Phase I:• Currentlyinconstruction• Includesgrading,fencing,drainage(including

basins)anddemolitionofexistingstructuresonthesite

• CompletedbyPennDOT

Phase II:• Constructionanticipatedtobeginsummer2017• Includestrackwork,electrificationtraction,

platformsandpedestrianaccesstowersforingress/egresstothenewstation

• CompletedbyAMTRAK,NorfolkSouthernorotherdesignatedcontractors

New Middletown Station

About the keystone corridor

Amtrak station improvement Projectkeystone corridor - Middletown station

TheKeystoneCorridorisa105-milerailroadlinebetweenHarrisburgandPhiladelphia,Pa.AMTRAKruns11eastboundand12westboundtrainsthatstopatMiddletownStation.ThesetrainsprovideservicebetweenHarrisburgandPhiladelphiawithconnectionsonwardtoNewYorkCity.MiddletownStationridershipwas68,484in2015. Parkesburg

Keystone Corridor Middletown Station

Harrisburg

PhiladelphiaElizabethtown

Mount JoyLancaster

Coatesville

Downingtown

ExtonPaoli

Ardmore

Rendering of New Middletown Station Pedestrian Bridge

Site Specifications• Location:IntersectionofAnnStreetand

StateRoute(SR)230(WestMainStreet)• Development Space Available:8.38acres• Zoning:C-1Commercial• Utilities:

8”waterlinewithinEmausStreetcartwayfromSR230toWoodStreetwitha375’-long8”waterlineservicetosite

2”electricalconduitinparkinglotsandroadwayforlighting

P3 Developement Opportunity:ThepotentialforanewcommercialdevelopmentthatcomplementstheparkingfacilityandnewlyrelocatedAMTRAKMiddletownStation.

For More Information:Public-PrivateTransportationPartnershipsOfficeEmail:P3MdtTrainStation@pa.gov

RFP Selection Standards• Lowestsubsidizationby

PennDOTandfundingpartners• Mostusefulandmeaningful

developmentofland• OperationsandMaintenance

Plan• Maximizerevenuefrom

parkingandcommercializationactivities

P3 Project Schedule: December16,2016-RFQResponseDueDate

New Middletown Station Construction Phases

Rendering of Pedestrian Bridge and Potential Commercial Development

The P3 Project• DBFOMparkingfacilitiesthatprovidea

minimumof400parkingspaces• Fixed-priceparkingfeestructure• Potentialcommercial/retaildevelopment

(commercializationactivities)

• FinalizetheEmausStreetextensionandconstructapedestrianbridgeoverSR230

• OperationsandMaintenanceTerm:30years(min)• LandLease:Approximately50years