2018 Regional Transportation Plan DRAFT Additional Strategic Priorities Project List Projects are listed alphabetically by County and nominating agency. Downloaded from RTP Project Hub on 10/17/17. 1 of 18 For more information, visit the 2018 RTP project page at oregonmetro.gov/2018projects. County Nominating Agency 2018 RTP ID Project Name Start Location End Location Description Estimated Cost (2016 dollars) Time Period Project is on Financially Constrained project list RTP Investment Category Primary Purpose Clackamas County Clackamas County 10001 Johnson Creek Blvd. Interchange Improvements JCB/I-205 interchange N/A Add loop ramp and northbound on-ramp; realign southbound off-ramp and install dual right-turn lanes. 10,417,400 $ 2028-2040 No Roads and Bridges Relieve current congestion Clackamas County Clackamas County 10003 Harmony Road Improvements Linwood Ave Fuller Rd Add Bikelanes and Sidewalks where needed, including safety treatments at intersections and ADA accessibility improvements as necessary. 5,315,000 $ 2028-2040 No Active Transportation Increase travel options/alt. to driving alone Clackamas County Clackamas County 10023 82nd Dr. Improvements Hwy 212 Strawberry Lane Intersection Widen to a consistent 4 lane cross section and include bike/ped improvement and ADA accessibility improvements as necessary. Not including intersection improvements at Strawberry Lane. 18,521,712 $ 2028-2040 No Roads and Bridges Relieve current congestion Clackamas County Clackamas County 10043 Borland Rd from Tualatin to Stafford Rd Tualatin City Limits Stafford Rd Add paved shoulders and turn lanes at major intersections. 6,037,840 $ 2028-2040 No Active Transportation Increase travel options/alt. to driving alone Clackamas County Clackamas County 10057 Redland Road Abernethy Road UGB Improve Redland Road to urban standards, adding left turn lanes at major intersections, upgrading two bridges and completing sidewalk gaps on west/south side between Abernethy and Anchor Way, north side between Anchor and Livesay, and both sides from Livesay to the UGB (Oregon City TSP Projects D91, W7, W17, W18). 13,091,908 $ 2028-2040 No Roads and Bridges Increase system efficiency Clackamas County Clackamas County 11491 Flavel Dr Alberta Ave County boundary Add bikeways to provide connection between Springwater/Powerline trail and bike facilities on Flavel Dr and 52nd Ave in Portland. 2,561,830 $ 2028-2040 No Active Transportation Increase travel options/alt. to driving alone Clackamas County Clackamas County 11517 Jennings Ave Oatfield Road Webster Road Widen to 2-lane urban minor arterial standard with bikeway and pedestrian facilities infill 14,180,420 $ 2028-2040 No Active Transportation Increase travel options/alt. to driving alone Clackamas County Clackamas County 11518 Webster Rd OR 224 Gladstone Fill gaps in bikeways and pedestrian facilities, improve access to school, provide bike/ped safety treatments at key intersections and improve ADA accessibility. 20,207,630 $ 2028-2040 No Active Transportation Increase travel options/alt. to driving alone Clackamas County Clackamas County 11522 97th Ave / Mather Rd Lawnfield Rd Summers Lane Add bikeways, pedways along project length, add eastbound left turn lanes at Mather Rd / Summers Ln, provide ADA accessibility improvements as necessary. 4,847,280 $ 2028-2040 No Active Transportation Increase travel options/alt. to driving alone Clackamas County Clackamas County 11618 Borland Rd from Stafford Rd to West Linn City Limits Stafford Rd West Linn City Limits Add paved shoulders. The project or a portion of the project is outside the designated urban growth boundary as of March 2014. 10,661,890 $ 2028-2040 No Active Transportation Increase travel options/alt. to driving alone Clackamas County Clackamas County 11668 Sunrise Multi- use path Phase II 122nd Ave Rock Creek Junction Construct new mullti use path from 122nd Ave to 172nd paralleling the Sunrise project. 6,378,000 $ 2028-2040 No Active Transportation Increase travel options/alt. to driving alone Clackamas County Clackamas County 11670 OR 212 widening to 5 lane boulevard 172nd East of Damascus town center (intersection with 222nd Ave) Widen Highway 212 to a 5 lane boulevard section from 172nd through Damascus town center including intersection improvements at Foster Rd, safety improvements at major crossing points for bicyclists and pedestrians, and ADA accessibility improvements as necessary. 24,500,000 $ 2028-2040 No Roads and Bridges Relieve current congestion Clackamas County Clackamas County 11766 Johnson Creek/Linwood Ave ITS Improvements Johnson Creek Blvd/Linewood Ave Intersection NA Add intelligent transportation system improvements at the intersection of Johnson Creek Blvd and Linwood Ave to provide warnings and special phasing for bicyclists and pedestrians. Include ADA accessibility improvements as necessary. 1,000,000 $ 2028-2040 No TSMO/TDM/TOD Reduce fatal and severe injury crashes Clackamas County Clackamas County 11768 Strawberry Lane/I-205 Overpass Widening (TSAP) Cason Drive 82nd Drive Replace existing Strawberry Lane overpass over I-205 to provide sufficient width to include bicycle and pedestrian facilities with appropriate ADA accessibility improvements. 6,000,000 $ 2028-2040 No Roads and Bridges Reduce fatal and severe injury crashes Clackamas County Clackamas County 11769 Rusk Rd Bike/Ped Improvements (TSAP) Aldercrest Road OR 224 Provide bicycle and pedestrian improvements on Rusk Road between Aldercrest Rd and OR 224 to improve safety, fill an important system gap and provide ADA accessibility improvements as needed. 1,000,000 $ 2028-2040 No Active Transportation Reduce fatal and severe injury crashes Clackamas County Clackamas County 11772 Clackamas Industrial Area Bike/Ped Improvements (TSAP) Intersection of 106th Ave and OR 212 Intersection of Jennifer Rd and 122nd Ave Improve intersection of 106th and OR 212, and Jennifer Drive and 122nd Ave to facilitate bike and pedestrian safety and provide ADA accessibility improvements as needed. Also improve intersection geometry to facilitate truck access to industrial park. 2,000,000 $ 2028-2040 No Active Transportation Increase access to opport. for hist. marg. comm. Clackamas County Clackamas County 11774 Johnson Creek Blvd and Bell Ave Intersection Safety Improvements (TSAP) Johnson Creek Blvd/Bell Ave intersection NA Improve design of the intersection of Johnson Creek Blvd and Bell Ave to improve intersection safety for bicyclist and pedestrians and improve ADA accessibility. No change in intersection capacity. 1,500,000 $ 2028-2040 No Active Transportation Reduce fatal and severe injury crashes

