2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 1of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

ClackamasCounty ClackamasCounty 10001 JohnsonCreekBlvd.InterchangeImprovements

JCB/I-205interchange N/A Addlooprampandnorthboundon-ramp;realignsouthboundoff-rampandinstalldualright-turnlanes.

10,417,400$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

ClackamasCounty ClackamasCounty 10003 HarmonyRoadImprovements LinwoodAve FullerRd AddBikelanesandSidewalkswhereneeded,includingsafetytreatmentsatintersectionsandADAaccessibilityimprovementsasnecessary.

5,315,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 10023 82ndDr.Improvements Hwy212 StrawberryLaneIntersection

Widentoaconsistent4lanecrosssectionandincludebike/pedimprovementandADAaccessibilityimprovementsasnecessary.NotincludingintersectionimprovementsatStrawberryLane.

18,521,712$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

ClackamasCounty ClackamasCounty 10043 BorlandRdfromTualatintoStaffordRd TualatinCityLimits StaffordRd Addpavedshouldersandturnlanesatmajorintersections. 6,037,840$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 10057 RedlandRoad AbernethyRoad UGB ImproveRedlandRoadtourbanstandards,addingleftturnlanesatmajorintersections,upgradingtwobridgesandcompletingsidewalkgapsonwest/southsidebetweenAbernethyandAnchorWay,northsidebetweenAnchorandLivesay,andbothsidesfromLivesaytotheUGB(OregonCityTSPProjectsD91,W7,W17,W18).

13,091,908$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

ClackamasCounty ClackamasCounty 11491 FlavelDr AlbertaAve Countyboundary AddbikewaystoprovideconnectionbetweenSpringwater/PowerlinetrailandbikefacilitiesonFlavelDrand52ndAveinPortland.

2,561,830$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 11517 JenningsAve OatfieldRoad WebsterRoad Widento2-laneurbanminorarterialstandardwithbikewayandpedestrianfacilitiesinfill

14,180,420$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 11518 WebsterRd OR224 Gladstone Fillgapsinbikewaysandpedestrianfacilities,improveaccesstoschool,providebike/pedsafetytreatmentsatkeyintersectionsandimproveADAaccessibility.

20,207,630$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 11522 97thAve/MatherRd LawnfieldRd SummersLane Addbikeways,pedwaysalongprojectlength,addeastboundleftturnlanesatMatherRd/SummersLn,provideADAaccessibilityimprovementsasnecessary.

4,847,280$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 11618 BorlandRdfromStaffordRdtoWestLinnCityLimits

StaffordRd WestLinnCityLimits Addpavedshoulders.TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.

10,661,890$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 11668 SunriseMulti-usepathPhaseII 122ndAve RockCreekJunction Constructnewmulltiusepathfrom122ndAveto172ndparallelingtheSunriseproject.

6,378,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 11670 OR212wideningto5laneboulevard 172nd EastofDamascustowncenter(intersectionwith222ndAve)

WidenHighway212toa5laneboulevardsectionfrom172ndthroughDamascustowncenterincludingintersectionimprovementsatFosterRd,safetyimprovementsatmajorcrossingpointsforbicyclistsandpedestrians,andADAaccessibilityimprovementsasnecessary.

24,500,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

ClackamasCounty ClackamasCounty 11766 JohnsonCreek/LinwoodAveITSImprovements

JohnsonCreekBlvd/LinewoodAveIntersection

NA AddintelligenttransportationsystemimprovementsattheintersectionofJohnsonCreekBlvdandLinwoodAvetoprovidewarningsandspecialphasingforbicyclistsandpedestrians.IncludeADAaccessibilityimprovementsasnecessary.

1,000,000$ 2028-2040 No TSMO/TDM/TOD Reducefatalandsevereinjurycrashes

ClackamasCounty ClackamasCounty 11768 StrawberryLane/I-205OverpassWidening(TSAP)

CasonDrive 82ndDrive ReplaceexistingStrawberryLaneoverpassoverI-205toprovidesufficientwidthtoincludebicycleandpedestrianfacilitieswithappropriateADAaccessibilityimprovements.

6,000,000$ 2028-2040 No RoadsandBridges

Reducefatalandsevereinjurycrashes

ClackamasCounty ClackamasCounty 11769 RuskRdBike/PedImprovements(TSAP) AldercrestRoad OR224 ProvidebicycleandpedestrianimprovementsonRuskRoadbetweenAldercrestRdandOR224toimprovesafety,fillanimportantsystemgapandprovideADAaccessibilityimprovementsasneeded.

1,000,000$ 2028-2040 No ActiveTransportation

Reducefatalandsevereinjurycrashes

ClackamasCounty ClackamasCounty 11772 ClackamasIndustrialAreaBike/PedImprovements(TSAP)

Intersectionof106thAveandOR212

IntersectionofJenniferRdand122ndAve

Improveintersectionof106thandOR212,andJenniferDriveand122ndAvetofacilitatebikeandpedestriansafetyandprovideADAaccessibilityimprovementsasneeded.Alsoimproveintersectiongeometrytofacilitatetruckaccesstoindustrialpark.

2,000,000$ 2028-2040 No ActiveTransportation

Increaseaccesstoopport.forhist.marg.comm.

ClackamasCounty ClackamasCounty 11774 JohnsonCreekBlvdandBellAveIntersectionSafetyImprovements(TSAP)

JohnsonCreekBlvd/BellAveintersection

NA ImprovedesignoftheintersectionofJohnsonCreekBlvdandBellAvetoimproveintersectionsafetyforbicyclistandpedestriansandimproveADAaccessibility.Nochangeinintersectioncapacity.

1,500,000$ 2028-2040 No ActiveTransportation

Reducefatalandsevereinjurycrashes

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 2of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

ClackamasCounty ClackamasCounty 11937 McLoughlinBlvdHCTproject TriMetOrangeLinestationatParkAve.

DowntownOregonCityinthevicinityoftheexistingtransitcenter.

ExtendshighcapacitytransitfromthecurrentOrangeLineendatParkAvenuetodowntownOregonCity.

23,300,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 11938 172ndAvenueFrequentTransit Intersectionof172ndAveandOR212

Intersectionof190thAveandFosterRd.

Newbustransitprovidingfrequentserviceon172nd/190thbetweenOR212andFosterRdinMultnomahCo.

23,300,000$ 2028-2040 No Transit Relievefuturecongestion

ClackamasCounty Gladstone 11887 TrolleyTrailBridgePhase2 PortlandAve,Gladstone ClackamasRiverTrail,OregonCity

SecondphaseofconstructionoftheTrolleyTrailBridgeacrosstheClackamasRiverfromGladstonetoOregonCity.

4,538,623$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty HappyValley 10035 UpperFosterRd.Improvements CountyLine 172nd190thConnector Widentwo-laneminorarterialfromthecountylinetothe172nd/190thconnector,toincludecontinuousleftturnlane,sidewalksandbikelanes.ProjectSegmentLength4,500feet.

6,271,700$ 2028-2040 No RoadsandBridges

Increaseaccesstojobs

ClackamasCounty HappyValley 10036 145thAve. ClatsopSt. MonnerRd. Widen145thAvetoincludecontinuousleftturnlane,sidewalkandbikelaneinfill.Trafficsignalorroundaboutwillbeaddedtomitigatemodalconflict.Projectprovidessaferoutebetweenresidentialandrecreationallanduses.

8,300,000$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

ClackamasCounty HappyValley 10045 ClatsopSt. 132ndAve. 162ndAve. Widenroadto3lanes,withcontinuousleftturnlane,sidewalks,bikelanes,andtrafficsignalstomitigatemultimodalconflicts.Projectimprovesaccesstoindustrialandemploymentcenter;completessegmentofMt.Scott/ScouterMt.Loop.

8,291,400$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

ClackamasCounty HappyValley 10060 SE132ndAve. ClatsopRd. KingRd. Widenexistingfacilitytothreelanes,accommodatingcontinuousleftturnlane,sidewalksandbikelanes.

4,900,000$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

ClackamasCounty HappyValley 10061 142ndAve. SunnysideRd. TerritoryDr. Widen142ndAvetoincludecontinuousleftturnlane,sidewalksandbikelanestomitigatemodal/sight-distanceconflictsonminorarterial;createssafeconnectionfromcommercial,multifamilyandsubdivisiondevelopmentstoindustrialsector.

11,027,569$ 2028-2040 No RoadsandBridges

Increaseaccesstojobs

ClackamasCounty HappyValley 10082 Mt.ScottBlvd./KingRd.Improvements HappyValleyCityLimits 145thAve. WidenMt.ScottBlvd.andKingRd.facilitiestothreelanes,withcontinuousleftturnlane,sidewalksandbikelanes.Trafficsignalsorroundaboutswillbeinstalledtomitigatemultimodalconflicts.

22,131,660$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

ClackamasCounty HappyValley 10538 Sager 162nd Foster Usingexistingalignment,widenandextendruralroadwaytothreelanes,includingcontinuousleftturnlane,bikelanesandsidewalkstoprovidedirectconnecttoemploymentlands.Projectwillsignalizecorridorat172ndAve.

16,795,400$ 2028-2040 No RoadsandBridges

Servenewurbanarea

ClackamasCounty HappyValley 11271 MistyDrive 162ndAve. 177thAve. Constructnew3laneroadwithcontinuousleftturnlane,sidewalks,bikelanes,trafficsignalsandbridgeoverRockCreek.Projectlocationimprovesaccesstogovernmentservices,urbanandemploymentcenters.

29,604,550$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

ClackamasCounty HappyValley 11508 HubbardRd 122ndAve 132ndAve FillgapsinpedestrianfacilitiesandimproveADAfacilitiesasneeded. 1,753,950$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty HappyValley 11511 StevensRd/StevensWay IdlemanRd CauseyAve Constructsidewalkinfilltocompletesystemgap;constructoptionaltrafficcalmingtominimizemodalconflict.

4,466,050$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty HappyValley 11529 ArmstrongExtension 162ndAve 172ndAve Constructnew,3laneroadwayextensionbetween172ndand190thAve,incorporatingbikelanes,sidewalks,andcontinuousleftturnlane.Projectbisectsindustrialcampusandemploymentcenter.

15,200,900$ 2028-2040 No RoadsandBridges

Increaseaccesstojobs

ClackamasCounty HappyValley 11530 TrogeExtensionWest 162ndAve. 172ndAve Constructnew3laneroadwithcontinuousleftturnlane,sidewalks,bikelanes,trafficsignalsandabridgeoverRockCreek.

24,661,600$ 2028-2040 No RoadsandBridges

Increaseaccesstojobs

ClackamasCounty HappyValley 11669 MiddleFosterRd.Improvements 172nd190thConnector SunnysideRoadExtension

Widentwo-laneminorarterialfromthe172nd/190thconnectortoSunnysideRoadeast,toincludecontinuousleftturnlane,sidewalksandbikelanes.Projectsegmentis8,000feetinlength.

