“A River Ran Through It”F

Flash flooding in Nichols NY, Tioga CountyJuly 24, 2017

By: Dave Hensberry, EIT

2

• Location map

• History

• Hydrology/Hydraulics

• Coincident Flow Analysis

• Lessons Learned

3

NYS Route 282 over Wappasening Creek

NYS Route 17 (I-86) over Wappasening Creek

4

Wappasening Creek Watershed

Susquehanna River

Wappasening Creek

Nichols

NY/ PA Border

5

History

6

Hurricane Irene and Tropical Storm Lee

August 28th & 29th 2011 September 8th & 9th 2011

Courtesy Wayne Gannett, PE (next 2 slides)

7

Tropical Storm Lee

• Stalled over NY/PA for 48 hours• Estimated 10” – 12” of rainfall • Exceeding flood of 2006• Many evacuations• Ground saturated

8

Wappasening Creek Watershed

• 66% Forested• Valley Type VII• Bank-Full Width = 82 ft.• Bank-Full Depth = 3.66 ft.• Flood Prone Width = 228.63 ft.• Sinuosity = 2.4• Mean Discharge = 1060 CFS• Mean Velocity = 3.55 fps• Rosgen Stream Classification = C3

New England Environmental, Inc. “LTSRS Outline for Natural Resources”

9

Comparison

2009 2017

10

Comparison

2009 2017

11

12

Nov 18, 2002

Pre-Flood

Looking south

November 18, 2002

Post-Flood

Looking north

September 15, 2011

13

14

Nichols, NY

15

16

17

Windham Gage Tabulated

18

USGS Stream-Stats

Stream-Stats, New York

July 24, 201710,600 CFS

19

Susquehanna Gage Tabulated

20

6,600 CFS

21

NCHRP Project 15-36

Estimating Joint Probabilities ofDesign Coincident Flows at

Stream ConfluencesNational Cooperative Highway Research Program

Roger T. KilgoreDavid B. Thompson

David T. FordKilgore Consulting and Management

Denver, CO

Contractor’s Final Report for NCHRP Project 15-36Submitted March 2013

22

Background

Structures located near the confluence of two streams

Flooding on one stream can affect the high flows on the other

Important to know the relationship between the two drainage area….or probability

23

Return Period Tributary Upper Main Stream Lower Main StreamName Wappasening Up Susquehanna Lo Susquehanna1.25 1900 43600 44000

2 2910 55600 562005 4660 73400 74300

10 6000 85300 8630025 7880 101000 103000

50 9500 115000 116000100 11100 127000 129000

200 12900 140000 142000

500 15400 158000 160000

Stream Stats FlowsStream Flows

Group 1. Smaller Group 2. Smallerwatershed less than watershed greateror equal to 400 mi2 Kendall's τ than 400 mi2 Kendall's τ

Best - Fit POM Eq. 4.3 0.4 Eq. 4.7 0.6Best - Fit POT Eq. 4.4 0.4 Eq. 4.8 0.6Envelope POM Eq. 4.11 0.6 Eq. 4.15 0.8Envelope POT Eq. 4.12 0.6 Eq. 4.16 0.9

Drainage Area Mean Annual (mi2) Precipation (in)

Main Stream 4720 40.3

Tributary 73.2 38.2

Table G.11 Kendall's τ Equation Selection Matrix

Copyright: Bradley Arnold, PE - NYSDOT

24

Kendall's τ = 0.6

Combinations Lo Susquehanna Wappasening Up Susquehanna Lo Susquehanna Wappasening Stage Velocity

Return Period Return Period Discharge Discharge Discharge

(Years) (Years) Upper (cfs) Lower (cfs) (cfs) (ft) (fps)

1 5 50 73400 74300 9500

2 10 48 85300 86300 9396

3 25 42 101000 103000 9064

4 34 34 106987 108577 8561

5 42 25 111306 112583 7880

6 48 10 114124 115191 6000

7 50 5 115000 116000 4660

1 5 100 73400 74300 11100

2 10 99 85300 86300 11075

3 25 95 101000 103000 10973

4 50 83 115000 116000 10645

5 68 68 120177 121597 10179

6 83 50 123656 125369 9500

7 95 25 126071 127990 7880

8 99 10 126817 128801 6000

9 100 5 127000 129000 4660

BIN XXXXXXX

Fifty Year Joint Return Period

One Hundred Year Joint Return Period

25

Return Period Tributary Upper Main Stream Lower Main StreamName Wappasening Up Susquehanna Lo Susquehanna1.25 1900 43600 44000