2018 Regional Transportation Plan DRAFT Additional

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 1of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

ClackamasCounty ClackamasCounty 10001 JohnsonCreekBlvd.InterchangeImprovements

JCB/I-205interchange N/A Addlooprampandnorthboundon-ramp;realignsouthboundoff-rampandinstalldualright-turnlanes.

10,417,400$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

ClackamasCounty ClackamasCounty 10003 HarmonyRoadImprovements LinwoodAve FullerRd AddBikelanesandSidewalkswhereneeded,includingsafetytreatmentsatintersectionsandADAaccessibilityimprovementsasnecessary.

5,315,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 10023 82ndDr.Improvements Hwy212 StrawberryLaneIntersection

Widentoaconsistent4lanecrosssectionandincludebike/pedimprovementandADAaccessibilityimprovementsasnecessary.NotincludingintersectionimprovementsatStrawberryLane.

18,521,712$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

ClackamasCounty ClackamasCounty 10043 BorlandRdfromTualatintoStaffordRd TualatinCityLimits StaffordRd Addpavedshouldersandturnlanesatmajorintersections. 6,037,840$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 10057 RedlandRoad AbernethyRoad UGB ImproveRedlandRoadtourbanstandards,addingleftturnlanesatmajorintersections,upgradingtwobridgesandcompletingsidewalkgapsonwest/southsidebetweenAbernethyandAnchorWay,northsidebetweenAnchorandLivesay,andbothsidesfromLivesaytotheUGB(OregonCityTSPProjectsD91,W7,W17,W18).

13,091,908$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

ClackamasCounty ClackamasCounty 11491 FlavelDr AlbertaAve Countyboundary AddbikewaystoprovideconnectionbetweenSpringwater/PowerlinetrailandbikefacilitiesonFlavelDrand52ndAveinPortland.