11,055,200$ 2028-2040 No RoadsandBridges

Servenewurbanarea

ClackamasCounty HappyValley 11901 177thAve.ROWAcquisitionandPlanning SagerRd.ExtensionEast RockCreekBlvd. Conductplanningandpreliminaryright-of-wayacquisitionforanew3laneroadway(withsidewalks,bikelanesandcontinuousleftturnlane)fromSagerRd.extensioneasttoRockCreekBlvd.

3,243,300$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 3of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

ClackamasCounty HappyValley 12042 WestMountScott/ScouterMountainTrailLoop

SpringwaterCorridor Hwy.212 BuildlooptrailfromClatsopstreettoHighway212/ClackamasRiver.ConnectsSpringwaterCorridor,Mt.Talbert,ScoutersMountainNaturePark,andtheClackamasRiver.PartnersincludetheCityofPortlandandCityofHappyValley.

7,085,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty LakeOswego 11087 BryantRdbikelanes/pathway BoonesFerryRd ChildsRd 7,500'longwideningfor6'bikelanes,6'sidewalk/pathway,bothsides.Railroadcrossingreconstruction;retainingwallneededatcrossing.

16,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty LakeOswego 11171 TryonCreekPedBridge(@TryonCovePark) FoothillsPark TryonCovePark 500'long,10'wideasphaltpathwaycompletesaconnectionattheexistingnorthendFoothillspathwaywithtoTryonCoveParkwithapedestrianbridge(perFoothillsDistrictPlan).ConnectstofutureWillametteRiverGreenwayTrail.

3,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty LakeOswego 11172 OR43(StateSt)BikeLanes TerwilligerBlvd McVeyRd 5,500'longwideningforbikelanes,NBandSB.NHS/AASHTO/ODOTstdsapply.ImproveaccessandconnectivitytotheFoothillsarea.

10,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty LakeOswego 11286 TryonCreekBridge(@Hwy43/Terwilliger) 500'northofHwy43/Terwilliger

Hwy43/EAve ReplaceexistingboxculvertunderHwy43withvehicularbridgeoverTryonCreek,addmulti-usepathwayalongcreekandcompletewithbikelanes,sidewalksandturnlanetoTerwilliger.Fullcostofconstructiontobesharedamongagencypartnersand/orenvironmentalactionplans.

10,000,000$ 2028-2040 No RoadsandBridges

Planning/coordinatemulti-jurisdictioninvestments

ClackamasCounty LakeOswego 11396 SouthShorePathway LakeviewBlvd McVeyAve 12,800’long,6’wideseparatedasphaltpathwayonsouthsideofroadway.Retainingwallsandstormwaterimprovementsrequired.

12,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty LakeOswego 11397 OR43Pathway:LOtoWestLinn OakSt ArborDr ImplementthedesignplanforanactivetransportationcorridoralongHwy43consistentwiththeConnectingClackamasPlan.

19,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty LakeOswego 11613 KnausRdPathwaysandBikeLanes BoonesFerryRd CountryClubRd 4,000’long,6’wideseparatedasphaltpathwayand5'widebikelanesonbothsidesofroadway.

9,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty Milwaukie 10098 McLoughlinBlvdSidewalks HarrisonSt UPRR Fillinsidewalkgapsonbothsidesofstreet. 5,700,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty Milwaukie 10100 Group9--DowntownPedestrianImprovements

Downtown Downtown DowntownStreetscapeImprovements=Installsidewalkbulbouts,lighting,andpedestrianamenities.

DowntownParkingSignage=InstallwayfindingandidentificationsignageatMcLoughlinBlvdintersectionsandaroundpublicparkinglots.

DowntownPublicParkingLotImprovements=Upgradeandmaintainoff-streetpublicparkingfacilitieswithimprovedlandscapingandlighting.

13,800,000$ 2028-2040 No ActiveTransportation

Linklandusewithtransportationinvestments

ClackamasCounty Milwaukie 10101 KelloggCreekDamRemovalandOR99EUnderpass

Location-Specific Location-Specific ReplaceOR99EbridgeoverKelloggCreek,removedam,restorehabitat.Constructbike/pedundercrossingbetweendowntownMilwaukieandRiverfrontPark.

10,500,000$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 4of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

ClackamasCounty Milwaukie 11174 Group3--ImprovedBike/PedConnectionstoSpringwaterTrailnearTacomaStation

VariousLocations VariousLocations 29th/Harvey/40thNeighborhoodGreenway=Designateasa"neighborhoodgreenway"andinstalltraffic-calmingimprovements.

ImprovedConnectionfromSpringwaterTrailtoPendletonSite(Ramps)=ConstructrampstoimproveexistingconnectionofSpringwaterTrailtoPendletonsiteatClatsopSt.(TSAP)

ImprovedConnectionfromSpringwaterTrailtoPendletonSite(WidenedUndercrossing)=WidenexistingundercrossingtoimproveconnectionofSpringwaterTrailtoPendletonsiteatClatsopSt.(TSAP)

ImprovedConnectionfromSpringwaterTrailtoTacomaStation=ConstructstairstoconnectSpringwaterTrailtoTacomastation.(TSAP)

ImprovedConnectionfromSpringwaterTrailtoPendletonSite(Tunnel)=ConstructtunnelunderSpringwaterTrailtoimproveconnectiontoPendletonsiteatClatsopSt.(TSAP)

ImprovedConnectionfromSpringwaterTrailtoMcLoughlinBlvd=ConstructstairsorotherfacilitytoconnectSpringwaterTrailtowestsideofMcLoughlinBlvd.(TSAP)

SpringwaterTrailCompletion=ContributetoregionalprojecttocompleteSpringwaterTrail("SellwoodGap")alongOchocoSt.

Bicycle/PedestrianImprovementstoMainSt-Constructmultiusepathorotherimprovedbike/pedfacilitiesonMainSttoprovidesaferconnectionbetweendowntownandTacomastation.(TSAP).-Phase1Committed=

8,900,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty Milwaukie 11175 PublicParkingStructure Location-specific Location-specific Construct3-to4-storypublicparkingstructurewithretailatgroundfloorforvisitor/employeeparking.

14,700,000$ 2028-2040 No TSMO/TDM/TOD Relievefuturecongestion

ClackamasCounty Milwaukie 11532 LinwoodAveCapacityImprovements(south) MonroeSt HarmonyRd Widentostandardthreelanecrosssection. 10,300,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

ClackamasCounty Milwaukie 11536 DowntownTransitCenterImprovements Location-specific Location-specific Constructnewbuslayoverfacilityoutsideofthedowntowncore. 1,100,000$ 2028-2040 No Transit Relievecurrentcongestion

ClackamasCounty Milwaukie 11538 LinwoodAveCapacityImprovements(north) JohnsonCreekBlvd MonroeSt Widentostandardthreelanecrosssection. 12,800,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

ClackamasCounty Milwaukie 11623 Group11--IntersectionImprovementsinNorthIndustrialArea

OchocoSt HarrisonSt SignageandIntersectionImprovementsatMcLoughlinBlvdandOchocoSt=Establishsignagefortrucksandimproveintersection.(TSAP)

IntersectionImprovementsatMcLoughlinBlvdand17thAve=Prohibitleft-turnmovementfrom17thAvetonorthboundMcLoughlinBlvdandincludeinHwy224&Hwy99ERefinementPlan.

IntersectionImprovementsatMainStandMailwellDr=Upgradeintersectionturningradiitobetteraccommodatefreightmovements.

2,300,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

ClackamasCounty Milwaukie 11624 LocalStreetImprovementsinTacomaStationArea

Location-specific Location-specific ConstructstreetimprovementsonStubbSt,BetaSt,OchocoSt,HannaHarvesterDr,andMailwellDr.(TSAP)

5,600,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac

ClackamasCounty Milwaukie 11957 LakeRdCapacityImprovements 21stAve OatfieldRd Widentostandardthreelanecrosssection. 6,300,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

ClackamasCounty ODOT 11992 I-205OperationalImprovements ColumbiaRiver I-5 ConstructimprovementstoaddressbottlenecksandimprovesafetyonI-205.Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysisandrefinementplanning.

20,000,000$ 2028-2040 No Throughways Increasesystemefficiency

ClackamasCounty ODOT 12020 OR212/224SunriseProjectPhase3 I-205 172ndAve ConstructremainingimprovementsintheSunriseCorridorconsistentwiththeFEIS/ROD

475,000,000$ 2028-2040 No Throughways Relievecurrentcongestion

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 5of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

ClackamasCounty OregonCity 10048 HollyLaneBike&PedestrianImprovements RedlandRoad MapleLane Improvetoaminorarterialcross-section,addingsidewalksandbikelanestobothsidesfromRedlandtoSDonovan,replacingthebridgejustsouthofRedlandandaddinganenhancedstreetcrossingatSDonovan.CompletesidewalkandbikelanegapsoneastsideofthestreetbetweenDonovanandMapleLane.(TSPProjectD83,W21,W22,B19,B20,C8)TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.

17,000,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

ClackamasCounty OregonCity 10120 WashingtonStreetBike&PedestrianImprovements(South)

HomeDepotDrive AbernethyRoad CompletetheBoulevardprojectincludingstormwaterlowimpactdevelopmentdesignimprovements,sidewalks,landscapingandstreetlighting.(TSPW5)

1,900,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

ClackamasCounty OregonCity 10144 Hwy99E&I-205SBInterchangeAccess DunesDrive I-205SBRampTerminus Dualleftturnlaneson99EapproachtoSBI-205ramp,rampwideningtoaccommodateapproach.(CloselyrelatedtoTSPD75,D76butnotactuallytheseprojects)

3,000,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

ClackamasCounty OregonCity 10147 NewellCreekCanyon/HollyLaneShared-UsePath

Hwy213andRedlandRoad

MapleLaneRoad Addashared-usepathalongthewestsideofthegullybetweentheRedland/LivesayandHolly/DonovanintersectionandthenalongHollyLanebetweenDonovanandMapleLane.WillrequireabridgeoverthegullysouthofRedlandRoad(TSPProjectS12,S13).TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.

5,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty OregonCity 10150 BarlowRoadShared-UseTrail AbernethyRoad UGB Addashared-usepathonthewest/southsideofRedlandRoad,alongthenorthsideofthegullyfromtheRedland/LivesaytoHolcomb/OakTreeintersection,andfromHolcombtoAmesStreet.InstallenhancedcrossingsatRedlandRoadandHolcombBlvd(TSPS6,S9,S10,S11,C5,C7)TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.

4,600,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty OregonCity 11186 WillametteRiverShared-UsePath S2ndStreet UGB Addashared-usepathalongtherailroadgrade.RehabilitateexistingboardwalkbetweenSouth2ndStreetandHedgesStreet(TSPProjectS37)TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.

