DAFTAR HARGA SATUAN UPAH
No. PEKERJA SAT
(1) (2) (3)
1 Mandor Hari
2 Kepala Tukang Kayu Hari
3 Kepala Tukang Batu Hari
4 Kepala Tukang Besi Hari
5 Kepala Tukang Cat Hari
6 Kepala Tukang Style Bali Hari
7 Tukang Kayu Hari
8 Tukang Batu Hari
9 Tukang Besi Hari
10 Tukang Kaca Hari
11 Tukang Cat Hari
12 Tukang Gali Hari
13 Tukang Style Bali Hari
14 Tukang Bongkar Begesting Hari
15 Pekerja Hari
DAFTAR SATUAN BAHAN BANGUNAN
No. JENIS BAHAN BANGUNAN SAT
(1) (2) (3)
1 Pasir Pasang M3
2 Pasir Biasa M3
3 Tanah Urug M3
4 Batu Kali M3
5 Batu Koral M3
6 Kerikil Beton m3
7 Batu Bata Standart bh
8 Batu Bata Mesin Press (amplas halus) bh
9 Semen Tiga Roda 50 kg zak
10 Semen Gresik 50 kg zak
11 Besi Beton 6 mm btg
12 Besi Beton 8 mm btg
13 Besi Beton 10 mm btg
14 Besi Beton 12 mm btg
15 Besi Beton 16 mm btg
16 Besi Beton semua ukuran per kg kg
16 Paku Kayu / Tripleks 1- 4 cm kg
17 Paku Kayu / Tripleks 5 - 12 cm kg
18 Paku Beton Baisa kg
19 Kawat Beton kg
20 Tripleks tebal 3 mm Lbr
21 Tripleks tebal 4 mm Lbr
22 Tripleks tebal 6 mm Lbr
23 Tripleks tebal 9 mm Lbr
24 Tripleks Tebal 12 mm Lbr
25 Tripleks tebal 15 mm Lbr
26 Tripleks tebal 18 mm Lbr
27 Kaca Bening Tebal 3 mm m2
28 Kaca Bening Tebal 5 mm m2
29 Kaca Bening Tebal 8 mm m2
30 Kaca Bening Tebal 10 mm m2
31 Kaca Ryben Tebal 3 mm m2
32 Kaca Ryben tebal 5 mm m2
33 Kaca Ryben tebal 8 mm m2
34 Kaca Ryben tebal 6 mm m2
35 Fiber Semen flat elephant 122 x 244 tebal 4 mm Lbr
36 Fiber Semen flat elephant 122 x 244 tebal 6 mm Lbr
37 Fiber Semen flat elephant 122 x 244 tebal 8 mm Lbr
38 Papan Gypsum Merk Elephant 120 x 240 tebal 9 mm Lbr
39 Papan Gypsum Merk Jayaboard 120 x 240 tebal 9 mm Lbr
40 List Gypsum m
41 Reng 2 x 3 meranti btg
42 Reng 3 x 4 meranti btg
43 Reng 2 x 3 kamper btg
44 Reng 3 x 4 kamper btg
45 Kaso 4 x 6 meranti btg
46 Kaso 5 x 7 meranti btg
47 Kaso 4 x 6 kamper btg
48 Kaso 5 x 7 kamper btg
49 Galar 5 x 10 meranti btg
50 Galar 5 x 10 kamper btg
51 Kayu Sembarang m3
52 Kayu Bekisting per m3 m3
53 Kayu meranti per m 3 m3
54 Kayu Kamper per m3 m3
55 Cat Tembok Interior Dulux 25 kg klg
56 Cat Tembok Interior Catylac 25 kg klg
57 Cat tembok Interior Metrolite 25 kg klg
58 Cat Tembok Eksterior Dulux 25 kg klg
59 Cat Kayu Dulux 1 kg klg
60 Cat kayu Catylac 1kg klg
61 Cat Kayu Glotex 1kg klg
62 Ultran Politur klg
63 Ultran Agua Politur klg
64 Plamur kg
65 Plamur Kayu kg
66 Amplas lbr
67 Kuas bh
67 Water Proof Aqua Proof klg
68 Genteng Keramik Kanmuri Natural bh
69 Genteng Keramik Kanmuri Standart bh
70 Genteng Keramik Kanmuri Exclusive bh
71 Genteng Beton Morando berglazur bh
72 Genteng Beton Morando Natural bh
73 Genteng Ideal bergalzur bh
74 Genteng Ideal natural bh
75 Rabung Genteng Standart bh
76 Asbes Jabesmen 150 x105 lbr
77 Seng gelombang tebal 0.20 m2
78 Seng gelombang tebal 0.30 m2
79 Keramik Lantai 20 x 20 Roman m2
80 Keramik Lantai 30 x 30 Roman m2
81 Keramik Lantai 40 x 40 Roman m2
82 Keramik Dinding 20 x 20 Roman m2
83 Keramika Dinding 20 x 25 Roman m2
84 Batu Alam Artistik m2
85 Paving Block Kelas I Type 4 persegi uk.10x20x8 cm m2
86 Closet Duduk Sanremo Classic bj
87 Closet Duduk Lexington bh
88 Closet Duduk Projecta bh
89 Wastafel Studio 3000 Lava & Pedestal bh
90 Floor Drain (Stainless) bh
91 Kran air standart bh
92 Pipa PVC WAVIN 1/2 inch btg
93 Pipa PVC WAVIN 3/4 inch btg
94 Pipa PVC WAVIN 1 inch btg
95 Pipa PVC WAVIN 2 inch btg
96 Pipa PVC WAVIN 3 inch btg
97 Pipa PVC WAVIN 4 inch btg
98 Elbow PVC 1/2 inch bh
99 Elbow PVC 3/4 inch bh
100 Elbow PVC 1 inch bh
101 Elbow PVC 2 inch bh
102 Elbow PVC 3 inch bh
103 Elbow PVC 4 inch bh
104 Socket PVC 1/2 inch bh
105 SocketPVC 3/4 inch bh
106 Socket PVC 1 inch bh
107 Socket PVC 2 inch bh
108 Socket PVC 3 inch bh
109 Socket PVC 4 inch bh
110 Tee PVC 1/2 inch bh
111 Tee PVC 3/4 inch bh
112 Tee PVC 1 inch bh
113 Tee PVC 2 inch bh
114 Tee PVC 3 inch bh
115 Tee PVC 4 inch bh
