Overview Aldis GridSmart installation process in Sandy Springs, GA.

Citation preview

Slide No.

1January 16, 2010

Aldis GridSmartInstallation Overview

Pitts Rd & Roswell Rd (Hwy 9)Sandy Springs, GA

Slide No.

2January 16, 2010

Aldis GridSmartAldis GridSmart

Aerial view of the intersection of Pitts Rd & Roswell Rd (Hwy 9)

Camera and Control BoxLocation

Slide No.

3January 16, 2010

Aldis GridSmartAldis GridSmart

This is an aerial view of the intersection in Sandy Springs, GA

Items Required for Mounting

1 – Lumenera Arm 1 – Astro Bracket 1 – 100’ Cat5e Cable

Slide No.

4January 16, 2010

Aldis GridSmartAldis GridSmart

In most intersection installations only one lane needs to be closed to allow for the bucket truck and crew to hang the mounting arm and camera

Slide No.

5January 16, 2010

Aldis GridSmartAldis GridSmart

The average time to mount the arm, run the Cat5e cable and mount the always in focus fixed camera is 2-2.5 hours

Slide No.

6January 16, 2010

Aldis GridSmartAldis GridSmart

This is the view of the intersection as seen through the alwaysin focus fixed camera at the intersection in Sandy Springs, GA

Slide No.

7January 16, 2010

• The control unit (CPU) is placed in the control cabinet and the single cable from the camera to the CPU, a Cat5 cable, is connected to the Camera port on the front of the CPU.

• The cable for either a TS1 or TS2 is connected to the controller.

• Note: The CPU location in this picture was a temporary mounting location during the early stage of this installation, it was later moved.

Aldis GridSmartAldis GridSmart

CPU

Slide No.

8January 16, 2010

• The TS1 cable connected to the GridSmart CPU is connected to the connector package located in the 2070 cabinet.

Aldis GridSmartAldis GridSmart

TS1 Cable from CPU

2070 Connector Package

Slide No.

9January 16, 2010

• Next the GridSmart software is configured with the necessary Zone and Phase information, which is a 20-30 minute process.

• Once this is completed it is just a simple matter of placing the Aldis system in control with a simple execution step within the software.

Aldis GridSmartAldis GridSmart

Slide No.

10January 16, 2010

Aldis GridSmartAldis GridSmart

In Summary:• System set-up configurations are all completed by making adjustments

through the GridSmart software, the always in focus camera requires no adjustment what-so-ever once the camera has been hung.

• The single camera and single cable connection design require less time in the intersection and less impact to traffic due to limited lane closures compared to other video detection systems.

• A complete Aldis GridSmart system can be installed and placed in control of an intersection in 3-4 hours from start to finish.

Slide No.

11January 16, 2010

City of Sandy Springs Point of Contact Information

Chris WatersSandy Springs Traffic Services SuperintendentPhone: 770-730-5600 Chris.Waters@sandyspringsga.org