6,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty OregonCity 11547 ClairmontDriveExtension BeavercreekRoad HollyLane Constructnew3laneroadway,sidewalks,bikelanes,turnlanestoserveUGBexpansionarea.(TSPD54)

2,000,000$ 2028-2040 No RoadsandBridges

Servenewurbanarea

ClackamasCounty OregonCity 11548 WashingtonStreetBike&PedestrianImprovements(North)

11thStreet 7thStreet Boulevardimprovementsincludingwideningsidewalks,sidewalkinfill,ADAaccessibility,bikelanes,reconfiguretravellanes,addbusstopamenities.(TSPD28&D92plus50%ofD1)

1,600,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

ClackamasCounty OregonCity 11550 HollyLaneExtension(South) ThayerRoad MeyersRoad New3laneroadway,sidewalks,bikelanes,turnlanestoserveUGBexpansionarea.(TSPD58)

4,800,000$ 2028-2040 No RoadsandBridges

Servenewurbanarea

ClackamasCounty OregonCity 11551 SouthEndRoad PartlowRoad UGB Streetimprovementsincludinglanereconfigurations,sidewalks,ADAaccessibility,bikelanes,streetlighting,andtravellanes.(TSPD89,D33,D23,D41,D42)TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.

7,700,000$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

ClackamasCounty OregonCity 11552 OR99EPedestrianOvercrossing WillametteRiver McLoughlinPromenade ConstructapedestrianandbicyclebridgeoverHighway99E,connectingtheMcLoughlinPromenadetotheWillametteFallsShared-UsePath.(TSP___)

6,500,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty OregonCity 11757 McLoughlinBlvdBike&PedestrianImprovements(ViaductsOnly)

10thStreet 8thStreet Replacementoftheviaducts(onefull&onepartialviaduct),includingwidersidewalks&boulevardtreatmentsalongviaducts(PortionofTSPD74&S3)

38,000,000$ 2028-2040 No ActiveTransportation

Keepsystemingoodrepair

ClackamasCounty OregonCity 11891 OR99E&I-205NBInterchangeAccess I-205SBRampTerminus I-205NBRampTerminus Dualleftturnlaneson99EapproachtoNBI-205ramp,rampwideningtoaccomodateapproach,dualleftturnlanesfromoff-rampontoHwy99ESB,signalmodifications.(CloselyrelatedtoTSPD75,D76butnotactuallytheseprojects)

3,000,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

ClackamasCounty SMART 11749 Propertyacquisition WilsonvilleRoad WilsonvilleRoad Obtainpropertytocreateeasiercrosstownturnaroundsforlocalbusservice

8,000,000$ 2028-2040 No Transit Increasesystemefficiency

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 6of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

ClackamasCounty SMART 11750 SMARTCentralInformationalCenteratWilsonvilleStation

9699SWBarberSt,Wilsonville,OR97070

9699SWBarberSt,Wilsonville,OR97070

Buildaninformationcenterwithkioskstopurchasebuspassesandgathertransitresources.

4,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

ClackamasCounty SMART 11751 WESExpansion Wilsonville Salem WESserviceexpansionfromWilsonvilletoSalem 15,000,000$ 2028-2040 No Transit Relievecurrentcongestion

ClackamasCounty Wilsonville 11770 WeidemanRoadExtension-West ParkwayAve CanyonCreekRoad Constructnewroadwaywithsidewalksandbufferedbikelanes 4,300,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

ClackamasCounty Wilsonville 11771 WeidemanRoadExtension-East CanyonCreekRoad StaffordRoad Constructnewroadwithsidewalksandbufferedbikelanes 8,800,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

ClackamasCounty Wilsonville 11775 ParkwayAveUrbanUpgrade Target/CostcoEntrance PrinterParkway Widento3lanesectionandaddsidewalksandbufferedbikelanes 5,000,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

ClackamasCounty Wilsonville 11776 PrinterParkwayUrbanUpgrade ParkwayAvenue CanyonCreekRoad Widento3lanesectionandaddsidewalks,bikelanesandmulti-usepath. 3,600,000$ 2028-2040 No RoadsandBridges

Increaseaccesstojobs

ClackamasCounty,MultnomahCountyODOT 11985 I-205MultiUsePath GlenJacksonBridge 82ndDrive(southernterminus)

ImprovecrossingsandaccesstoI-205MUPatParkroseTransitCenter,Glisan,Burnside,Stark,Washington,SpringwaterTrail,JohnsonCreek/Flavel,CrystalSprings,ClackamasTownCenter,andotherlocations,asneeded.

10,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty,WashingtonCountyClackamasCounty 10054 65th/Elligsen/StaffordIntersectionRoundabout

65th,Elligsen,StaffordRd.intersections

65th,Elligsen,StaffordRd.intersections

Constructroundabouttoreplaceexistingunsafeintersectiontoimprovesafetyandreducecongestion.

5,846,500$ 2028-2040 No RoadsandBridges

Reducefatalandsevereinjurycrashes

ClackamasCounty,WashingtonCountyClackamasCounty 11939 I-205BusServicefromClackamastoBridgeport

EndoftheTriMetMAXGreenLineatClackamasTownCenter

EndoftheproposedSWCorridorHCTprojectatBridgeport

ProvidebusserviceonorparalleltoI-205connectinghighcapacitytransitwithemploymentcentersfromClackamasTownCenter(endoftheMaxGreenLine)toBridgeport(proposedendofSouthwesthighcapacitytransitproject)

23,300,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

MultnomahCounty Gresham 10416 HoganCorridorImprovements Stark Burnside Interimcapacityimprovementsandaccesscontrols. 20,346,310$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

MultnomahCounty Gresham 10417 Hogan:PalmquisttoRuggNewPrincipalArterialConnection

Palmquist RuggRd. Completeprojectdevelopmentandconstructnewprincipalarterialconnectionwithmulti-usepath.

36,152,117$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

MultnomahCounty Gresham 10422 Division:257th/KanetoCityLimits 257thAve. Citylimits Improvetocommunitystreetstandards,includingbikelanes. 4,194,291$ 2028-2040 No ActiveTransportation

Buildcompletestreet

MultnomahCounty Gresham 10424 Wallula/212th:DivisiontoStarkWidening Division Stark Widenroad,addcurb/gutter,sidewalks.AtBurnside,addnorthbound,southbound,leftturnlanes.SignalizeStark.

8,873,911$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty Gresham 10427 Regner:RobertstoSouthernCityLimitsReconstruction

Roberts SouthernCityLimits Bringstominorarterialstandard,addspedestrian,bicyclefacilities,improvesRegner/ButlerintersectionbyaddingNBleft-turnpocketandsignalizingintersection.

31,109,301$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty Gresham 10429 PowellValley:Burnsideto282ndBikeandPedImprovements

Burnside 282nd.Ave. ImprovePowellValleyw.pedandbikefacilities. 15,568,069$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Gresham 10430 Orient:SouthCitylimitstoKaneDrWidening SouthCityLimits KaneDr Upgradestoarterial4lanestandards. 9,567,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty Gresham 10432 Division:WallulatoBurnsideBoulevardImprovements

Birdsdale Wallula Completeboulevarddesignimprovements. 12,928,707$ 2028-2040 No ActiveTransportation

Buildcompletestreet

MultnomahCounty Gresham 10433 Division:KellytoBurnsideBoulevardImprovements

Kelly Burnside Completeboulevarddesignimprovements. 10,982,649$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty Gresham 10434 Burnside:212thtoHoganBoulevard Wallula Hogan CompleteboulevarddesignimprovementsonBurnsidefromWallula/212toHogan.ImproveintersectionofBurnsideatDivisionbyaddingeastboundRTandsignal,andalsoimprovetheintersectionofBurnsideandHogan.

34,595,974$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty Gresham 10447 162nd:GlisantoHalseyWidening&Bike/PedImprovements

Glisan Halsey Reconstruct,widento5lanes,plusEBRTatGlisan. 8,413,967$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty Gresham 10461 Towle:ButlertoBinfordLakeImprovements Butler BinfordLake Constructsidewalks,bikelanesandintersectionimprovements. 3,510,850$ 2028-2040 No ActiveTransportation

Buildcompletestreet

MultnomahCounty Gresham 10493 181st:I-84toSandyWidening Sandy I-84 Addsouthboundauxlane&widenRRovercrossing. 1,000,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

MultnomahCounty Gresham 10497 181st:atStarkandSandyIntersections Sandy Stark AtSandy:Northboundrightturn,2ndwestboundleftturn.Overlapeastboundrightturn.AtStark,add2ndleftturnlaneoneastandwestlegs.

2,003,107$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 7of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

MultnomahCounty Gresham 10527 Hogan:PowelltoPalmquistWidening Powell Palmquist Improvetoarterialstandards. 13,228,630$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty Gresham 10541 182nd:GiesetoCheldelin Giese Cheldelin Improve182ndtocollectorstandards. 12,540,944$ 2028-2040 No RoadsandBridges

Servenewurbanarea

MultnomahCounty Gresham 11098 RockwoodTC181stLRTStationEnhancements

181stLRTStation LocalstreetstoLRTstation

Improvesidewalks,lighting,crossings,busshelters,benchesat181stLRTstation,onStarkSt.andotherintersectingstreets.

9,481,551$ 2028-2040 No ActiveTransportation

Increasesystemefficiency

MultnomahCounty Gresham 11252 Halsey:162ndto181stACMandTransitSignalPriority

162nd 181st Installupgradedtrafficsignalcontrollers,establishcommunicationstothecentraltrafficsignalsystem,providearterialdetection(includingbicycledetectionwhereappropriate)androutinelyupdatesignaltimings.Providerealtimeandforecastedtravelerinformationonarterialroadwaysincludingcurrentroadwayconditions,congestioninformation,traveltimes,incidentinformation,constructionworkzones,currentweatherconditionsandothereventsthatmayaffecttrafficconditions.

5,208,700$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

MultnomahCounty Gresham 11253 Stark:162ndto190thACMSignalUpgrades 162nd 190th Installupgradedtrafficsignalcontrollers,establishcommunicationstothecentraltrafficsignalsystem,providearterialdetection(includingbicycledetectionwhereappropriate)androutinelyupdatesignaltimings.Providerealtimeandforecastedtravelerinformationonarterialroadwaysincludingcurrentroadwayconditions,congestioninformation,traveltimes,incidentinformation,constructionworkzones,currentweatherconditionsandothereventsthatmayaffecttrafficconditions.

3,826,800$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

MultnomahCounty Gresham 11256 Division:BirdsdaletoUS26AdaptiveSigns+TransitPriority

Birdsdale US26 IncludestheACMwithbothadaptivesignaltimingandtransitprioritytreatment.

2,232,300$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

MultnomahCounty Gresham 11603 Hogan:PowelltoDivision Powell Division BuildoutofHogantomajorarterialcross-section. 26,575,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

MultnomahCounty MultnomahCounty 10386 GlisanSt.Multi-modalImprovements 202ndAve./Gresham-FairviewTrail

207thAve./SalishPondsNaturalArea

ReconstructGlisanStreettoprovidemultimodalconnectionbetweenGresham-FairviewTrailandSalishPondsNaturalArea.Includebikelanes,sidewalks,twotravellanesineachdirection,andon-streetparking.4lanes.Designgreen-streettreatmentfordrainageimprovements,includingFairviewCreekculvertreplacement.SouthsideofGlisanStisinGresham,northisCityofFairview.

12,224,500$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty MultnomahCounty 10391 ReconstructHistoricColumbiaRiverHwy. 244thAve. HalseySt. ReconstructHistoricColumbiaRiverHwyandNE244thAvetominorarterialstandardswith2travellanes,centerturnlane/median,bicyclelanesandsidewalk.ReconstructionofrailroadbridgeonHCRHisnotincludedinthisproject.