116 Pipa GIV 1/2 inc btg
117 Pipa GIV 3/4 inch btg
118 Pipa GIV 1 inch btg
119 Socket GIV 1/2 inch bh
120 Socket GIV 3/4 inch bh
121 Socket GIV 1 inch bh
122 Elbow GIV 1/2 inch bh
123 Elbow GIV 3/4 inch bh
124 Elbow GIV 1 inch bh
125 Tee GIV 1/2 inch bh
126 Tee GIV 3/4 inch bh
127 Tee GIV 1 inch bh
128 Kunci Firo bh
129 Kunci Yale bh
130 Grendel Firo bh
131 Grendel Yale bh
132 Engsel Firo 4'' bh
133 Engsel Yale 4'' bh
134 Engsel Firo 3'' bh
135 Engsel Yale 3'' bh
136 Saklar Tunggal Broco bh
137 Saklar Ganda Broco bh
138 Stop Kontak Broco bh
139 Fiting Lampu Bulat Broco bh
140 Cable Listrik NYA 3 x 2.5 m
141 Cable TIC 3 x 35 + 1 N m
142 Breaker Panel Fujitsu + 4 MCB Merlyn Geryn set
143 Buis Beton 50 x100 bh
144 Buis Beton 30 x100 bh
145 Buis Beton 15 x 75 bh
146 Kansteen Standart lebar 50 cm bh
147 Rumput Halus m2
148 Pohon sejenis kembang kertas bh
149 Pohon sejensi cempaka bh
150 Pohon sejensi Cemara bh
151 Pohon sejenis pangkas kuning bh
152 Kusen Aluminium m
153 Pipa Stainless Diameter 2 inch btg
154 Pekerjaan Railing Besi Stainless m2
HARGA UPAH
(Rp)
(4)
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
55,000.00
55,000.00
55,000.00
55,000.00
55,000.00
37,500.00
37,500.00
37,500.00
37,500.00
HARGA SATUAN
(Rp)
(4)
74,750.00
55,200.00
55,000.00
80,500.00
74,750.00
215,000.00
300.00
575.00
52,325.00
51,750.00
24,000.00
37,500.00
64,600.00
82,500.00
147,900.00
10,000.00
14,375.00
11,500.00
10,350.00
9,200.00
36,800.00
52,900.00
62,100.00
113,735.00
128,800.00
162,150.00
184,000.00
86,250.00
97,750.00
149,500.00
212,750.00
74,750.00
94,875.00
253,000.00
143,750.00
43,125.00
77,625.00
103,500.00
40,825.00
51,750.00
20,700.00
10,350.00
12,650.00
5,175.00
18,400.00
23,000.00
57,500.00
37,375.00
57,500.00
46,000.00
92,000.00
2,300,000.00
2,500,000.00
4,025,000.00
4,600,000.00
670,000.00
285,000.00
241,500.00
959,000.00
54,625.00
32,000.00
27,950.00
31,625.00
25,875.00
11,000.00
12,500.00
1,500.00
5,000.00
38,000.00
8,625.00
28,750.00
5,750.00
11,500.00
14,375.00
34,500.00
97,750.00
15,000.00
28,750.00
31,050.00
40,250.00
34,500.00
35,650.00
37,375.00
44,275.00
34,500.00
32,000.00
900.00
1,367,723.75
3,650,531.25
1,086,750.00
423,775.00
25,000.00
14,500.00
15,525.00
21,505.00
29,434.25
64,779.50
130,122.50
215,676.75
1,725.00
1,725.00
1,725.00
4,600.00
5,750.00
8,050.00
1,725.00
1,725.00
1,725.00
4,600.00
5,750.00
8,050.00
1,725.00
1,725.00
1,725.00
4,600.00
5,750.00
8,050.00
73,600.00
86,250.00
126,500.00
3,450.00
3,450.00
3,450.00
3,450.00
3,450.00
3,450.00
3,450.00
3,450.00
3,450.00
304,750.00
126,500.00
28,750.00
17,250.00
40,250.00
23,000.00
28,750.00
17,250.00
15,000.00
17,500.00
15,000.00
20,000.00
2,875.00
56,500.00
201,250.00
80,000.00
45,000.00
25,000.00
18,000.00
15,000.00
17,250.00
75,000.00
125,000.00
15,000.00
280,000.00
759,000.00
634,800.00
III. TABEL ANALISA HARGA SATUAN
No. URAIAN KOEF
HARGAHARGA UPAH HARGA BAHAN JUM HARGA
SAT SATUAN
(Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8
A PEKERJAAN PERSIAPAN AWAL
1 1M2 Pek. Pembersihan awal lokasi 815.00 - 815.00
Pekerja 0.02 37,500.00 750.00 750.00
Kepala Tukang Kayu 0.001 65,000.00 65.00 65.00
2 M' Pasangan Bouwplank 1,990.00 8,625.00 10,615.00
Kayu Sembarang 0.003 2,300,000.00 6,900.00 6,900.00
Paku Kayu / Tripleks 5 - 12 cm 0.15 11,500.00 1,725.00 1,725.00
Tukang Kayu 0.02 55,000.00 1,100.00 1,100.00
Kepala Tukang Kayu 0.001 65,000.00 65.00 65.00
Pekerja 0.022 37,500.00 825.00 825.00
B PEK. TANAH DAN PASIR
1 1M3 Pek. Galian tanah biasa 28,775.00 28,775.00
Tukang Gali 0.75 37,500.00 28,125.00 28,125.00
Kepala Tukang Kayu 0.01 65,000.00 650.00 650.00
3 1M3 Pek. Urugan tanah kembali 9,570.00 9,570.00
Pekerja 0.25 37,500.00 9,375.00 9,375.00
Kepala Tukang Kayu 0.003 65,000.00 195.00 195.00
4 1M3 Pek. Urugan tanah 11,900.00 66,000.00 77,900.00
Tanah Urug 1.2 55,000.00 66,000.00 66,000.00
Pekerja 0.3 37,500.00 11,250.00 11,250.00
