Construction of New Building for 11KV Switchgear Room and Replacement of 11KV Switchgear at Salalah A & B PSSDaily Progress ReportDate 01/09/2013 Day
Location CONTROL BUILDING/CABLE ROUTE Salalah A & B PSS Weather Conditions Cloudy
Sl.No. Description of work carried out on Date -01/09/2013 Units Qty Planned for Date ----02/09/2013
1 11 KV Switchgear Testing work 11 KV Switchgear Testing work
2 Control cable termination work Control cable termination work
3 Cage ladder rectification work
4 Installation of differential relay at 33KV C & R Panel
5
6
7
8
9
Sl. No.Staff Units Available Workmen Units Available
1 Managers (SFO) Nos. 1 Charge hand Nos.2 Civil Engineers (SFO) Nos. 1 Foreman Nos.3 Planning Engineer Nos. 1 Mason Nos.4 Electrical Engineer (SFO) Nos. 1 Steel fitter Nos.5 QHSE Engineer (SFO) Nos. 1 Carpenter Nos.6 HSE Steward (SFO) Nos. 1 water proofing/Fabricator/Welder Nos.7 Subcontractors Nos. 1 Electrician & Elect. Fitter (SFO) Nos. 98 Testing Engineer Nos. 1 Helper Nos. 1
AC Technicians Nos.Painter/Plumber Nos.Machinery Operator/Mechanic Nos.Timekeeper/ Operator/Tile mason Nos.Team For Cable laying and associated works Nos.
Total 8 Total 10
Night ShiftWatchman Nos.
Total
Concern/Constraints
1
2
Prepared By: Checked By : Approved BY :
Civil Engineer QHSE Project Manager
Workdone by
Recommended