6,538,513$ 2028-2040 No ActiveTransportation

Increasesystemefficiency

MultnomahCounty MultnomahCounty 10395 ReplaceRRovercrossingatHistoricColumbiaRiverHwy

Halfmileeastof244thAve.

Halfmileeastof244thAve.

Reconstructrailroadbridgetoaccommodatewidertravellanes,sidewalksandbikelanes.

7,441,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

MultnomahCounty MultnomahCounty 10401 ReconstructMarineDr. Interlachen I-84 ReconstructMarineDrivebetweenIntelachenandthefrontageroadsinTroutdale.

14,882,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

MultnomahCounty MultnomahCounty 10407 Fishpassageculvertreplacement FairviewandArataCreeks FairviewandArataCreeks

Replace5culvertswithfishfriendlystructuresallowingforpassagetofederallyendangeredspecies.Culvertlocations:223rd/Fairview,Sandy/Fairview,Arata/244th,ArataCreek/Halsey,Fairview/Glisan

1,606,193$ 2028-2040 No RoadsandBridges

Keepsystemingoodrepair

MultnomahCounty MultnomahCounty 11297 NE207thAve.:ArterialCorridorManagement(ACM)

Sandy Glisan Installupgradedtrafficsignalcontrollers,establishcommunicationstothecentraltrafficsignalsystem,providearterialdetection(includingbicycledetectionwhereappropriate)androutinelyupdatesignaltimings.Providerealtimeandforecastedtravelerinformationonarterialroadwaysincludingcurrentroadwayconditions,congestioninformation,traveltimes,incidentinformation,constructionworkzones,currentweatherconditionsandothereventsthatmayaffecttrafficconditions.

1,647,650$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

MultnomahCounty MultnomahCounty 11299 257th/KaneDr.:ArterialCorridorManagement(ACM)w/AdaptiveSignalTiming

I-84 OrientDr. Installupgradedtrafficsignalcontrollers,establishcommunicationstothecentraltrafficsignalsystem,providearterialdetection(includingbicycledetectionwhereappropriate)androutinelyupdatesignaltimings.Providerealtimeandforecastedtravelerinformationonarterialroadwaysincludingcurrentroadwayconditions,congestioninformation,traveltimes,incidentinformation,constructionworkzones,currentweatherconditionsandothereventsthatmayaffecttrafficconditions.

2,976,400$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

MultnomahCounty MultnomahCounty 11375 StarkStreetBridge StarkStreetBridgeatSandyRiver

RepairandupdateStarkStreetBridge. 15,945,000$ 2028-2040 No RoadsandBridges

Keepsystemingoodrepair

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 8of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

MultnomahCounty MultnomahCounty 11376 EarthquakeReadyBurnsideBridgePhase2 WillametteRiver WillametteRiver ERBBDesignandROWPhase 105,000,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

MultnomahCounty MultnomahCounty 11599 ATPProjectImplementation EastMultnomahCounty EastMultnomahCounty ImplementationofrecommendationsfromATP 21,260,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

MultnomahCounty MultnomahCounty 11600 MarineDriveat223rd MarineDriveat223rd MarineDriveat223rd Widentoaccommodatefreighttrafficandprovidebike/pedfacilities 10,630,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac

MultnomahCounty MultnomahCounty 11688 SandytoSpringwaterPathPlanning SpringwaterCorridor 40-mileloop SandytoSpringwaterPath:masterplan 1,594,500$ 2028-2040 No ActiveTransportation

Planning/coordinatemulti-jurisdictioninvestments

MultnomahCounty MultnomahCounty 12018 TDMandTSMOinEastMultnomahCounty EastMultnomahCounty EastMultnomahCounty CarandVanpoolincentives,TMAs,Shuttles,supportprograms,andtargetedoutreachtoreducesingleoccupantvehicletravel

2,258,875$ 2028-2040 No TSMO/TDM/TOD Increasetraveloptions/alt.todrivingalone

MultnomahCounty ODOT 11583 I-5Northbound:LowerBoonesFerrytoCarmanAuxiliaryLaneExtension

LowerBoonesFerryRd.Interchange

CarmanDr.Interchange ExtendexistingauxiliarylanebetweentheLowerBoonesFerryRoadinterchangeandtheCarmanDriveinterchange.

22,500,000$ 2028-2040 No Throughways Increasesystemefficiency

MultnomahCounty ODOT 11974 I-405OperationalImprovements FremontBridge I-5 ConstructoperationalimprovementstoaddressbottlenecksandimprovesafetyonI-405.Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysis,andrefinementplanning

50,000,000$ 2028-2040 No Throughways Increasesystemefficiency

MultnomahCounty ODOT 11983 I-5Multi-UsePath HaydenIslandDrive VictoryBlvd ConstructimprovementstotheI-5MUPinJantzenBeachtobringpathuptocurrentstandards,improvesafety,andimproveaccesstotheI-5ColumbiaRiverBridge.Improveped.crossingsatTomahawkIslandDriveandHaydenIslandDrive.

10,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty ODOT 11993 I-84OperationalImprovements I-5 Troutdale ConstructimprovementstoaddressbottlenecksandimprovesafetyonI-84.Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysisandrefinementplanning

20,000,000$ 2028-2040 No Throughways Increasesystemefficiency

MultnomahCounty PortofPortland 10364 PDXLightRailStation/TrackRealignment PDXTerminalArea PDXTerminalArea Realignlightrailtrackintoterminalbuildingtoaccommodateairlinegateexpansions.

17,359,534$ 2028-2040 No Transit Linklandusewithtransportationinvestments

MultnomahCounty PortofPortland 11309 CullyBlvd.Gradeseparation Columbia Lombard ConstructroadwayovercrossingatNECullyBlvd.overKentonline. 37,205,000$ 2028-2040 No Freight Increasesystemefficiency

MultnomahCounty PortofPortland 11949 NorthPortlandJunction:Undoingthe"X" UPRRPeninsulaJunction NorthPortlandJunction Eliminatetheat-gradecrossingofUPRRandBNSFtracksatNorthPortlandJunction.

33,598,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac

MultnomahCounty PortofPortland 11951 ColumbiaBoulevardRailOvercrossing ColumbiaBoulevardatPennJunction

ColumbiaBoulevardatPennJunction

GradeseparateColumbiaBlvd.atPennJunctiontoeliminatethreeat-gradecrossings.

28,935,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

MultnomahCounty PortofPortland 11952 ColumbiaRiverRailBridgeImprovements ColumbiaRiverRailBridge

ColumbiaRiverRailBridge

ReplaceExistingswingspanwithliftspanandrelocatepositiontomid-riverchannel.

35,548,800$ 2028-2040 No Freight Increasesystemefficiency

MultnomahCounty PortofPortland 11953 SixmphCurvesRailroadImprovements SteelBridge JustnorthofSteelBridge

RealignthecurvesjustnorthoftheSteelBridgetoimproverailspeedandcapacity.

23,600,000$ 2028-2040 No Freight Increasesystemefficiency

MultnomahCounty PortofPortland 11955 RailroadBridgeandTrackImprovements ColumbiaSloughRailBridge

ColumbiaRiverRailBridge

ImproverailtrackconditionsonapproachestoWillametteRiverandColumbiaRivebridgestoincreaserailroadspeedandcapacity.

10,751,000$ 2028-2040 No Freight Increasesystemefficiency

MultnomahCounty PortofPortland 11956 RivergateColumbiaSloughRailBridge Terminal6 Terminal5 ConstructarailbridgeacrossColumbiaSloughtoproviderailconnectiontoSouthRivergatefromTerminal6.

10,840,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac

MultnomahCounty Portland 10222 FlavelDrRoadwayImprovements SE45th Clatsop FullyimprovestreetfromSE45thtoClatsopStreetwithtravellanes,curbs,swales,sidewalks,andseparatedin-roadwaybicyclefacilitiesfrom52ndtoClatsop.

7,294,088$ 2028-2040 No ActiveTransportation

Buildcompletestreet

MultnomahCounty Portland 10244 KittridgeBridgeSeismicRetrofit NWKittridge/YeonBridge NWKittridge/YeonBridge

Retrofitexistingseismicallyvulnerablebridge(#010)acrossrailroadtrackstoensureemergencyresponseandaccesstopetroleumsupplieslocatedalongtheWillametteRiverintheeventofanearthquake.

15,249,213$ 2028-2040 No Freight Keepsystemingoodrepair

MultnomahCounty Portland 10288 ParkroseConnectivityImprovements,NE 105th 109th SupplementaccessrouteforcommercialpropertiesinParkrosebyimproving109thfromSandytoKillingsworthandKillingsworthfrom109thto105th,servingtruckaccessfunctions,pedestrian,andbikeconnections.

5,000,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 9of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

MultnomahCounty Portland 10292 BelmontStreetscapeImprovements SE25th SE43rd Designandimplementstreetscapeimprovementstoenhancesidewalks,lighting,crossings,transitstops,andsignals.

5,722,698$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 10293 NEFremontStreetscapeImprovements NE42nd NE52nd Designandimplementstreetscapeimprovementstoenhancesidewalks,lighting,crossings,transitstops,andsignals.

7,446,133$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 10295 OuterMilwaukieStreetscapeImprovements SEYukon SETacoma Designandimplementstreetscapeimprovementstoenhancesidewalks,lighting,crossings,transitstops,andsignals.

5,386,378$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 10308 BoonesFerryRdBikeway SWTerwilliger PortlandCityLimits Designandimplementbicyclefacilities. 7,015,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 10316 HalseyStBridgeSeismicRetrofit NEHalsey/I-84 NEHalsey/I-84 RetrofitexistingseismicallyvulnerablebridgeacrossI-84(#021)toensureemergencyresponseandeconomicrecoveryintheeventofanearthquake.

7,670,501$ 2028-2040 No RoadsandBridges

Keepsystemingoodrepair

MultnomahCounty Portland 10334 11th/13thAveRailOvercrossing NE11thAve&NELombardPl

NE11thAve&NELombardPl

ConstructroadwayovercrossingatNE11th/13thoverKentonline. 35,000,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

MultnomahCounty Portland 10339 ColumbiaBlvdProtectedBikeway MLKJr.Blvd NLombard Designandimplementaprotectedbikewayormulti-usepath. 6,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 10347 PleasantValleyFosterRdExtension SEJenneRd SEGieseRd. DesignandimplementmultimodalimprovementsbasedonthePleasantValleyImplementationPlanrecommendations.

2,525,400$ 2028-2040 No RoadsandBridges

Servenewurbanarea

MultnomahCounty Portland 10376 ColumbiaBlvdFreightImprovements:Design/Construction

NE60thAve. NE82ndAve. Constructstreetandintersectionmodificationstoimprovefreightreliabilityandaccesstoindustrialproperties.

14,000,000$ 2028-2040 No Freight Increasesystemefficiency

MultnomahCounty Portland 10536 ClatsopStreetExtension SE162ndAve PortlandCityLimits ExtendstreeteastintoPleasantValleybasedonthePleasantValleyImplementationPlan.