Kepala Tukang Kayu 0.01 65,000.00 650.00 650.00
5 1M3 Pek. Pasir Urug bawah Lantai 11,900.00 60,720.00 72,620.00
Pasir Biasa 1.1 55,200.00 60,720.00 60,720.00
Pekerja 0.3 37,500.00 11,250.00 11,250.00
Kepala Tukang Kayu 0.01 65,000.00 650.00 650.00
6 1M3 Pek. Pemadatan dan perataan 10,025.00 10,025.00
Pekerja 0.25 37,500.00 9,375.00 9,375.00
Kepala Tukang Batu 0.01 65,000.00 650.00 650.00
7 1M3 Pek. Urugan pasir 11,900.00 60,720.00 72,620.00
Pasir Biasa 1.1 55,200.00 60,720.00 60,720.00
Pekerja 0.3 37,500.00 11,250.00 11,250.00
Kepala Tukang Batu 0.01 65,000.00 650.00 650.00
C PEK. PASANGAN DAN PLESTERAN
1 1M3 Pek. Pasangan batu kosong 33,250.00 105,110.00 138,360.00
Batu Kali 1.1 80,500.00 88,550.00 88,550.00
Pasir Biasa 0.3 55,200.00 16,560.00 16,560.00
Pekerja 0.8 37,500.00 30,000.00 30,000.00
Kepala Tukang Batu 0.05 65,000.00 3,250.00 3,250.00
No. URAIAN KOEF
HARGAHARGA UPAH HARGA BAHAN JUM HARGA
SAT SATUAN
(Rp) (Rp) (Rp) (Rp)
2 1M3 Pek. Pasangan Batu kali (1:4) 113,875.00 275,200.75 389,075.75
Batu Kali 1.1 80,500.00 88,550.00 88,550.00
Semen Tiga Roda 50 kg 2.8 52,325.00 146,510.00 146,510.00
Pasir Pasang 0.537 74,750.00 40,140.75 40,140.75
Tukang Batu 1.1 55,000.00 60,500.00 60,500.00
Kepala Tukang Batu 0.1 65,000.00 6,500.00 6,500.00
Pekerja 1.25 37,500.00 46,875.00 46,875.00
5 1M3 Pek. Pas Bata Artistik (1:2) 242,250.00 570,979.37 813,229.37
Batu Bata Mesin Press (amplas halus) 650 575.00 373,750.00 373,750.00
Semen Tiga Roda 50 kg 3.2936 52,325.00 172,337.62 172,337.62
Pasir Pasang 0.333 74,750.00 24,891.75 24,891.75
Tukang Batu 1.5 55,000.00 82,500.00 82,500.00
Kepala Tukang Batu 0.15 65,000.00 9,750.00 9,750.00
Pekerja 4 37,500.00 150,000.00 150,000.00
6 1M3 Pek. Pas Bata merah (1:4) 138,750.00 267,360.49 406,110.49
Batu Bata Standart 500 300.00 150,000.00 150,000.00
Semen Tiga Roda 50 kg 1.6472 52,325.00 86,189.74 86,189.74
Pasir Pasang 0.417 74,750.00 31,170.75 31,170.75
Tukang Batu 1.1 55,000.00 60,500.00 60,500.00
Kepala Tukang Batu 0.05 65,000.00 3,250.00 3,250.00
Pekerja 2 37,500.00 75,000.00 75,000.00
7 1M2 Pek. Plesteran (1:3) 8,066.67 8,273.33 16,340.00
Semen Tiga Roda 50 kg 0.1304 52,325.00 6,823.18 6,823.18
Pasir Pasang 0.0194 74,750.00 1,450.15 1,450.15
Tukang Batu 0.06667 55,000.00 3,666.67 3,666.67
Kepala Tukang Batu 0.01 65,000.00 650.00 650.00
Pekerja 0.1 37,500.00 3,750.00 3,750.00
10 1M2 Pek. Plesteran Artistik 49,175.00 37,001.25 86,176.25
Semen Tiga Roda 50 kg 0.35 52,325.00 18,313.75 18,313.75
Pasir Pasang 0.25 74,750.00 18,687.50 18,687.50
Tukang Batu 0.5 55,000.00 27,500.00 27,500.00
Kepala Tukang Batu 0.045 65,000.00 2,925.00 2,925.00
Pekerja 0.5 37,500.00 18,750.00 18,750.00
12 1M2 Pek. Waterprofing 7,087.50 54,175.00 61,262.50
Water Proof Aqua Proof 1.1 38,000.00 41,800.00 41,800.00
Tukang Cat 0.225 55,000.00 12,375.00 12,375.00
Kepala Tukang Cat 0.0225 65,000.00 1,462.50 1,462.50
Pekerja 0.15 37,500.00 5,625.00 5,625.00
D PEK. BETON
3 1M3 Pek. Beton rabat (1:3:5) 175,250.00 426,059.40 601,309.40
Semen Tiga Roda 50 kg 3.632 52,325.00 190,044.40 190,044.40
Pasir Pasang 0.54 74,750.00 40,365.00 40,365.00
Kerikil Beton 0.91 215,000.00 195,650.00 195,650.00
Pekerja 4 37,500.00 150,000.00 150,000.00
No. URAIAN KOEF
HARGAHARGA UPAH HARGA BAHAN JUM HARGA
SAT SATUAN
(Rp) (Rp) (Rp) (Rp)
Tukang Batu 0.4 55,000.00 22,000.00 22,000.00
Kepala Tukang Batu 0.05 65,000.00 3,250.00 3,250.00
4 1 M3 Pek. Sloof Beton (Ukuran Standart 15/20 ; 15/25 ; 15/30 dan 872,125.00 2,013,505.40 2,885,630.40
M3 Pekerjaan Beton 1 794,540.00
Semen Tiga Roda 50 kg 6.512 52,325.00 340,740.40 340,740.40
Pasir Pasang 0.54 74,750.00 40,365.00 40,365.00
Kerikil Beton 0.75 215,000.00 161,250.00 161,250.00
Pekerja 4 37,500.00 150,000.00 150,000.00
Tukang Batu 0.75 55,000.00 41,250.00 41,250.00
Kepala Tukang Batu 0.05 65,000.00 3,250.00 3,250.00
Kg Pekerjaan besi 1.5 1,226,500.00
