Decommissioned Roads

• Most in Myrtle Creek Watershed• Boundary Creek Watershed• Proposed Decom. in Boulder Cr. and Myrtle

Cr.

Myrtle CreekRoad Network Mileage

1309 0.7

2400 0.4

2405 12.0

633 2.7

Total 15.8

Completed:

Proposed:

Road Network Mileage

2411 8.8

2692 1.3

Total 10.1

2008 IDEQ Integrated Report Impairments

Water Temperature

2405A-Deep Ripping

1309-Full Recontour

Boundary Creek

Road Network Mileage

2450 5.65

Completed:

2008 IDEQ Integrated Report

EPA Approved TMDL for Temperature

Boulder Creek (Proposed)Road Network Mileage

2112 2.0

2173 2.4

2627 4.2

Total

8.6

2008 IDEQ Integrated Report Impairments

Temperature

Combined Biota/Habitat Bioassessments

Proposed:

Summary

Watershed Miles of road completed

Myrtle Creek 15.75

Boundary Creek 5.65

TOTAL 21.4

Watershed Miles of road proposed

Myrtle 10.1

Boulder 8.6

Total 18.7