4,202,582$ 2028-2040 No RoadsandBridges

Servenewurbanarea

MultnomahCounty Portland 11117 WillbridgeIndustrialAreaRailOvercrossing NWBalboa NWStHelensRd ProvideanalternativecrossingoftheBNSFRailroadtoimproveconnectivityandsafetybetweenUS30andtheindustrialpropertiesservedbyNWFrontAvenueintheWillbridgeareaoftheNWIndustrialDistrict.

23,113,022$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

MultnomahCounty Portland 11323 Sullivan'sGulchTrail,Segment1 EastbankEsplande NE21st Multi-usepathalongSullivan'sGulch.ProjectrequirestheuseofUnionPacificright-of-waytobefeasible,otherwiseanalternatealignmentwillneedtobedeveloped.

40,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 11870 UnionStation,Phase3 UnionStation UnionStation Corebuildingimprovements,operationalimprovements,andrailsideimprovementsforUnionStation.

150,000,000$ 2028-2040 No Transit Keepsystemingoodrepair

MultnomahCounty Portland 11871 Going/GreeleyInterchangeImprovements NGoing/Greeley NGoing/Greeley RedesignGoing/GreeleyinterchangeincludingclimbinglaneonGoingtoimprovetruckmovementbetweenSwanIsland,LowerAlbina,andI-5.

16,750,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac

MultnomahCounty Portland 11872 NFessendenStBridgeReplacement FessendenSt,N(overrailroadcut)

FessendenSt,N(overrailroadcut)

Replaceexistingstructurally-deficient,weight-restrictedbridge(ownedbyBNSF)overrailroadcut.

4,700,000$ 2028-2040 No RoadsandBridges

Keepsystemingoodrepair

MultnomahCounty Portland 11873 NWillametteBlvdBridgeReplacement WillametteBlvd,N(overrailroadcut)

WillametteBlvd,N(overrailroadcut)

Replaceexistingstructurally-deficient,weight-restrictedbridge(ownedbyBNSF)overrailroadcut.

9,750,000$ 2028-2040 No RoadsandBridges

Keepsystemingoodrepair

MultnomahCounty Portland 11874 HaydenIslandBridge MarineDr HaydenIsland DesignandconstructanarterialbridgefromExpoCentertoEastHaydenIsland.Explorefeasibilityofdesignsthatwouldprioritizetransit,bikes,andemergencyvehicleaccess,andnotfacilitatecut-throughtrafficforvehiclesthatdonothaveoriginsordestinationsontheisland.

80,000,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 10of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

MultnomahCounty Portland 11875 NEArgyleStreetExtension 14th MLK ExtendNEArgyletoprovideamoreconnectedstreetgrid.Thisstreetwillserveasacollector/distributorforindustrialbusinessesandreducetrafficcongestionattheMLK/Columbiaintersection.

11,397,579$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

MultnomahCounty Portland 11876 NMississippiStreetscapeImprovements Fremont Skidmore ConstructstreetscapeimprovementstoenhancetheareaasaPedestrianDistrict.

2,500,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 11878 Sullivan'sGulchTrail,Segment2 21stAve HollywoodTransitCenter

Constructamulti-usetrailforpedestriansandbicycleswithintheBanfield(I-84)Corridorfrom21stAvetotheHollywoodTransitCenter.ProjectrequirestheuseofUnionPacificright-of-waytobefeasible,otherwiseanalternatealignmentwillneedtobedeveloped.

30,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 11879 Sullivan'sGulchTrail,Segment3 HollywoodTransitCenter Broadway Constructamulti-usetrailforpedestriansandbicycleswithintheBanfield(I-84)CorridorfromtheHollywoodTransitCentertoBroadway.ProjectrequirestheuseofUnionPacificright-of-waytobefeasible,otherwiseanalternatealignmentwillneedt

35,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 11880 CullyBlvdRailOvercrossing NECullyBlvd(overKentonline)

NECullyBlvd(overKentonline)

ConstructroadwayovercrossingatNECullyBlvd.overKentonline. 35,000,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac

MultnomahCounty Portland 11882 SE13thAveStreetscapeImprovements Malden Tacoma Planandimplementstreetscapeandtransportationimprovements,includingcrossingimprovements,toincreaseopportunitiestowalkandenhancethemainstreetcharacter.

2,223,555$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty TriMet 11318 StreetcarExtension:MLK Broadway Killingsworth Publicoutreach,planning,design,engineering,andconstructionforfuturestreetcarextensionfromLloydDistricttoNEPortland.

65,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

MultnomahCounty TriMet 11639 Streetcar:JohnsLanding SWLowell WillamettePark CorridorAlternativesAnalysis,publicoutreach,planning,design,engineering,andconstructionforfuturestreetcarextensionfromPortlandtoJohnsLanding.Potentialfutureconstruction.

80,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

MultnomahCounty TriMet 12033 ETC:SEBelmontEnhancedTransitProject CentralCityPortland GatewayTransitCenter Capitalconstructionofregionalenhancedtransitproject. 20,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

MultnomahCounty TriMet 12034 ETC:Lombard/CesarChavezEnhancedTransitProject

St.JohnsTownCenter MilwaukieTownCenter Capitalconstructionofregionalenhancedtransitproject.ProjectwillcoordinatewithODOTtoidentifylocationsanddesigntreatments.

50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

MultnomahCounty TriMet 12035 ETC:SEPowellBlvdTransitProject CentralCityPortland TBD Constructmulti-modalsafetyandtransitimprovementsbasedontheoutcomesoftheprecedingSEPowellBlvdCorridorsRefinementPlan.ProjectwillcoordinatewithODOTtoidentifylocationsanddesigntreatments.

50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

MultnomahCounty TriMet 12036 ETC:ColumbiatoClackamasEnhancedTransitProject

AirportWay FosterRoad Capitalconstructionofregionalenhancedtransitproject,reflectingMultnomahCountyportionofcorridor(connectswithClackamasCounty172ndTransitProject).

20,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

MultnomahCounty TriMet 12050 CentralCityCapacityAnalysis(ProjectDevelopment&PreliminaryEngineering)

CentralCity(West) CentralCity(East) AstudytoanalyzeCentralCitytransitcapacityandidentifypreferredoptionstoaddresstransitbottlenecks,delays,layoverneedsandimprovetransitreliability,traveltimesandregionalmobility.Includeanalysisofapotentialtunneloption.

50,000,000$ 2028-2040 No Transit Relievefuturecongestion

MultnomahCounty,WashingtonCountyODOT 11971 US26(SunsetHighway)OperationalImprovements

I-405 WestMPOBoundary ConstructImprovementstoaddressbottlenecksandimprovesafetyonUS26(SunsetHighway)Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysis,andrefinementplanning

50,000,000$ 2028-2040 No Throughways Increasesystemefficiency

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 11of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

Region-wide Metro 11965 AdditionalCorridorInvestmentAreasActivitiesfor2028-2040

Regional Regional TheRTPidentifiesmobilitycorridorsandfuturehighcapacitytransitcapitalinvestmentsneededtosupportthe2040GrowthConcept.Corridorinvestmentareasactivitiesfocusonaligninginvestmentsaroundspecificoutcomestosupportlocalandregionalgoalsinlocationswithmultijurisdictionalinterests.InvestmentareasactivitiesincludecompletingcorridorrefinementplanninganddevelopingmultimodalprojectsinmajortransportationcorridorsidentifiedintheRTPaswellasdevelopingsharedinvestmentstrategiestoalignlocal,regionalandstateinvestmentsineconomicinvestmentareasthatsupporttheregion’sgrowtheconomy.Activitiesincludeongoinginvolvementinlocalandregionaltransitandroadwayprojectconception,funding,anddesign.Metroprovidesassistancetolocaljurisdictionsforthedevelopmentofspecificprojectsaswellascorridor-basedprogramsidentifiedintheRTP.

11,300,000$ 2028-2040 No Other Planning/coordinatemulti-jurisdictioninvestments

Region-wide Metro 11968 AdditionalRegionalMPOActivitiesfor2028-2040

Regional Regional Additionalsystemplanning,topicalplanning,andactivitiesthatMetrofortheperiod2028-2040inordertoremaincertifiedasanmetropolitanplanningorganizationbythefederalgovernmentandbeeligibletoreceiveanddistributefederaldollars

26,800,000$ 2028-2040 No Other Planning/coordinatemulti-jurisdictioninvestments

Region-wide Metro 11979 AdditionalRegionalTODInvestmentsfor2028-2040

2040Centers,stationareasandcorridors

2040Centers,stationareasandcorridors

ThecoreprogramactivityistoprovidefinancialincentivesforTODprojectstoincreasetransitridership,stimulateprivatedevelopmentofmixed-usebuildingsthatwouldotherwisenotproceed,andincreaseaffordablehousingopportunitiesinhighcostandgentrifyingneighborhoodsthroughlandacquisitionandprojectinvestments.

66,950,000$ 2028-2040 No TSMO/TDM/TOD Linklandusewithtransportationinvestments

Region-wide Metro 12011 AdditionalRegionalTravelOptionsActivitiesfor2028-2040

Regional Regional Metroawardsgrantfunding,coordinatesmarketingefforts,andprovidestechnicalassistanceandevaluationtoagenciesandorganizationstoencouragepeopletomakefewerautotrips.RTO-fundedactivitiesincludeworksiteandcollegeinformationprogramsthatmaketransit,bicycling,walkingandridesharingeasiertouse

54,418,000$ 2028-2040 No TSMO/TDM/TOD Increasetraveloptions/alt.todrivingalone

Region-wide Metro 12014 AdditionalRegionalTSMOProgramInvestmentsfor2028-2040

Regional Regional ImplementandmaintainTransportationsSystemManagementandOperations(TSMO)investmentsusedbymultipleagencies(e.g.,CentralSignalSystem,trafficsignalpriority,datacommunicationsandarchiving)andcoordinateresponsetocrashes.Theregionalprogramalsoincludesstrategyplanning(e.g.,periodicTSMOStrategyupdates),coordinationofactivitiesforTransPortsubcommitteetoTPAC,updatestotheblueprintsforagencysoftwareandhardwaresystems(ITSArchitecture),improvingtravelerinformationwithlive-streamingdataforconnectedvehicleandmobileinformationsystems(TripCheckTravelerInformationPortalEnhancement),andimproving“bigdata”processing(PSUPORTAL)tosupportanalyzingperformancemeasures.

17,773,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

Region-wide Metro 12023 AdditionalRegionalSafeRoutestoSchoolActivitiesfor2028-2040

Regional Regional ThroughtheRegionalTravelOptionsprogram,fundingisallocatedtoschooldistrictsandotherpartnerstoimplementongoingeducationalprogramsinschoolsthatencouragechildrentowalkandbicycletoschool

10,010,000$ 2028-2040 No TSMO/TDM/TOD Increasetraveloptions/alt.todrivingalone

Region-wide Metro 12026 AdditionalRegionalTSMOCorridorsPriorityInvestmentsfor2028-2040

Regional Regional ThroughtheregionalTSMOprogram,providefundingforoperatorstoworktogethertodeploysafe,integratedcorridormanagementwithadvancedtechnologyinregionalmobilitycorridorsincludingdecisionsupportsystems,real-timetravelerinformationonroutechoiceandestimatedtraveltimethatusesavarietyofdatasensors,softwareandsystems(e.g.,smartmobilityhubs,internetofthings,connectedandautomatedvehicles).Thisalsoincludesdeploymentofinnovativetechnologysystems,automatedcorridormanagement,andotheractivetrafficmanagementstrategies.