Besi Beton semua ukuran per kg 110 10,000.00 1,100,000.00 1,100,000.00
Kawat Beton 2 9,200.00 18,400.00 18,400.00
Tukang Besi 4.25 55,000.00 233,750.00 233,750.00
Kepala Tukang Besi 0.05 65,000.00 3,250.00 3,250.00
Pekerja 4 37,500.00 150,000.00 150,000.00
Pekerjaan Begisting 1 2,141,500.00
Kayu Bekisting per m3 0.125 2,500,000.00 312,500.00 312,500.00
Paku Kayu / Tripleks 5 - 12 cm 3.5 11,500.00 40,250.00 40,250.00
Tukang Kayu 3.5 55,000.00 192,500.00 192,500.00
Kepala Tukang Kayu 0.5 65,000.00 32,500.00 32,500.00
Pekerja 1.5 37,500.00 56,250.00 56,250.00
Tukang Bongkar Begesting 0.25 37,500.00 9,375.00 9,375.00
7 1 M3 Pek. Balok (Ukuran Standart 15/20 ; 15/25 ; 15/30 ; 20/25 ; 2 890,875.00 2,076,005.40 2,966,880.40
M3 Pekerjaan Beton 1 794,540.00
Semen Tiga Roda 50 kg 6.512 52,325.00 340,740.40 340,740.40
Pasir Pasang 0.54 74,750.00 40,365.00 40,365.00
Kerikil Beton 0.75 215,000.00 161,250.00 161,250.00
Pekerja 4.5 37,500.00 168,750.00 168,750.00
Tukang Batu 0.75 55,000.00 41,250.00 41,250.00
Kepala Tukang Batu 0.05 65,000.00 3,250.00 3,250.00
Kg Pekerjaan besi 1.5 1,226,500.00
Besi Beton semua ukuran per kg 110 10,000.00 1,100,000.00 1,100,000.00
Kawat Beton 2 9,200.00 18,400.00 18,400.00
Tukang Besi 4.25 55,000.00 233,750.00 233,750.00
Kepala Tukang Besi 0.05 65,000.00 3,250.00 3,250.00
Pekerja 4 37,500.00 150,000.00 150,000.00
Pekerjaan Begisting 1 2,141,500.00
Kayu Bekisting per m3 0.15 2,500,000.00 375,000.00 375,000.00
Paku Kayu / Tripleks 5 - 12 cm 3.5 11,500.00 40,250.00 40,250.00
Tukang Kayu 3.5 55,000.00 192,500.00 192,500.00
Kepala Tukang Kayu 0.5 65,000.00 32,500.00 32,500.00
Pekerja 1.5 37,500.00 56,250.00 56,250.00
Tukang Bongkar Begesting 0.25 37,500.00 9,375.00 9,375.00
13 1 M3 Pek. Kolom Beton (Ukuran Standart 15/25 ; 15 / 30 ; 20/20 ; 2 875,250.00 2,076,005.40 2,951,255.40
M3 Pekerjaan Beton 1 794,540.00
Semen Tiga Roda 50 kg 6.512 52,325.00 340,740.40 340,740.40
Pasir Pasang 0.54 74,750.00 40,365.00 40,365.00
Kerikil Beton 0.75 215,000.00 161,250.00 161,250.00
Pekerja 4.5 37,500.00 168,750.00 168,750.00
Tukang Batu 0.75 55,000.00 41,250.00 41,250.00
No. URAIAN KOEF
HARGAHARGA UPAH HARGA BAHAN JUM HARGA
SAT SATUAN
(Rp) (Rp) (Rp) (Rp)
Kepala Tukang Batu 0.05 65,000.00 3,250.00 3,250.00
Kg Pekerjaan besi 1.5 1,226,500.00
Besi Beton semua ukuran per kg 110 10,000.00 1,100,000.00 1,100,000.00
Kawat Beton 2 9,200.00 18,400.00 18,400.00
Tukang Besi 4 55,000.00 220,000.00 220,000.00
Kepala Tukang Besi 0.05 65,000.00 3,250.00 3,250.00
Pekerja 4 37,500.00 150,000.00 150,000.00
Pekerjaan Begisting 1 2,141,500.00
Kayu Bekisting per m3 0.15 2,500,000.00 375,000.00 375,000.00
Paku Kayu / Tripleks 5 - 12 cm 3.5 11,500.00 40,250.00 40,250.00
Tukang Kayu 3.5 55,000.00 192,500.00 192,500.00
Kepala Tukang Kayu 0.5 65,000.00 32,500.00 32,500.00
Pekerja 1.5 37,500.00 56,250.00 56,250.00
Tukang Bongkar Begesting 0.2 37,500.00 7,500.00 7,500.00
18 1 M3 Pek. Pelat Lantai 921,500.00 2,326,005.40 3,247,505.40
M3 Pekerjaan Beton 1 794,540.00
Semen Tiga Roda 50 kg 6.512 52,325.00 340,740.40 340,740.40
Pasir Pasang 0.54 74,750.00 40,365.00 40,365.00
Kerikil Beton 0.75 215,000.00 161,250.00 161,250.00
Pekerja 4.5 37,500.00 168,750.00 168,750.00
Tukang Batu 0.75 55,000.00 41,250.00 41,250.00
Kepala Tukang Batu 0.05 65,000.00 3,250.00 3,250.00
Kg Pekerjaan besi 1.5 1,226,500.00
Besi Beton semua ukuran per kg 110 10,000.00 1,100,000.00 1,100,000.00
Kawat Beton 2 9,200.00 18,400.00 18,400.00
Tukang Besi 4.5 55,000.00 247,500.00 247,500.00
Kepala Tukang Besi 0.05 65,000.00 3,250.00 3,250.00
Pekerja 4 37,500.00 150,000.00 150,000.00
Pekerjaan Begisting 1 2,141,500.00
Kayu Bekisting per m3 0.25 2,500,000.00 625,000.00 625,000.00
Paku Kayu / Tripleks 5 - 12 cm 3.5 11,500.00 40,250.00 40,250.00
Tukang Kayu 3.5 55,000.00 192,500.00 192,500.00
Kepala Tukang Kayu 0.5 65,000.00 32,500.00 32,500.00
