Part of an extensive construction supply chain
Budget & program
Prioritising products
Software decision
File size vs. detail
Uniform classification
Creation of full time BIM roles
Analytics vs. simple access
Challenges
ImplementPlan Review
Management buy in
Staff engagement
Listen to clients!
Training
Content creation
Communicate capabilities
Creation of full time roles
Client feedback
Internal workflow
“Integrating the coordinated Revit
model was a huge benefit for the
team on site at Westgate Oxford.
We were able to run a clash
detection enabling the engineers
to effectively plan works and
inform our programme, and
communicate this to the wider
team.”
Anna Louise Wylie MEng, BIM AP,
Graduate Digital Engineer
Laing O'Rourke
“Your sequencing drawing was
printed out large, laminated and
various copies cable tied to the
edge of the excavation. This in
turn, aided in the H&S of the
scheme as the site operatives had
prior knowledge and
understanding of the purpose of
the scheme thus allowing them to
plan accordingly.
It also highlighted possible
construction constraints we could
encounter on site through the
process. It brought upon questions
from all levels of the site team that
ordinarily may not have been
raised.”
Shaun May Temporary Works Design
Engineer
Interserve Construction