17,773,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

Region-wide ODOT 11980 ActiveTrafficManagement(ATM)andConnectedandAutomatedVehicles(CAV)Region-widePhase2

Region-wide Region-wide DeployATMrecommendationsfromtheODOTActiveTrafficManagementStrategy.PerformenhancementstoexistinginfrastructureanddeploynewinfrastructuretosupportCAVapplications.Specificprojectstobedetermined.

10,000,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 12of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

Region-wide ODOT 11982 ActiveTransportationCriticalConnectionsRegion-Wide

Region-wide Region-wide ConstructimprovementstoaddressgapsanddeficienciesintheregionalactivetransportationnetworkonODOTfacilities.SpecificprojectstobedeterminedbasedonODOTRegion1ActiveTransportationNeedsInventory.

100,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

Region-wide ODOT 11991 I-5FreightOperationalImprovements ColumbiaRiver SouthMPOBoundary ConstructimprovementstoaddressbottlenecksandimprovesafetyonI-5.Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysisandrefinementplanning.

200,000,000$ 2028-2040 No Throughways Increasesystemefficiency

Region-wide TriMet 10920 OperatingCapital:Infrastructure N/A N/A Improveoperations,possiblegradeseparation,bikeaccommodation. 25,000,000$ 2028-2040 No Transit Keepsystemingoodrepair

Region-wide TriMet 10988 Access:Park&RideFacilities Regionwide Regionwide 50-space+/-lots(oradditionstoexistinglots)incommunities.20lotsregion-wide.

20,000,000$ 2028-2040 No Transit Relievecurrentcongestion

Region-wide TriMet 11331 Access:BusAmenities Regionwide Regionwide BusstopandROWimprovementstosupportexpansionoffrequentservicebus

15,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

Region-wide TriMet 11335 OperatingCapital:Equipment N/A N/A Additionalmaintencecoststosupportexistingbussystemincludingongoingbuspurchasesasneededtomaintainandupdatefleet.

241,301,000$ 2028-2040 No Transit Keepsystemingoodrepair

WashingtonCounty Beaverton 11900 AllenBoulevardMultimodalImprovements(MurrayBoulevardtoORHighway217)

MurrayBoulevard ORHighway217 Constructturnlanes,bikelanes,sidewalks,andsignalswhereneeded. 51,200,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Cornelius 10796 HolladayStreetExtension-Central 10thAve GraySt. Constructnewcollector. 3,212,711$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

WashingtonCounty Cornelius 10797 HolladayStreetExtension-East GraySt. 19thAve. Constructnewcollector. 3,424,538$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

WashingtonCounty Cornelius 10798 DavisStreetExtension-West 4thAve 7thAve Constructnewcollector. 4,130,629$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

WashingtonCounty Cornelius 10799 DavisStreetExtension-East 19thAve 29thAve Constructnewcollector. 10,529,421$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

WashingtonCounty Cornelius 11246 CorneliusCitywideSidewalkInfill Citywide SidewalkinfillonHeatherSt(8thAve-10thAve);4thAve(3FRailroad-Barlow);and26thAve(Holladay-S.CityLimits)

1,558,648$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Cornelius 11251 N.29thAvenue 3FRailroad Baseline Improvetocollectorstandardsincludingsidewalks. 4,501,205$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

WashingtonCounty ForestGrove 10771 HighCapacityTransit:BlueLinewest:OR8extension

Hillsboro ForestGrove ProjectDevelopmentthroughROWacquisition/earlyconstructionforHighCapacityTransitprojectbetweenHillsboroandForestGrove.

30,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

WashingtonCounty ForestGrove 11479 CouncilCreekRegionalTrail:North-SouthSegment

Hillsboro ForestGrove Multi-usetrailfromForestGrovethroughWashingtonCounty,theCityofBanks,connectingtotheBanks-VernoniaStateTrail.

27,100,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty Hillsboro 10817 AloclekDrGapCompletion CorneliusPassRd AmberwoodDr CompletemissingsegmentofAloclekDrbetweenCorneliusPassRdandAmberwoodDrasthree-laneroadwithbikelanesandsidewalks

2,126,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Hillsboro 10824 CornellRdTurnLanesandBike/PedImprovements(MaintoArrington)

MainSt ArringtonRd Widenroadwayfromfourtofivelaneswithbike/pedfacilites 9,830,624$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Hillsboro 10827 QuatamaRdTurnLanesandBike/PedGaps CorneliusPassRd 205thAve Widenroadwaytoaddcenterturnlaneandcompletemissingsidewalksandbikelanes

1,913,400$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Hillsboro 10830 JohnsonStTurnLanesandBike/PedImprovements

CenturyBlvd CorneliusPassRd Widenroadwaytoaddcenterturnlane,bikelanes,andsidewalks 8,504,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Hillsboro 10832 QuatamaRdImprovementsand69thAveExtension

CorneliusPassRd 69thAve WidenQuatamafromCorneliusPassRdto69thAveandconstructmissingsegmentof69thAvefromQuatamasouthasthree-laneroadwaywithbike/pedfacilities;upgradebridgeoverRockCreek

1,913,400$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Hillsboro 11090 CornellRdBikeLanes ArringtonRd 25thAve Widenroadwaytoaddbikelanes 5,038,620$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11141 BrogdenStExtensionandBike/PedImprovements

28thAve BrookwoodPkwy Extendroadwayfrom43rdAvetoBrookwood;widentoprovidebike/pedfacilitiesfrom28thtoBrookwood;newtrafficsignalatBrookwood

3,189,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 13of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

WashingtonCounty Hillsboro 11145 AirportRdBike/PedGaps BrookwoodPkwy 48thAve Completemissingbikelanesandsidewalk 1,594,500$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11149 HelvetiaRdTurnLanesandBike/PedImprovements

SchaafRd WestUnionRd Widenroadwaytothreelanes(onethroughlaneineachdirectionandcenterturnlane)withbike/pedfacilities

4,252,000$ 2028-2040 No RoadsandBridges

Servenewurbanarea

WashingtonCounty Hillsboro 11150 JacobsonRdTurnLanesandBike/PedImprovements

HelvetiaRd CenturyBlvd Widenroadwayfromtwotothreelanes(addcenterturnlane);completebike/pedfacilities;reconfigureintersectionwithHelvetiaRdtoright-in,right-outonly

2,657,500$ 2028-2040 No RoadsandBridges

Increasefreightaccesstoindust&intermodalfac

WashingtonCounty Hillsboro 11151 BentleyStBike/PedImprovements 32ndAve BrookwoodAve Constructsidewalksandbufferedbikelanes 3,189,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11155 DrakeStTurnLanesandBike/PedImprovements(East)

ImlayAve 67thAve Constructcenterturnlaneandaddbike/pedfacilities 1,913,400$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Hillsboro 11156 DrakeStTurnLanesandBike/PedImprovements(West)

BrookwoodAve ImlayAve Constructcenterturnlaneandaddbike/pedfacilities 1,594,500$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Hillsboro 11157 ImlayAveBike/PedImprovements TVHwy LoisSt Completesidewalkgapsandconstructbikelanes 2,126,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11158 206thAveBike/PedImprovements BaselineRd RockRd Completesidewalkgapsandconstructbikelanes 3,189,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11159 AlexanderStBike/PedImprovements BrookwoodAve 56thCt Completebikelaneandsidewalkgaps 1,063,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11160 WitchHazelRdBike/PedImprovements RiverRd BrookwoodAve Completebikelaneandsidewalkgaps 1,063,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11161 RoodBridgeRdBike/PedImprovements RiverRd PipersDr(UGB) Constructsidewalksandbikelanes 2,657,500$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11162 24thAveBike/PedImprovements MainSt MapleSt Widenroadwaytoprovidebike/pedfacilitiesincludingbridgeoverTurnerCreek

4,252,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11164 17thAveBike/PedImprovements CornellRd SunriseLn Widenroadwaytoprovidebike/pedfacilities 1,063,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11278 AmberGlen/NorthHillsboroStreetcar,Phase1

QuatamaMAXStation Proposed"EvergreenTransitCenter"(atEvergreen&194th)

ConstructhighcapacitytransitfromQuatamaMAXstationthroughAmberGlen/TanasbourneRegionalCenter;providelocalmatchfundingtoleveragefederalfundsforstreetcarextensionthroughAmberglen;continueworkaspartoftheHCTsystemexpansionpolicy;nextphasecorridorasidentifiedintheHCTsystemplanandadoptedbyJPACTandMetroCouncil;alsoseeproject11573

25,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

WashingtonCounty Hillsboro 11279 US26&185thAveInterchangeRefinementStudyandImplementation

N/A N/A Conductinterchangerefinementstudyandimplementation 26,575,000$ 2028-2040 No Throughways Relievefuturecongestion

WashingtonCounty Hillsboro 11280 RonlerDrExtension CorneliusPassRd 215thAve Constructthree-laneextensionwithbike/pedfacilities 1,000,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

WashingtonCounty Hillsboro 11282 MinterBridgeRdBike/PedImprovements RiverRd MorganRd(UGB) Completebike/pedfacilities 2,126,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11341 WestUnionRdWideningandImprovements HelvetiaRd CorneliusPassRd WidentothreelanesfromHelvetiatoCentury,andfivelanesfromCenturytoCorneliusPass,includingbike/pedfacilitiesalongentirelength

12,000,000$ 2028-2040 No RoadsandBridges

Servenewurbanarea

WashingtonCounty Hillsboro 11389 ImbrieDrWidening EvergreenPkwy CorneliusPassRd Widenfromthree(onewestbound,oneeastbound,onecenterturnlane)tofourlanes(onewestbound,twoeastbound,onecenterturnlane)throughadditionofoneeastboundlane

2,657,500$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty Hillsboro 11392 TVHwy&RiverRdIntersectionImprovements

N/A N/A Constructeastboundright-turnlaneandsecondnorthboundleft-turnlane;modifytrafficsignal;improvebikeandpedcrossingofTVHwy

2,126,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 14of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

WashingtonCounty Hillsboro 11573 AmberGlen/NorthHillsboroStreetcar,Phase2

Proposed"EvergreenTransitCenter"atEvergreen&194th

HillsboroStaduim,IntelRonlerAcres,OrencoStation

ExtendhighcapacitytransitfromAmberGlen/TanasbourneRegionalCentertoHillsborostadium,IntelRonlerAcres,andOrencoStation;providelocalmatchfundingtoleveragefederalfundsforLRTextension;continueworkaspartoftheHCTsystemexpansionpolicy;nextphasecorridorasidentifiedintheHCTsystemplanandadoptedbyJPACTandMetroCouncil;alsoseeproject11278

50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

WashingtonCounty Hillsboro 11912 SunsetHwyHighCapacityTransit SunsetTransitCenter FairComplex/HillsboroAirportMAXStation

StudyandimplementationofhighcapacitytransitfromSunsetTransitCentertoFairComplex/HillsboroAirportMAXStationviaUS26

50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

WashingtonCounty KingCity 11946 FisherRd.Extension RoyRogersRd. KingLearWy. Constructnew2laneCollectorRdwithsidewalksbikelanes,streetlightingandtrafficsignalsatkeyintersections

21,200,000$ 2028-2040 No RoadsandBridges

Servenewurbanarea

WashingtonCounty ODOT 11302 I-5/OR217InterchangePhase2 I-5/OR217Interchange N/A I-5/OR217InterchangePhase2-southboundOR217tosouthboundI-5entranceramp;southboundI-5exittoKruseWayloopramp.