Pekerja 2 37,500.00 75,000.00 75,000.00
Tukang Bongkar Begesting 0.2 37,500.00 7,500.00 7,500.00
20 1 M3 Pek. Pelat Tangga 837,750.00 2,201,005.40 3,038,755.40
M3 Pekerjaan Beton 1 794,540.00
Semen Tiga Roda 50 kg 6.512 52,325.00 340,740.40 340,740.40
Pasir Pasang 0.54 74,750.00 40,365.00 40,365.00
Kerikil Beton 0.75 215,000.00 161,250.00 161,250.00
Pekerja 4 37,500.00 150,000.00 150,000.00
Tukang Batu 0.75 55,000.00 41,250.00 41,250.00
Kepala Tukang Batu 0.05 65,000.00 3,250.00 3,250.00
Kg Pekerjaan besi 1.5 1,226,500.00
Besi Beton semua ukuran per kg 110 10,000.00 1,100,000.00 1,100,000.00
Kawat Beton 2 9,200.00 18,400.00 18,400.00
Tukang Besi 4 55,000.00 220,000.00 220,000.00
Kepala Tukang Besi 0.05 65,000.00 3,250.00 3,250.00
Pekerja 3 37,500.00 112,500.00 112,500.00
Pekerjaan Begisting 1 2,141,500.00
Kayu Bekisting per m3 0.2 2,500,000.00 500,000.00 500,000.00
Paku Kayu / Tripleks 5 - 12 cm 3.5 11,500.00 40,250.00 40,250.00
Tukang Kayu 3.5 55,000.00 192,500.00 192,500.00
No. URAIAN KOEF
HARGAHARGA UPAH HARGA BAHAN JUM HARGA
SAT SATUAN
(Rp) (Rp) (Rp) (Rp)
Kepala Tukang Kayu 0.5 65,000.00 32,500.00 32,500.00
Pekerja 2 37,500.00 75,000.00 75,000.00
Tukang Bongkar Begesting 0.2 37,500.00 7,500.00 7,500.00
21 1 M3 Pek. Pelat Pondasi Telapak 819,000.00 2,076,005.40 2,895,005.40
M3 Pekerjaan Beton 1 794,540.00
Semen Tiga Roda 50 kg 6.512 52,325.00 340,740.40 340,740.40
Pasir Pasang 0.54 74,750.00 40,365.00 40,365.00
Kerikil Beton 0.75 215,000.00 161,250.00 161,250.00
Pekerja 4 37,500.00 150,000.00 150,000.00
Tukang Batu 0.75 55,000.00 41,250.00 41,250.00
Kepala Tukang Batu 0.05 65,000.00 3,250.00 3,250.00
Kg Pekerjaan besi 1.5 1,226,500.00
Besi Beton semua ukuran per kg 110 10,000.00 1,100,000.00 1,100,000.00
Kawat Beton 2 9,200.00 18,400.00 18,400.00
Tukang Besi 4 55,000.00 220,000.00 220,000.00
Kepala Tukang Besi 0.05 65,000.00 3,250.00 3,250.00
Pekerja 3 37,500.00 112,500.00 112,500.00
Pekerjaan Begisting 1 2,141,500.00
Kayu Bekisting per m3 0.15 2,500,000.00 375,000.00 375,000.00
Paku Kayu / Tripleks 5 - 12 cm 3.5 11,500.00 40,250.00 40,250.00
Tukang Kayu 3.5 55,000.00 192,500.00 192,500.00
Kepala Tukang Kayu 0.5 65,000.00 32,500.00 32,500.00
Pekerja 1.5 37,500.00 56,250.00 56,250.00
Tukang Bongkar Begesting 0.2 37,500.00 7,500.00 7,500.00
23 1 M3 Pek. Cor Beton Bertulang Menengah (Saluran dan Bak Kontrol 674,000.00 1,803,112.50 2,477,112.50
M3 Pekerjaan Beton 1 794,540.00
Semen Tiga Roda 50 kg 6 52,325.00 313,950.00 313,950.00
Pasir Pasang 0.55 74,750.00 41,112.50 41,112.50
Kerikil Beton 0.75 215,000.00 161,250.00 161,250.00
Pekerja 3.5 37,500.00 131,250.00 131,250.00
Tukang Batu 0.5 55,000.00 27,500.00 27,500.00
Kepala Tukang Batu 0.05 65,000.00 3,250.00 3,250.00
Kg Pekerjaan besi 2.5 1,226,500.00
Besi Beton semua ukuran per kg 100 10,000.00 1,000,000.00 1,000,000.00
Kawat Beton 1.5 9,200.00 13,800.00 13,800.00
Tukang Besi 3.5 55,000.00 192,500.00 192,500.00
Kepala Tukang Besi 0.75 65,000.00 48,750.00 48,750.00
Pekerja 3 37,500.00 112,500.00 112,500.00
Pekerjaan Begisting 1 2,141,500.00
Kayu Bekisting per m3 0.1 2,500,000.00 250,000.00 250,000.00
Paku Kayu / Tripleks 5 - 12 cm 2 11,500.00 23,000.00 23,000.00
Tukang Kayu 1.5 55,000.00 82,500.00 82,500.00
Kepala Tukang Kayu 0.25 65,000.00 16,250.00 16,250.00
Pekerja 0.75 37,500.00 28,125.00 28,125.00
Mandor 0.05 65,000.00 3,250.00 3,250.00
Tukang Bongkar Begesting 0.75 37,500.00 28,125.00 28,125.00
24 1 M3 Pek. Listplank Beton dan Kanopi 863,250.00 2,195,255.40 3,058,505.40
M3 Pekerjaan Beton 1 794,540.00
Semen Tiga Roda 50 kg 6.512 52,325.00 340,740.40 340,740.40
Pasir Pasang 0.54 74,750.00 40,365.00 40,365.00
Kerikil Beton 0.75 215,000.00 161,250.00 161,250.00
Pekerja 4 37,500.00 150,000.00 150,000.00
No. URAIAN KOEF
HARGAHARGA UPAH HARGA BAHAN JUM HARGA
SAT SATUAN
(Rp) (Rp) (Rp) (Rp)
