Construction of New Building for 11KV Switchgear Room and Replacement of 11KV Switchgear at Salalah A & B PSS Daily Progress Report Date 01/09/2013 Day Location CONTROL BUILDING/CABLE ROUTE Salalah A & B PSS Weather Conditions Cloudy Sl.No. Description of work carried out on Date -01/09/2013 Units Qty Planned for Date ----02/09/2013 1 11 KV Switchgear Testing work 11 KV Switchgear Testing work 2 Control cable termination work Control cable termination work 3 Cage ladder rectification work 4 Installation of differential relay at 33KV C & R Panel 5 6 7 8 9 Sl. No. Staff Units Available Workmen Units Available 1 Managers (SFO) Nos. 1 Charge hand Nos. 2 Civil Engineers (SFO) Nos. 1 Foreman Nos. 3 Planning Engineer Nos. 1 Mason Nos. 4 Electrical Engineer (SFO) Nos. 1 Steel fitter Nos. 5 QHSE Engineer (SFO) Nos. 1 Carpenter Nos. 6 HSE Steward (SFO) Nos. 1 water proofing/Fabricator/Welder Nos. 7 Subcontractors Nos. 1 Electrician & Elect. Fitter (SFO) Nos. 9 8 Testing Engineer Nos. 1 Helper Nos. 1 AC Technicians Nos. Painter/Plumber Nos. Machinery Operator/Mechanic Nos. Timekeeper/ Operator/Tile mason Nos. Team For Cable laying and associated works Nos. Total 8 Total 10 Night Shift Watchman Nos. Total Concern/Constraints 1 2 Prepared By: Checked By : Approved BY : Civil Engineer QHSE Project Manager Workdone by

26.12.13- Salalah A & B

Embed Size (px)

DESCRIPTION

sadsdg g

Citation preview

Page 1: 26.12.13- Salalah  A & B

Construction of New Building for 11KV Switchgear Room and Replacement of 11KV Switchgear at Salalah A & B PSSDaily Progress ReportDate 01/09/2013 Day

Location CONTROL BUILDING/CABLE ROUTE Salalah A & B PSS Weather Conditions Cloudy

Sl.No. Description of work carried out on Date -01/09/2013 Units Qty Planned for Date ----02/09/2013

1 11 KV Switchgear Testing work 11 KV Switchgear Testing work

2 Control cable termination work Control cable termination work

3 Cage ladder rectification work

4 Installation of differential relay at 33KV C & R Panel

5

6

7

8

9

Sl. No.Staff Units Available Workmen Units Available

1 Managers (SFO) Nos. 1 Charge hand Nos.2 Civil Engineers (SFO) Nos. 1 Foreman Nos.3 Planning Engineer Nos. 1 Mason Nos.4 Electrical Engineer (SFO) Nos. 1 Steel fitter Nos.5 QHSE Engineer (SFO) Nos. 1 Carpenter Nos.6 HSE Steward (SFO) Nos. 1 water proofing/Fabricator/Welder Nos.7 Subcontractors Nos. 1 Electrician & Elect. Fitter (SFO) Nos. 98 Testing Engineer Nos. 1 Helper Nos. 1

AC Technicians Nos.Painter/Plumber Nos.Machinery Operator/Mechanic Nos.Timekeeper/ Operator/Tile mason Nos.Team For Cable laying and associated works Nos.

Total 8 Total 10

Night ShiftWatchman Nos.

Total

Concern/Constraints

1

2

Prepared By: Checked By : Approved BY :

Civil Engineer QHSE Project Manager

Workdone by