53,000,000$ 2028-2040 No Throughways Relievecurrentcongestion

WashingtonCounty ODOT 11582 OR217CapacityImprovements US26(SunsetHwy) I-5 Constructasa6-lanefreeway,adding3rdthroughlaneineachdirection,andcompleteinterchangereconstructionwithrampandovercrossingimprovements

398,500,000$ 2028-2040 No Throughways Relievecurrentcongestion

WashingtonCounty ODOT 11976 OR217NorthboundAuxiliaryLaneExtensionSchollsFerrytoAllen/Denney

SchollsFerryRoad Allen/DenneyInterchange

ExtendOR217auxiliarylanefromSchollsFerrytoAllen/Denneyinterchangebyfillingintheexistingauxiliarylaneandmodifyingrelatedrampconnections

50,000,000$ 2028-2040 No Throughways Increasesystemefficiency

WashingtonCounty ODOT 11978 OR217Interchange,Safety,andOperationalImprovements

US26(SunsetHighway) I-5 DesignandconstructimprovementstoOR217betweenUS26andAllen/Denneyinterchangetoimprovesafety,reliabilityandmobility

75,000,000$ 2028-2040 No Throughways Increasesystemefficiency

WashingtonCounty Sherwood 10684 CedarBrookWay 99W ElwertRd ConstructcollectorstatusroadbetweenSWElwertRd@intersectionwithSWHandleyStandSWPacificHwy(OR99W).

6,000,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty Sherwood 10689 OldTownArterials-Collectors SW3rdSt SWWillametteSt CompletearterialsandcollectorstreetswithinoldtownoverlayperCityTSP.

5,800,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Sherwood 10698 SunsetBlvd. SWAldergroveAve SWEucalyptusLane Reconstructroadto3lanearterialstandardsinsectionsnotalreadytoTSPsectionforarterial.FixverticalcrestsightdistanceissueatPineStintersection.PossiblesignalorroundaboutatSunset/Main/LaddHillandcompletestreetstowestofSWMainSt.

8,300,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Sherwood 10700 ArrowStreetImprovements SWLangerFarmsParkway

SWGerdaLane Construct3-lanecollectorstreettoTSPstandardsbetweenSWLangerFarmsParkwayandSWGerdaLane.

8,200,000$ 2028-2040 No RoadsandBridges

Linklandusewithtransportationinvestments

WashingtonCounty Sherwood 10703 PedestrianLinkstoSchools&TownCenter Various various Pedestrianupgrades,newsidewalks,sidewalkinfillat:Sunset,Division,Edy,Elwert,Meinecke,Pine,Roy,LaddHill,Timbrel,Washington,Willamette,OldPacificHwy.

7,300,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty Sherwood 10707 OR99WRegionalTrailCrossing SWPacificHwy.(westside)

SWPacificHwy.(eastside)

ConstructsseparatedgradecrossingforCedarCreekTrail(regionaltrailsystem)underSWPacificHwy(OR99W).The$15.9Mcostestimateincludesraisinghighwaygradestoprovideforopenundercrossingcoupledwithstreamenhancementstocreateamoreopenandnaturalundercrossingw/adjacentnaturalstream.Thiswillimprovedownstreamconveyanceduringlargestormevents,aswellasconnectwildlifecorridorscurrentlybisectedbySWPacificHighway.

15,900,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty Sherwood 11614 PineStPhase2 SWDivisionSt SWSunsetBlvd ReconstructSWPineSttothe2-lanecollectorstandardperCityTSP.Existingstreetis2-lanesw/non-ADAcompliantsidewalksandthisprojectwillimprovestormdrainageandaddressADAissues,butnotaddanycapacityincreasingfeatures(i.e.notravelorturnlanesadded,nobikelanes,nomajorsidewalkadditions).

2,100,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Sherwood 11660 Century-LangerIntersectionImprovements CenturyDr LangerDr Improveintersectioncapacityandsafety.PossibleroundaboutatCenturyDr.RestrictLangermovementstoright-in/right-out,possibleEBleft-in.InTSP.CanbecombinedwithRTP10691.

2,100,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

WashingtonCounty THPRD 10809 BronsonCreekTrail(Community) BronsonCreekParkCornellRd.(THPRD)

NWLaidlawRd.atNWSaltzmanRd.

Todesignandconstructacommunitytrailsegmentinagreenwaycorridor,10'widepaved.

8,682,500$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 15of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

WashingtonCounty THPRD 11406 FannoCreekTrailBridge(Regional) northsideofHallBlvd. southsideofHallBlvd. Wouldavoidout-of-directionbike/pedtripsonamajorregionaltrailthatisotherwisecompleteinthisarea.

5,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty THPRD 11941 TurftoSurfRegionalTrail SW194thAve/T.V.Hwy BeavertonCreekTrailatSWEricksonAve.

Designandconstructaregionalmulti-usetrail,12'-14'wide 12,500,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty THPRD 11942 WaterhouseCommunityTrailConnection,Segment9

THPRDboundary SWSpringvilleRd.justwestofSickleTerr.

Designandconstructa10'widecommunitymulti-usetrailtoconnectNorthBethanyresidentstoWestsideandRockCreekRegionalTrails.

2,325,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty THPRD 11944 SouthCooperLoopTrail SWGrabhornRd.justnorthofSchollsFerryRd.

SW175thAve Designandconstructa12'wideregionalmulti-usetrail. 13,200,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty Tigard 10747 OR217Bike/PedOvercrossing-CascadePlaza

NimbusorCascade SchollsFerry Newpedestrianandbicyclebridgerunningeast/westoverHwy217fromNimbusorCascadetoSchollsFerryRoad(eastof217)onthenorthsideofWashingtonSquareRegionalCenter.

3,700,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty Tigard 10756 72ndAve.Improvements-HunzikertoBonita HunzikerRoad BonitaRoad Widento3laneswithbikewaysandsidewalks 12,800,000$ 2028-2040 No ActiveTransportation

Increaseaccesstojobs

WashingtonCounty Tigard 10757 72ndAve.Improvements-BonitatoDurham BonitaRoad DurhamRoad Widento3laneswithbikewaysandsidewalks 6,400,000$ 2028-2040 No ActiveTransportation

Increaseaccesstojobs

WashingtonCounty Tigard 10768 DurhamRd/UpperBoonesFerryIntersectionImprovements

DurhamRoad I-5 ConstructintersectionimprovementsatDurhamRoadandUpperBoonesFerryRoadtoprovidedualsouthboundright-turns,dualeastboundleft-turns,eastboundright-turns,existingandimprovesignaltiming.InstallbikelanesonbothsidesofthestreetsfromjustsouthofDurhamRdtojustnorthofDurhamRd.

5,000,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

WashingtonCounty Tigard 10770 OR99WIntersectionImprovements(PE) 64thAve. DurhamRd. Projectdevelopmentphase:Provideincreasedcapacityatpriorityintersections,includingbusqueuebypasslanesinsomelocations,improvedsidewalks,prioritypedestriancrossings,andanaccessmanagementplan,whileretainingexisting4/5-lanefacilityfromI-5toDurhamRoad.See2035TigardTSPProject#66forspecificimprovements.

5,000,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

WashingtonCounty Tigard 11225 DowntownCirculationPlanImplementation DowntownTigard BetweenHwy.99W,Hall&FannoCreek

AcquireROW,constructstreetsandstreetscapeimprovementsindowntownTigard

4,300,000$ 2028-2040 No RoadsandBridges

Increaseaccesstoopport.forhist.marg.comm.

WashingtonCounty Tigard 11666 OR99WIntersectionImprovements(CON) 64thAve. DurhamRd. Constructionphase:Provideincreasedcapacityatpriorityintersections,includingbusqueuebypasslanesinsomelocations,improvedsidewalks,prioritypedestriancrossings,andanaccessmanagementplan,whileretainingexisting4/5-lanefacilityfromI-5toDurhamRoad.See2035TigardTSPProject#66forspecificimprovements.

25,000,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

WashingtonCounty Tigard 12015 OR217Ped/BikeOvercrossing-NDakotatoPfaffle

NorthDakotaat217 HallBlvdnearoratPfaffle

Pfaffle-NorthDakotaeast-westconnectionwithHwy217ped/bikeover-crossingtoprovideaneighborhoodroute

5,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty Tigard 12041 OR217Ped/BikeOvercrossing-WashSqRegionalCenter

LocustSt CascadeAve,NimbusAve,orFannoCreekTrail

ProvidePed/bikebridgeoverHwy217fromWashingtonSquareRegionalCenterfromLocustSttoCascadeAve,NimbusAve,orFannoCreekRegionalTrail

5,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty TriMet 10900 HCT:WESDoubleTrackingandFrequencyUpgrades

BeavertonTransitCenter Wilsonville CommuterRailfrequencyandspanofserviceimprovements.WillrequirecapitalimprovementsincludingdoubletrackingandDMUs.

400,000,000$ 2028-2040 No Transit Relievefuturecongestion

WashingtonCounty Tualatin 10712 BoonesFerry Martinazzi LowerBoonesFerry Reconstruction/widento5-lanesfromMartinazzitoLowerBoonesFerryRoad,includeswideningbridgeoverTualatinRiver.

18,940,534$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

WashingtonCounty Tualatin 10717 CipoleStreetReconstruction OR99W Tualatin-Sherwood Reconstruct/widento3lanesfrom99WtoTualatin-SherwoodRoadandincludeshared-usepathfortheIceAgeTonquinTrail,includessignalatCipoleandHerman.TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.

21,291,890$ 2028-2040 No RoadsandBridges

Increaseaccesstojobs

WashingtonCounty Tualatin 10739 Nyberg Tualatin-Sherwood 65th AddbikelanesonNybergfromI-5to65th. 7,441,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 16of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

WashingtonCounty Tualatin 10742 108thAve. TualatinRiverGreenwayTrail-SouthBankoftheTualatinRiver

TualatinRiverGreenwayTrail-NorthBankoftheTualatinRiver

PedestrianbridgeoverTualatinRiverandconnectingpaths. 2,587,342$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Tualatin 10743 OR99WSidewalks SouthCityLimits NorthCityLimits InstallsidewalksfromCipoletoTualatinRiver. 11,055,200$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Tualatin 11420 Nyberg I-5on-ramp I-5on-ramp Addanadditionalon-ramplaneforvehiclestravelingwestboundonSWNybergStreettoI-5northbound(northeastquadrantoftheNybergInterchange).Reducethepedestrianislandandimproveilluminationtoenhancesafety.