Tukang Batu 0.75 55,000.00 41,250.00 41,250.00
Kepala Tukang Batu 0.05 65,000.00 3,250.00 3,250.00
Kg Pekerjaan besi 1.5 1,226,500.00
Besi Beton semua ukuran per kg 110 10,000.00 1,100,000.00 1,100,000.00
Kawat Beton 2 9,200.00 18,400.00 18,400.00
Tukang Besi 3.5 55,000.00 192,500.00 192,500.00
Kepala Tukang Besi 0.05 65,000.00 3,250.00 3,250.00
Pekerja 3 37,500.00 112,500.00 112,500.00
Pekerjaan Begisting 1 2,141,500.00
Kayu Bekisting per m3 0.2 2,500,000.00 500,000.00 500,000.00
Paku Kayu / Tripleks 5 - 12 cm 3 11,500.00 34,500.00 34,500.00
Tukang Kayu 3 55,000.00 165,000.00 165,000.00
Kepala Tukang Kayu 0.5 65,000.00 32,500.00 32,500.00
Pekerja 2 37,500.00 75,000.00 75,000.00
Mandor 0.2 65,000.00 13,000.00 13,000.00
Tukang Bongkar Begesting 2 37,500.00 75,000.00 75,000.00
E PEK. ATAP / KAP
1 1 M2 Pek. Pas. Atap Genteng Pres 14,850.00 198,375.00 213,225.00
Genteng Keramik Kanmuri Natural 23 8,625.00 198,375.00 198,375.00
Tukang Batu 0.15 55,000.00 8,250.00 8,250.00
Kepala Tukang Batu 0.015 65,000.00 975.00 975.00
Pekerja 0.15 37,500.00 5,625.00 5,625.00
3 1 M' Pek. Pas. Bubungan Genteng 27,300.00 80,077.85 107,377.85
Rabung Genteng Standart 4 15,000.00 60,000.00 60,000.00
Semen Tiga Roda 50 kg 0.338 52,325.00 17,685.85 17,685.85
Pasir Pasang 0.032 74,750.00 2,392.00 2,392.00
Tukang Batu 0.2 55,000.00 11,000.00 11,000.00
Kepala Tukang Batu 0.02 65,000.00 1,300.00 1,300.00
Pekerja 0.4 37,500.00 15,000.00 15,000.00
4 1 M2 Pek. Pas. Usuk 5,652.25 43,412.50 49,064.75
Kayu meranti per m 3 0.0105 4,025,000.00 42,262.50 42,262.50
Paku Kayu / Tripleks 5 - 12 cm 0.1 11,500.00 1,150.00 1,150.00
Tukang Kayu 0.0571 55,000.00 3,140.50 3,140.50
Kepala Tukang Kayu 0.0057 65,000.00 370.50 370.50
Pekerja 0.0571 37,500.00 2,141.25 2,141.25
5 1 M2 Pek. Pas. Reng 4,232.00 25,875.00 30,107.00
Kayu meranti per m 3 0.006 4,025,000.00 24,150.00 24,150.00
Paku Kayu / Tripleks 5 - 12 cm 0.15 11,500.00 1,725.00 1,725.00
Tukang Kayu 0.0428 55,000.00 2,354.00 2,354.00
Kepala Tukang Kayu 0.0042 65,000.00 273.00 273.00
Pekerja 0.0428 37,500.00 1,605.00 1,605.00
6 1 M3 Pek. Kuda-Kuda ### 4,427,500.00 6,203,500.00
Kayu meranti per m 3 1.1 4,025,000.00 4,427,500.00 4,427,500.00
Tukang Kayu 24 55,000.00 ### 1,320,000.00
Kepala Tukang Kayu 2.4 65,000.00 156,000.00 156,000.00
Pekerja 8 37,500.00 300,000.00 300,000.00
7 1 M2 Pek. Papan Ram (ListPlank) 40,200.00 101,430.00 141,630.00
Kayu meranti per m 3 0.025 4,025,000.00 100,625.00 100,625.00
No. URAIAN KOEF
HARGAHARGA UPAH HARGA BAHAN JUM HARGA
SAT SATUAN
(Rp) (Rp) (Rp) (Rp)
Paku Kayu / Tripleks 5 - 12 cm 0.07 11,500.00 805.00 805.00
Tukang Kayu 0.5 55,000.00 27,500.00 27,500.00
Kepala Tukang Kayu 0.08 65,000.00 5,200.00 5,200.00
Pekerja 0.2 37,500.00 7,500.00 7,500.00
F
1 1 M3 Pek. Kusen Biasa ### 5,060,000.00 6,077,500.00
Kayu Kamper per m3 1.1 4,600,000.00 5,060,000.00 5,060,000.00
Tukang Kayu 20 55,000.00 ### 1,100,000.00
Kepala Tukang Kayu 2.5 65,000.00 162,500.00 162,500.00
Pekerja 10 37,500.00 375,000.00 375,000.00
2 1 M2 Pek. Daun Pintu/Jendela Kaca 174,000.00 273,412.50 447,412.50
Kayu Kamper per m3 0.04 4,600,000.00 184,000.00 184,000.00
Kaca Bening Tebal 5 mm 0.9 97,750.00 87,975.00 87,975.00
Paku Kayu / Tripleks 1- 4 cm 0.1 14,375.00 1,437.50 1,437.50
Tukang Kayu 2 55,000.00 110,000.00 110,000.00
Kepala Tukang Kayu 0.35 65,000.00 22,750.00 22,750.00
Pekerja 1.1 37,500.00 41,250.00 41,250.00
3 1 M2 Pek. Jendela Kaca Mati 64,625.00 108,962.50 173,587.50
Kaca Bening Tebal 5 mm 1.1 97,750.00 107,525.00 107,525.00
Paku Kayu / Tripleks 1- 4 cm 0.1 14,375.00 1,437.50 1,437.50
Tukang Kayu 0.75 55,000.00 41,250.00 41,250.00
Kepala Tukang Kayu 0.1 65,000.00 6,500.00 6,500.00
Pekerja 0.45 37,500.00 16,875.00 16,875.00
3 1 M1 Pek. Pasang Kusen Aluminium 27,962.50 61,833.33 89,795.83
Fisher 2 3,000.00 6,000.00 6,000.00
Tukang Besi 0.1 55,000.00 5,500.00 5,500.00
