building Information Modelling (BIM)
Presenting todayPatrick KingAssociate Director & Head of BIM Technologies
Agenda
• Introduction
• Implementing BIM for Councils
• BIM Pilot Project
• Conclusion
Introduction
4
Public
Participation
Consultation &
Research
Project Management,
Cost Consultancy,
Building Surveying
and Principal
Designer Services
Architecture
Masterplanning
Urban Design
Energy &
Sustainability
Consultancy
Group Overview
5
Award Winning Designs
6
7
Office in London & Glasgow
8
Our Team
9
Three Year Process:
All projects delivered using BIM processes & modelling
techniques.
1. Training & Support from the Top Down
• ALL Directors have completed the BRE BIM
Level 2 Essentials Course
2. Upskilling ALL staff
• Over 90% are Revit Certified Professionals
• All Staff receive 4 hours per month of BIM &
Revit training
• All Senior Staff to complete BIM Essentials
• ECD YouTube & Vimeo channel for Staff
training
3. Modelling Tools
• Revit • Navisworks • Cato • Dynamo • AutoCAD
4. ECD Standards & Validation Procedures
• Development of ECD Standards, Methods &
Procedures Documents & Modelling Templates
• Validation of Models using DynamoBIM for
Office/BS Standards and BIM LOD/LOI
compliance
• Validation of Models using Navisworks for
Coordination
Implementing BIM for Councils
Three new priorities for Westminster City Council.
BUILDING HOMES AND CELEBRATINGNEIGHBOURHOODS.
GREENER CITY
SMART
COUNCIL
BIM Implementation on Pilot Projects
STAGE 3
Work stream
• Pilot Project Review
• User Group Workshop
• Client Training
• Document Development
• KPI Assessment
1
2
3
4
5
STAGE 1
Work stream
• Implementation plan
• Capability Assessment
• User Group setup
• Workshops
• Document creation
• Procurement & Legal Documents
STAGE 2
Work stream
• Procurement of Pilot Project
• Team Capability Assessment
• Project Set Up & Workshops
• Client Document review & feedback
• KPI Assessment
STAGE 4
Work stream
• Pilot Project Review (Design Team)
• User Group Workshops
• Smart City Review & Strategy
• Document creation
• Procurement & Legal Review
• KPI Assessment
STAGE 5
• Pilot Project Deliver Review
• User Group Workshop Review
• Capability Assessment of WCC
• Workshops
• Document Review & Signoff
• Procurement & Legal Review
• Business case of BIM Review
SMP Document Creation
Westminster City Council BIM Business Case
Lessons Learned
Smart City Approach
BIM Assessment
BIM Workshop Group
ProcurementBIM
Finance
Asset
Management
Project
Managers
Policy Legal
(OIR)
EIR)
(AIR)
(OIR)
EIR)
(AIR)
BIM Business Case
WCC Project Implementation Documents
BIM Pilot Project
Ashbridge Street
Proposed development on this site to deliver 26
new affordable homes.
Design principles• Create a gateway to the neighbourhood and kick-off the
masterplan's aim to make a greener neighbourhood
• Public realm enhancements to Ashmill Street and
courtyard behind existing building
• Building height of new development should have
appropriate relationship with neighbouring buildings
• Hybrid green/blue or brown roofs
Existing situationBT repeater station
Homes• 26 new homes
• 4-5 storey building
Client Suppliers Submission
RIBA Stage 1&2
BIM Pilot Project
(OIR)
RIBA Stage 1 BIM Kick-off Meeting
RIBA Stage 1&2
Design Model
QS Cost Model Client
RIBA Stage 3&4
BIM Pilot Project
(OIR)
RIBA Stage 3&4 BIM Kick-off Meeting
(OIR)
TIDP Programme
Information Exchange Process
Design Team Models
S1.P1
File Naming Convention1564_ECD_00_XX_M3_A_PROPOSED_S1.P1
Suitability
Shared
S1 Issued for co-ordination
S2 Issued for information
S3 Issued for internal
review and comment
S4 Issued for construction
approval
S5 Issued for manufacture
S6 Issued for PIM
authorization (Information
Exchanges 1-3)
S7 Issued for AIM
authorization (Information
Exchange 6)
D1 Issued for costing
D2 Issued for tender
D3 Issued for contractor
design
D4 Issued for
manufacture/procurement
Validation Process
Design Model
QS Cost Model Client
Information Checks for
Costing (LOI)
Checker for Asset
Information (AIR)
Design Coordination & Clash Validation
Client Model Review
Coordination Meeting
BIM Pilot Project Delivery
Gateway/Approval
2D Information Delivery BIM Model Delivery
Conclusion
BIM Pilot Project Lesson Learned
(OIR)The building is Data- Based
Information model
01
02
03
04
05
BIM
Change in design team workflow
Strong understanding of what is
required (PAS1192,EIR & BEP)
Stakeholder engagement in using the model
Sharing knowledge and training the team
Faster and better quality of information delivered
Thank youECD Architects Ltd