2,561,830$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 11517 JenningsAve OatfieldRoad WebsterRoad Widento2-laneurbanminorarterialstandardwithbikewayandpedestrianfacilitiesinfill

14,180,420$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 11518 WebsterRd OR224 Gladstone Fillgapsinbikewaysandpedestrianfacilities,improveaccesstoschool,providebike/pedsafetytreatmentsatkeyintersectionsandimproveADAaccessibility.

20,207,630$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 11522 97thAve/MatherRd LawnfieldRd SummersLane Addbikeways,pedwaysalongprojectlength,addeastboundleftturnlanesatMatherRd/SummersLn,provideADAaccessibilityimprovementsasnecessary.

4,847,280$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 11618 BorlandRdfromStaffordRdtoWestLinnCityLimits

StaffordRd WestLinnCityLimits Addpavedshoulders.TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.

10,661,890$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 11668 SunriseMulti-usepathPhaseII 122ndAve RockCreekJunction Constructnewmulltiusepathfrom122ndAveto172ndparallelingtheSunriseproject.

6,378,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 11670 OR212wideningto5laneboulevard 172nd EastofDamascustowncenter(intersectionwith222ndAve)

WidenHighway212toa5laneboulevardsectionfrom172ndthroughDamascustowncenterincludingintersectionimprovementsatFosterRd,safetyimprovementsatmajorcrossingpointsforbicyclistsandpedestrians,andADAaccessibilityimprovementsasnecessary.

24,500,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

ClackamasCounty ClackamasCounty 11766 JohnsonCreek/LinwoodAveITSImprovements

JohnsonCreekBlvd/LinewoodAveIntersection

NA AddintelligenttransportationsystemimprovementsattheintersectionofJohnsonCreekBlvdandLinwoodAvetoprovidewarningsandspecialphasingforbicyclistsandpedestrians.IncludeADAaccessibilityimprovementsasnecessary.

1,000,000$ 2028-2040 No TSMO/TDM/TOD Reducefatalandsevereinjurycrashes

ClackamasCounty ClackamasCounty 11768 StrawberryLane/I-205OverpassWidening(TSAP)

CasonDrive 82ndDrive ReplaceexistingStrawberryLaneoverpassoverI-205toprovidesufficientwidthtoincludebicycleandpedestrianfacilitieswithappropriateADAaccessibilityimprovements.

6,000,000$ 2028-2040 No RoadsandBridges

Reducefatalandsevereinjurycrashes

ClackamasCounty ClackamasCounty 11769 RuskRdBike/PedImprovements(TSAP) AldercrestRoad OR224 ProvidebicycleandpedestrianimprovementsonRuskRoadbetweenAldercrestRdandOR224toimprovesafety,fillanimportantsystemgapandprovideADAaccessibilityimprovementsasneeded.

1,000,000$ 2028-2040 No ActiveTransportation

Reducefatalandsevereinjurycrashes

ClackamasCounty ClackamasCounty 11772 ClackamasIndustrialAreaBike/PedImprovements(TSAP)

Intersectionof106thAveandOR212

IntersectionofJenniferRdand122ndAve

Improveintersectionof106thandOR212,andJenniferDriveand122ndAvetofacilitatebikeandpedestriansafetyandprovideADAaccessibilityimprovementsasneeded.Alsoimproveintersectiongeometrytofacilitatetruckaccesstoindustrialpark.

2,000,000$ 2028-2040 No ActiveTransportation

Increaseaccesstoopport.forhist.marg.comm.

ClackamasCounty ClackamasCounty 11774 JohnsonCreekBlvdandBellAveIntersectionSafetyImprovements(TSAP)

JohnsonCreekBlvd/BellAveintersection

NA ImprovedesignoftheintersectionofJohnsonCreekBlvdandBellAvetoimproveintersectionsafetyforbicyclistandpedestriansandimproveADAaccessibility.Nochangeinintersectioncapacity.

1,500,000$ 2028-2040 No ActiveTransportation

Reducefatalandsevereinjurycrashes

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 2of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

ClackamasCounty ClackamasCounty 11937 McLoughlinBlvdHCTproject TriMetOrangeLinestationatParkAve.

DowntownOregonCityinthevicinityoftheexistingtransitcenter.