2 2910 55600 562005 4660 73400 74300

10 6000 85300 8630025 7880 101000 103000

50 9500 115000 116000100 11100 127000 129000

200 12900 140000 142000

500 15400 158000 160000

Stream Stats FlowsStream Flows

5 50 73400 74300 9500

10 48 85300 86300 9396

25 42 101000 103000 9064

34 34 106987 108577 8561

42 25 111306 112583 7880

48 10 114124 115191 6000

50 5 115000 116000 4660

TribUpper Lower

26

Return Period Tributary Upper Main Stream Lower Main Stream7 5268 78954 79901

12 6334 88216 8939215 6769 91921 9332720 7374 96929 9865721 7482 97805 9959125 7880 101000 10300028 8125 103167 10502130 8277 104508 10627131 8351 105152 10687032 8423 103167 10745434 8561 106987 10857739 8884 109771 11116140 8945 110293 11164541 9005 110804 11211942 9064 111306 11258343 9121 111797 11303845 9234 112753 11392346 9289 113218 11435347 9343 113675 11477648 9396 114124 11519149 9448 114566 11559950 9500 115000 116000

Irregular Return Periods With Related Flows 53 9625 115964 11704054 9666 116274 11737659 9860 117758 11898067 10145 119922 12132168 10179 120177 12159773 10343 121404 12292674 10374 121641 12318377 10467 122335 12393583 10645 123656 12536984 10674 123869 12559985 10702 124079 12582786 10730 124287 12605387 10758 124493 12627688 10786 124696 12649793 10921 125687 12757394 10947 125880 12778395 10973 126071 12799098 11050 126633 12860199 11075 126817 128801100 11100 127000 129000132 11789 132055 134058167 12405 136495 138497189 12743 138891 140892239 13352 143331 145333

27

28

29

Coincident Flow Results Q50 Only Results

30

31

32

Lessons Learned• Importance of monitoring stream migration and the

effects it may have on bridges and approaches• Power of flash flooding

• Not always regional flooding that causes damage• Being aware of bridges that collect debris

• Debris Prone Structures (Fall 2017)• Sources of debris• Sources of sedimentation

• Necessity of stream gages• Finding funding for more gages

• Coincident Flow Analysis

33

“A River Ran Through It”F

Flash flooding in Nichols NY, Tioga CountyJuly 24, 2017

By: Jim Esposito, PE

34

Overview• Bridge damage

• Repairs

• Coordination

• Lessons Learned

35

Nichols, NY

Binghamton, NY

36

Flow

Nichols, NY

NYS Route 17 (I-86)

Susquehanna River

Flow

East River Road

Wappasening Creek

Flood Levee

37

NYS Route 17 bridge damage

38

Pre-Failure

39

40

41

Flow

Eastbond

42

43

44

2011 Flooding

45

46

47

48

49

Hard Point

50

Hard Point

51

52

53

54

Flow

Flow

Susquehanna RiverNYS Route 17 (I-86) bridges

Wappasening Creek

55

Repairs

56

57

1234567891011121314151617

2008 17.318.823.82732.934.134.83535.435.836.236.735.828.723.42017.7

2010 19.222.525.430.83740.439.238.738.438.83837.235.829.826.621.219

2012 16.719.222.730.135.938.438.136.235.235.43839.639.232.227.12217.4

2016 1719.723.628.535.235.636.236.136.437.137.838.439.334.127.221.417.2

7/25/2017 17.120.323.929.233.933.533.734.635.235.336.236.537.137.53941.217.9

10

15

20

25

30

35

40

45

Dept

h, F

T

Droplines, Rte 17EB/Wappasening, Upstream

Flow

East Abutment

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

By the Numbers Concrete- 2020 CY

CLSM – Controlled Low Strength

Material (Flowable fill) – 1036 CY

Light Stone

• 1033 tons to open road

• 2133 tons for armoring

• 3166 tons total

Work Hours

• 15 hr days for first 2 weeks

• 12 hr days after

Medium Stone – 1943 tons

Heavy Stone – 160 tons

Extra Heavy Stone

• 2698 tons to open road

• 3115 tons for armoring

• 5813 tons total

Structural Fill – 2423 tons

77

Coordination

• Local Officials• Statewide Emergency Contractor –

• Slate Hill Construction• Suppliers

• Regulatory Agencies• DEC• USACOE

• DOT

78

Lessons Learned

• Localized Storm events• Daily Progress meetings• Involve Permitting Agencies early• Accelerated Schedule

79

Assessment of Learning1. According to the National Highway Institute, what percentage of

US flood fatalities are vehicle-related?a) 76%b) 57%c) 35%d) 23%

2. 1036 yds. of CLSM were used during repair. What does CLSM stand for?a) Controlled Low Strength Materialb) Concrete Loaded Slow Materialc) Controlled Low Slump Materiald) Concentrated Low Slag Material

80

Assessment of Learning

3. What best defines Valley Type VII?a) Canyons, gorges, and confined alluvial valleys with gentle valley-floor slopes, steep valley walls, and meandering entrenched channels

b) Steep, fluvial-dissected, high-drainage density, alluvial landforms

c) Very broad and gentle valley slopes associated with glacio- and nonglacial-lacustrine deposits

d) Moderately steep valley slopes with gentle to moderate side slopes associated with colluvial deposition and/or residual soils.

82

Thank You

Jim Esposito, P.E.Dave Hensberry, EIT

David.Hensberry@dot.ny.gov