1,138,473$ 2028-2040 No Throughways Relievecurrentcongestion

WashingtonCounty Tualatin 11427 IceAgeTonquinTrail 112th Tualatin/BoonesFerry Constructshared-usepath 24,135,415$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Tualatin 11429 Sagert I-5 I-5 AddsidewalksonI-5bridgeoverpass 5,673,203$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Tualatin 11432 I-5Path LowerBoonesFerryRoad Norwood Constructshared-usepathparalleltoI-5 3,449,435$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty WashingtonCounty 10557 Murray/TVHwy.Intersection FarmingtonRd. TVHwy. IntersectionimprovementatTVHwy.andFarmingtonwithMurrayBlvd. 26,600,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

WashingtonCounty WashingtonCounty 10572 BarnesRd.Improvements St.Vincent'sHosp.entrance

LeahyRd. Widenfromtwotofivelaneswithbikelanesandsidewalks. 9,500,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

WashingtonCounty WashingtonCounty 10573 BarnesRd.Improvements LeahyRd. Multnomah.Co.Line Widenfromtwotothreelaneswithbikelanesandsidewalks. 18,400,000$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 10580 ButnerRd.Improvements MurrayBlvd. CedarHillsBlvd. Widento3laneswithbikelanesandsidewalks. 19,700,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 10586 197th/198thAve.Improvements BaselineRd. T.V.Hwy. Addsidewalks,bikelanes,lighting,turnlanesatmajorintersections. 20,500,000$ 2028-2040 No ActiveTransportation

Relievefuturecongestion

WashingtonCounty WashingtonCounty 10589 95thAve.Ped/BikeConnection MorrisonSt. SunsetTC Pedestrian/bicyclepathway,lighting,bridgeoverJohnsonCreek,grade-separatedcrossingofBarnesRoad.

12,300,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 10591 GlencoeRd.Improvements EvergreenRd. JacksonAve. Widentothreelaneswithbikelanesandsidewalks. 27,700,000$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 10593 KinnamanRd.Improvements 209thAve. FarmingtonRd. Reconstructwithsidewalks,bikelanesandturnlanesatmajorintersecions;consolidateoffsetintersectionat198thAve.

28,500,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty WashingtonCounty 10596 SchollsFerryRd.Improvements Hwy.217 121stAve. Widentosevenlaneswithbikelanesandsidewalks. 21,000,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

WashingtonCounty WashingtonCounty 10598 SouthernArterial Hwy.99W I-5 PurchaseROW.Construct2/3lanearterialwithbikelanesandsidewalks. 116,000,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 10599 OR217/72ndAve.InterchangeImprovements

OR217/72ndAvenue OR217/72ndAvenue Completeinterchangereconstructionwithadditionalrampsandbridgestructurereplacement

21,300,000$ 2028-2040 No Throughways Relievefuturecongestion

WashingtonCounty WashingtonCounty 10606 WashingtonSquareRegionalCenterPedestrianImprovements

Wash.Sq.RegionalCenter

Complete7400feetofsidewalkimprovements. 9,500,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 10607 SunsetTCStationCommunityPedestrianImprovements

SunsetTCStationCommunity

Sidewalks,pedestriancrossings,accessways,ped/bikebridgesovercreeks.

6,400,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 10614 ButnerRd.Bike CedarHillsBlvd. ParkWay Completes7800feetofbikelanestotransitcorridor. 3,700,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 10615 BronsonRd.BikeLanes 185thAve. BethanyBlvd. Completes15000feetofbikelanestotransitcorridor. 5,800,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 11045 185thAvenue/MAXGradeSeparation 185thAvenue BaselineRoad Gradeseparate185thAvenue/BaselineRoadintersectionandMAXline. 26,256,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

WashingtonCounty WashingtonCounty 11436 East-WestArterialOvercrossing BoonesFerryRd EastofI-5 Extendnew4-laneovercrossingoverI-5fromBoonesFerryRdto65thandStaffordRd.

40,400,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 17of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

WashingtonCounty WashingtonCounty 11446 WashingtonCountyITS/TSMO(Strategic) County-wide County-wide Conductprojectdevelopment,preliminary/systemengineering,design,construct,andintegratethefollowingITSprojectsCountywideonkeyfreight,transit,andcommutercorridors:AdvancedTrafficControllers,Next-GenerationEmergencyVehiclePreemption&TransitSignalPriority,TrafficSignalModernization,RoadsideConnectedVehicle&InternetofThingsSystem,AutonomousVehicleEnablingSystems,AutomatedTrafficSignalPerformanceSystem,TrafficIncidentManagement

16,000,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

WashingtonCounty WashingtonCounty 11456 ShackelfordRd 185thAve. Bridge Buildnew3laneroadwithbike/pedfacilities,stormdrainage,streetlightingtoserveNorthBethany.

12,800,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11457 ShackelfordRdBridge Buildnew3laneroadwithbike/pedfacilities,stormdrainage,streetlightingtoserveNorthBethany

15,600,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11460 OR10:OlesonRd.ImprovementPh.2 Beaverton-HiilsdaleHwy. OlesonRd.andSchollsFerry

Beaverton-Hillsdale/Oleson/SchollsFerryPhase2improvementstoproject10545

40,000,000$ 2028-2040 No RoadsandBridges

Reducecrashes

WashingtonCounty WashingtonCounty 11466 LaidlawImprovements SkycrestPkwy. LakeviewDr. Straightencurves,widento3laneswithbikelanesandsidewalks. 10,600,000$ 2028-2040 No RoadsandBridges

Reducecrashes

WashingtonCounty WashingtonCounty 11469 124thAveImprovements Tualatin-SherwoodRd. GrahamsFerryRd Widen124thfrom2lanesto5laneswithbikelanesandsidewalks 14,900,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11472 160thAveImprovements TVHwy. FarmingtonRd. Widentothreelaneswithbikelanesandsidewalks. 15,900,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

WashingtonCounty WashingtonCounty 11473 111th/RainmontRd/113thAve McDanielRd CornellRd. Constructsidewalks 9,600,000$ 2028-2040 No ActiveTransportation

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11474 113thAve McDanielRd RainmontRd Constructnew2laneCollectorRdwithsidewalksbikelanesandstreetlighting

6,400,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11478 185th ShackelfordRd. SpringvilleRd. Widenfromtwolanestothreelaneswithbikelanesandsidewalks. 60,600,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11490 DayRdOvercrossing BoonesFerryRd ElligsenRd Extendnew4-laneovercrossingoverI-5fromBoonesFerryRdtoElligsenRd.

46,900,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11574 CornellRoad 107th CountyLine Widenfrom2tothreelaneswithsidewalks,bikelanes,streetlighting,andcommunityfeatures

22,300,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty WashingtonCounty 11575 Leahy CornellRd. BarnesRd. Constructsidewalks 2,700,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 11576 BullMountainRd RoyRogersRd. OR99W Widentothreelaneswithbikelanesandsidewalks. 36,100,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11577 BeefBendRd RoyRogers HWY99W Widentothreelaneswithbikelanesandsidewalks. 41,900,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11578 80thAve OlesonRd OakSt Addsidewalks,bikelanes,lighting,turnlanesatmajorintersections. 13,800,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 11579 119thAve McDanielRd CornellRd. Addsidewalks,bikelanes,lighting,turnlanesatmajorintersections. 12,800,000$ 2028-2040 No ActiveTransportation

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11580 McDanielRd 119thAve. CountyLine Addsidewalks,bikelanes,lighting,turnlanesatmajorintersections. 22,300,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty WashingtonCounty 11737 Cornell@185thIntersectionImprovements 185thAve. CornellRd Prioritizenear-termimprovementssuchassignaltiming,transitprioritization,trafficoperations,monitoring,andspecificturnlaneconfigurations.Intersectionimprovements(and/orotherreasonablereplacementimprovements)aretobeimplementedandprioritizedasfundingallows.If,aftersuchimprovementshavebeenconsideredandmotorvehicletrafficcongestionbecomesunacceptable,thentheseintersectionscouldbeconsideredascandidatesforgradeseparationand/orotherimprovementstomeettravelneeds.

22,300,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 18of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

WashingtonCounty WashingtonCounty 11738 Walker@185thIntersectionImprovements 185thAve. WalkerRd. Prioritizenear-termimprovementssuchassignaltiming,transitprioritization,trafficoperations,monitoring,andspecificturnlaneconfigurations.Intersectionimprovements(and/orotherreasonablereplacementimprovements)aretobeimplementedandprioritizedasfundingallows.If,aftersuchimprovementshavebeenconsideredandmotorvehicletrafficcongestionbecomesunacceptable,thentheseintersectionscouldbeconsideredascandidatesforgradeseparationand/orotherimprovementstomeettravelneeds.

22,300,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11923 GrahamsFerryRoad(HeleniustoTonquin) HeleniusSt TonquinRd Widenroadwayto3lanes,includessidewalksandbikelanes 4,000,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty WashingtonCounty 11924 GrahamsFerryRoad(TonquintoDay) TonquinRd. DayRd. Widenroadwayto5lanes,includessidewalksandbikelanes 6,000,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11925 Beaverton-HillsdaleHwyBikeLanes OR217 MultnomahCountyLine Completes12,000feetofbikelanes. 2,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 11926 CanyonRoadand110thBikeLanes Beaverton-HillsdaleHwy. 91stAve Completes7,000feetofbikelanes. 2,500,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 11927 ShawStreetMulti-UseTrailOverpass 185thAve 185thAve Designandconstructamulti-useregionaltrail10-12ftwideover-crossingof185thAve

5,100,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 11930 BrookmanRd OR99W LaddHillRd Widento4/5lanearterialstandard 20,000,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11970 TransitPriorityonFrequentServiceRoutes County-wide County-wide Providequeuejumps,signalpreemptionforfrequentserviceroutes 50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 12039 Bikelanesandsidewalksoncollectorsandarterials

Countywide Countywide Complete35milesofbikelanesandsidewalksonCountyarterialsandcollectors

220,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 12049 WashingtonCountyNeighborhoodBikeways WashingtonCounty WashingtonCounty 3milesofneighborhoodbikeways(bikeboulevards)onlow-trafficstreetsthroughoutunincorporatedurbanWashingtonCounty,includingenhancedat-gradecrossingsofarterials.

2,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty Wilsonville 11798 ElligsenRoadUrbanUpgrade ParkwayCenterDrive 65th Reconstructstreetto3laneswithbufferedbikelanesandsidewalks.(TSPprojectUU-P3)

6,000,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Wilsonville 11809 JavaRoadConnectionandSignal GrahamsFerryRoad GardenAcresRoad ConstructnewJavaRoadwithbufferedbikelanesandsidewalks,disconnectClutterStreetfromGrahamsFerryRoad,andinstalltrafficsignalatGrahamsFerryRoad.

1,500,000$ 2028-2040 No RoadsandBridges

Increaseaccesstojobs

Recommended