ExtendshighcapacitytransitfromthecurrentOrangeLineendatParkAvenuetodowntownOregonCity.

23,300,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

ClackamasCounty ClackamasCounty 11938 172ndAvenueFrequentTransit Intersectionof172ndAveandOR212

Intersectionof190thAveandFosterRd.

Newbustransitprovidingfrequentserviceon172nd/190thbetweenOR212andFosterRdinMultnomahCo.

23,300,000$ 2028-2040 No Transit Relievefuturecongestion

ClackamasCounty Gladstone 11887 TrolleyTrailBridgePhase2 PortlandAve,Gladstone ClackamasRiverTrail,OregonCity

SecondphaseofconstructionoftheTrolleyTrailBridgeacrosstheClackamasRiverfromGladstonetoOregonCity.

4,538,623$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty HappyValley 10035 UpperFosterRd.Improvements CountyLine 172nd190thConnector Widentwo-laneminorarterialfromthecountylinetothe172nd/190thconnector,toincludecontinuousleftturnlane,sidewalksandbikelanes.ProjectSegmentLength4,500feet.

6,271,700$ 2028-2040 No RoadsandBridges

Increaseaccesstojobs

ClackamasCounty HappyValley 10036 145thAve. ClatsopSt. MonnerRd. Widen145thAvetoincludecontinuousleftturnlane,sidewalkandbikelaneinfill.Trafficsignalorroundaboutwillbeaddedtomitigatemodalconflict.Projectprovidessaferoutebetweenresidentialandrecreationallanduses.

8,300,000$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

ClackamasCounty HappyValley 10045 ClatsopSt. 132ndAve. 162ndAve. Widenroadto3lanes,withcontinuousleftturnlane,sidewalks,bikelanes,andtrafficsignalstomitigatemultimodalconflicts.Projectimprovesaccesstoindustrialandemploymentcenter;completessegmentofMt.Scott/ScouterMt.Loop.

8,291,400$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

ClackamasCounty HappyValley 10060 SE132ndAve. ClatsopRd. KingRd. Widenexistingfacilitytothreelanes,accommodatingcontinuousleftturnlane,sidewalksandbikelanes.

4,900,000$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

ClackamasCounty HappyValley 10061 142ndAve. SunnysideRd. TerritoryDr. Widen142ndAvetoincludecontinuousleftturnlane,sidewalksandbikelanestomitigatemodal/sight-distanceconflictsonminorarterial;createssafeconnectionfromcommercial,multifamilyandsubdivisiondevelopmentstoindustrialsector.

11,027,569$ 2028-2040 No RoadsandBridges

Increaseaccesstojobs

ClackamasCounty HappyValley 10082 Mt.ScottBlvd./KingRd.Improvements HappyValleyCityLimits 145thAve. WidenMt.ScottBlvd.andKingRd.facilitiestothreelanes,withcontinuousleftturnlane,sidewalksandbikelanes.Trafficsignalsorroundaboutswillbeinstalledtomitigatemultimodalconflicts.

22,131,660$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

ClackamasCounty HappyValley 10538 Sager 162nd Foster Usingexistingalignment,widenandextendruralroadwaytothreelanes,includingcontinuousleftturnlane,bikelanesandsidewalkstoprovidedirectconnecttoemploymentlands.Projectwillsignalizecorridorat172ndAve.

16,795,400$ 2028-2040 No RoadsandBridges

Servenewurbanarea

ClackamasCounty HappyValley 11271 MistyDrive 162ndAve. 177thAve. Constructnew3laneroadwithcontinuousleftturnlane,sidewalks,bikelanes,trafficsignalsandbridgeoverRockCreek.Projectlocationimprovesaccesstogovernmentservices,urbanandemploymentcenters.

29,604,550$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

ClackamasCounty HappyValley 11508 HubbardRd 122ndAve 132ndAve FillgapsinpedestrianfacilitiesandimproveADAfacilitiesasneeded. 1,753,950$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty HappyValley 11511 StevensRd/StevensWay IdlemanRd CauseyAve Constructsidewalkinfilltocompletesystemgap;constructoptionaltrafficcalmingtominimizemodalconflict.