Pekerja 0.3 37,500.00 11,250.00 11,250.00
Kusen Aluminium 50 x 100 mm 1.1 46,666.67 51,333.33 51,333.33
Paku Rivet 3 1,500.00 4,500.00 4,500.00
Kaso 4 x 6 kamper 0.3 37,375.00 11,212.50 11,212.50
3 1 M2 Pek. Pasang Kaca tebal 5mm Kusen Aluminium 64,375.00 261,525.00 325,900.00
Kaca Bening Tebal 5 mm 1.1 97,750.00 107,525.00 107,525.00
Tukang Kaca 0.5 55,000.00 27,500.00 27,500.00
Kusen Aluminium 50 x 100 mm 1.1 140,000.00 154,000.00 154,000.00
Tukang Besi 0.5 55,000.00 27,500.00 27,500.00
Pekerja 0.25 37,500.00 9,375.00 9,375.00
4 1 M2 Pek. Daun Pintu/Jendela Panel 198,400.00 241,500.00 439,900.00
Kayu meranti per m 3 0.06 4,025,000.00 241,500.00 241,500.00
Tukang Kayu 2.5 55,000.00 137,500.00 137,500.00
Kepala Tukang Kayu 0.36 65,000.00 23,400.00 23,400.00
Pekerja 1 37,500.00 37,500.00 37,500.00
G PEK. PLAFOND DAN LANTAI
1 1 M2 Pek. Pas. Plafond Gypsum 31,050.00 114,712.50 145,762.50
Papan Gypsum Merk Jayaboard 120 x 2 1 51,750.00 51,750.00 51,750.00
PEK. KUSEN , DAUN PINTU DAN JENDELA
No. URAIAN KOEF
HARGAHARGA UPAH HARGA BAHAN JUM HARGA
SAT SATUAN
(Rp) (Rp) (Rp) (Rp)
Kayu meranti per m 3 0.015 4,025,000.00 60,375.00 60,375.00
Paku Kayu / Tripleks 1- 4 cm 0.02 14,375.00 287.50 287.50
Paku Kayu / Tripleks 5 - 12 cm 0.2 11,500.00 2,300.00 2,300.00
Tukang Kayu 0.2 55,000.00 11,000.00 11,000.00
Kepala Tukang Kayu 0.02 65,000.00 1,300.00 1,300.00
Pekerja 0.5 37,500.00 18,750.00 18,750.00
2 1 M' Pek. List Plafoon Gypsum 4,980.00 21,275.00 26,255.00
List Gypsum 1.0000 20,700.00 20,700.00 20,700.00
Paku Kayu / Tripleks 1- 4 cm 0.0400 14,375.00 575.00 575.00
Pekerja 0.1 37,500.00 3,750.00 3,750.00
Tukang Kayu 0.02 55,000.00 1,100.00 1,100.00
Kepala Tukang Kayu 0.002 65,000.00 130.00 130.00
3 1 M2 Pek. Pas. Kramik 40/40 22,900.00 51,951.25 74,851.25
Keramik Lantai 40 x 40 Roman 1 37,375.00 37,375.00 37,375.00
Semen Tiga Roda 50 kg 0.25 52,325.00 13,081.25 13,081.25
Pasir Pasang 0.02 74,750.00 1,495.00 1,495.00
Tukang Batu 0.2 55,000.00 11,000.00 11,000.00
Kepala Tukang Batu 0.01 65,000.00 650.00 650.00
Pekerja 0.3 37,500.00 11,250.00 11,250.00
3 1 M2 Pek. Pas. Kramik 30/30 22,900.00 50,226.25 73,126.25
Keramik Lantai 30 x 30 Roman 1 35,650.00 35,650.00 35,650.00
Semen Tiga Roda 50 kg 0.25 52,325.00 13,081.25 13,081.25
Pasir Pasang 0.02 74,750.00 1,495.00 1,495.00
Tukang Batu 0.2 55,000.00 11,000.00 11,000.00
Kepala Tukang Batu 0.01 65,000.00 650.00 650.00
Pekerja 0.3 37,500.00 11,250.00 11,250.00
5 1 M2 Pek. Pas. Kramik 20/20 22,900.00 49,076.25 71,976.25
Keramik Dinding 20 x 20 Roman 1 34,500.00 34,500.00 34,500.00
Semen Tiga Roda 50 kg 0.25 52,325.00 13,081.25 13,081.25
Pasir Pasang 0.02 74,750.00 1,495.00 1,495.00
Tukang Batu 0.2 55,000.00 11,000.00 11,000.00
Kepala Tukang Batu 0.01 65,000.00 650.00 650.00
Pekerja 0.3 37,500.00 11,250.00 11,250.00
5 1 M2 Pek. Pas. Kramik dinding 20/25 21,900.00 49,076.25 70,976.25
Keramika Dinding 20 x 25 Roman 1 34,500.00 34,500.00 34,500.00
Semen Tiga Roda 50 kg 0.25 52,325.00 13,081.25 13,081.25
Pasir Pasang 0.02 74,750.00 1,495.00 1,495.00
Tukang Batu 0.25 55,000.00 13,750.00 13,750.00
Kepala Tukang Batu 0.01 65,000.00 650.00 650.00
Pekerja 0.2 37,500.00 7,500.00 7,500.00
6 1 M2 Pek. Pas. Batu Alam Penutup Dinding Artistik 21,025.00 46,576.25 67,601.25
Batu Alam Dinding Artistik 1 32,000.00 32,000.00 32,000.00
Semen Tiga Roda 50 kg 0.25 52,325.00 13,081.25 13,081.25
Pasir Pasang 0.02 74,750.00 1,495.00 1,495.00
Tukang Batu 0.2 55,000.00 11,000.00 11,000.00
Kepala Tukang Batu 0.01 65,000.00 650.00 650.00
Pekerja 0.25 37,500.00 9,375.00 9,375.00
No. URAIAN KOEF
HARGAHARGA UPAH HARGA BAHAN JUM HARGA
SAT SATUAN
(Rp) (Rp) (Rp) (Rp)
8 1 M2 Pek. Pas. Paving Block 14,850.00 45,000.00 59,850.00
Paving Block Kelas I Type 4 persegi uk.1 50 900.00 45,000.00 45,000.00
Tukang Batu 0.15 55,000.00 8,250.00 8,250.00
Kepala Tukang Batu 0.015 65,000.00 975.00 975.00
Pekerja 0.15 37,500.00 5,625.00 5,625.00
H PEK. PENGECATAN DAN POLITURAN
1 1 M2 6,212.50 251,650.00 257,862.50
Cat Tembok Interior Dulux 25 kg 0.37 670,000.00 247,900.00 247,900.00
Plamur 0.25 11,000.00 2,750.00 2,750.00
Amplas 0.50 1,500.00 750.00 750.00
Kuas 0.05 5,000.00 250.00 250.00
Tukang Cat 0.05 55,000.00 2,750.00 2,750.00
Kepala Tukang Cat 0.01 65,000.00 650.00 650.00
Pekerja 0.075 37,500.00 2,812.50 2,812.50
2% 98%
1 1 M2 6,212.50 248,900.00 255,112.50
Cat Tembok Eksterior Dulux 25 kg 0.37 670,000.00 247,900.00 247,900.00
Amplas 0.50 1,500.00 750.00 750.00
Kuas 0.05 5,000.00 250.00 250.00
Tukang Cat 0.05 55,000.00 2,750.00 2,750.00
Kepala Tukang Cat 0.01 65,000.00 650.00 650.00
Pekerja 0.075 37,500.00 2,812.50 2,812.50
2 1 M2 9,900.00 23,929.25 33,829.25
Cat Kayu Dulux 1 kg 0.284 54,625.00 15,513.50 15,513.50
Plamur Kayu 0.25 12,500.00 3,125.00 3,125.00
Amplas 0.5 1,500.00 750.00 750.00
Ultran Politur 0.142 31,625.00 4,490.75 4,490.75
Kuas 0.01 5,000.00 50.00 50.00
Tukang Cat 0.1 55,000.00 5,500.00 5,500.00
Kepala Tukang Cat 0.01 65,000.00 650.00 650.00
Pekerja 0.1 37,500.00 3,750.00 3,750.00
J PEK. BORONGAN
1 ls Pemasangan Rambu Pengaman 1 22,000.00 75,000.00 97,000.00
2 m Pas. Buis Beton 50 x 100 1 15,000.00 80,000.00 95,000.00
3 m Pas. Buis Beton 30 x 100 1 12,000.00 45,000.00 57,000.00
4 m Pas. Buis Beton 10 x 75 cm 1 10,000.00 25,000.00 35,000.00
5 m Pas. Kansteen Jalan 1 7,500.00 18,000.00 25,500.00
6 titik Pas. Instalasi Titik Lampu 1 20,000.00 20,000.00 40,000.00
7 titik Pas. Instalasi Stop Kontak 1 20,000.00 15,000.00 35,000.00
8 titik Pas. Saklar Ganda 1 20,000.00 17,500.00 37,500.00
9 titik Pas. Saklar Tunggal 1 20,000.00 15,000.00 35,000.00
10 titik Pas. MCB Box Breaker 1 75,000.00 250,000.00 325,000.00
11 m Pas. Jaringan Kabel 1 1,500.00 4,000.00 5,500.00
12 m Pas, Jaringan Kabel Tegangan Rendah 1 15,000.00 56,500.00 71,500.00
13 m Pas. Pipa PVC 2" 1 3,000.00 10,796.58 13,796.58
14 bh Pas. Tee Pipa PVC 2" 1 2,000.00 4,600.00 6,600.00
15 bh Pas. Elbow Pipa PVC 2" 1 2,000.00 4,600.00 6,600.00
Pek. Mengecat Tembok (interior) , 1x Plamir-2x Mengecat
Pek. Mengecat Tembok (exterior) , 1x Plamir-2x Mengecat
Pek. Mengecat Kayu, 1x Cat Dasar,1x Plamur, 2x Cat Halus
No. URAIAN KOEF
HARGAHARGA UPAH HARGA BAHAN JUM HARGA
SAT SATUAN
(Rp) (Rp) (Rp) (Rp)
16 m Pas. Pipa PVC 3" 1 3,500.00 21,687.08 25,187.08
17 bh Pas. Tee Pipa PVC 3" 1 2,000.00 5,750.00 7,750.00
18 bh Pas. Elbow Pipa PVC 3" 1 2,000.00 5,750.00 7,750.00
19 bh Pas. Reducer Pipa PVC 2 - 3" 1 2,000.00 10,000.00 12,000.00
20 bh Pas. Kloset Warna Duduk KIA 1 80,000.00 1,086,750.00 1,166,750.00
21 bh Pas. Shower Standart KIA 1 50,000.00 423,775.00 473,775.00
22 bh Pas. Floor Drain 1 12,000.00 25,000.00 37,000.00
23 bh Pas. Keran Air 1 5,000.00 14,500.00 19,500.00
24 m Pas. Pipa Air Bersih 3/4" 1 3,000.00 14,375.00 17,375.00
25 bh Pas. Elbow Pipa Air Bersih 3/4" 1 2,000.00 5,000.00 7,000.00
26 bh Pas. Sokcket Pipa Air Bersih 3/4" 1 2,000.00 5,000.00 7,000.00
27 bh Pas. Tee Y Pipa Air Bersih 3/4" 1 2,000.00 7,000.00 9,000.00
28 set Pas. Wastafel Cuci Stainless 1 45,000.00 225,000.00 270,000.00
29 bh Pas Wastafel Putih KIA ukuran 50 x 3 1 80,000.00 450,000.00 530,000.00
30 m3 Pembentuhan lahan landscaping 1 7,500.00 - 7,500.00
31 ls Pemangkasan dan perapihan pohon 1 50,000.00 - 50,000.00
32 m2 Penanaman Rumput 1 4,000.00 11,500.00 15,500.00
33 m2 Penanaman Kembang Kertas 1 3,000.00 17,250.00 20,250.00
34 m2 Penanaman Pohon type Palem 1 20,000.00 75,000.00 95,000.00
35 m Penanaman Cemara 1 20,000.00 100,000.00 120,000.00
36 m Penanaman Pangkas Kuning 1 1,500.00 8,000.00 9,500.00
37 titik Pek. Penyambungan Listrik 1 250,000.00 250,000.00
38 m Pek. Penyambungan Air 1 150,000.00 150,000.00
39 m2 Pekerjaan pemasangan railing besi 1 42,500.00 634,800.00 677,300.00
40 m Pekerjaan Pipa stainless 1 12,000.00 86,250.00 98,250.00