4,466,050$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty HappyValley 11529 ArmstrongExtension 162ndAve 172ndAve Constructnew,3laneroadwayextensionbetween172ndand190thAve,incorporatingbikelanes,sidewalks,andcontinuousleftturnlane.Projectbisectsindustrialcampusandemploymentcenter.

15,200,900$ 2028-2040 No RoadsandBridges

Increaseaccesstojobs

ClackamasCounty HappyValley 11530 TrogeExtensionWest 162ndAve. 172ndAve Constructnew3laneroadwithcontinuousleftturnlane,sidewalks,bikelanes,trafficsignalsandabridgeoverRockCreek.

24,661,600$ 2028-2040 No RoadsandBridges

Increaseaccesstojobs

ClackamasCounty HappyValley 11669 MiddleFosterRd.Improvements 172nd190thConnector SunnysideRoadExtension

Widentwo-laneminorarterialfromthe172nd/190thconnectortoSunnysideRoadeast,toincludecontinuousleftturnlane,sidewalksandbikelanes.Projectsegmentis8,000feetinlength.

11,055,200$ 2028-2040 No RoadsandBridges

Servenewurbanarea

ClackamasCounty HappyValley 11901 177thAve.ROWAcquisitionandPlanning SagerRd.ExtensionEast RockCreekBlvd. Conductplanningandpreliminaryright-of-wayacquisitionforanew3laneroadway(withsidewalks,bikelanesandcontinuousleftturnlane)fromSagerRd.extensioneasttoRockCreekBlvd.

3,243,300$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 3of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

ClackamasCounty HappyValley 12042 WestMountScott/ScouterMountainTrailLoop

SpringwaterCorridor Hwy.212 BuildlooptrailfromClatsopstreettoHighway212/ClackamasRiver.ConnectsSpringwaterCorridor,Mt.Talbert,ScoutersMountainNaturePark,andtheClackamasRiver.PartnersincludetheCityofPortlandandCityofHappyValley.

7,085,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty LakeOswego 11087 BryantRdbikelanes/pathway BoonesFerryRd ChildsRd 7,500'longwideningfor6'bikelanes,6'sidewalk/pathway,bothsides.Railroadcrossingreconstruction;retainingwallneededatcrossing.

16,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty LakeOswego 11171 TryonCreekPedBridge(@TryonCovePark) FoothillsPark TryonCovePark 500'long,10'wideasphaltpathwaycompletesaconnectionattheexistingnorthendFoothillspathwaywithtoTryonCoveParkwithapedestrianbridge(perFoothillsDistrictPlan).ConnectstofutureWillametteRiverGreenwayTrail.

3,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty LakeOswego 11172 OR43(StateSt)BikeLanes TerwilligerBlvd McVeyRd 5,500'longwideningforbikelanes,NBandSB.NHS/AASHTO/ODOTstdsapply.ImproveaccessandconnectivitytotheFoothillsarea.

10,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty LakeOswego 11286 TryonCreekBridge(@Hwy43/Terwilliger) 500'northofHwy43/Terwilliger

Hwy43/EAve ReplaceexistingboxculvertunderHwy43withvehicularbridgeoverTryonCreek,addmulti-usepathwayalongcreekandcompletewithbikelanes,sidewalksandturnlanetoTerwilliger.Fullcostofconstructiontobesharedamongagencypartnersand/orenvironmentalactionplans.

10,000,000$ 2028-2040 No RoadsandBridges

Planning/coordinatemulti-jurisdictioninvestments

ClackamasCounty LakeOswego 11396 SouthShorePathway LakeviewBlvd McVeyAve 12,800’long,6’wideseparatedasphaltpathwayonsouthsideofroadway.Retainingwallsandstormwaterimprovementsrequired.

12,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty LakeOswego 11397 OR43Pathway:LOtoWestLinn OakSt ArborDr ImplementthedesignplanforanactivetransportationcorridoralongHwy43consistentwiththeConnectingClackamasPlan.

19,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty LakeOswego 11613 KnausRdPathwaysandBikeLanes BoonesFerryRd CountryClubRd 4,000’long,6’wideseparatedasphaltpathwayand5'widebikelanesonbothsidesofroadway.

9,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty Milwaukie 10098 McLoughlinBlvdSidewalks HarrisonSt UPRR Fillinsidewalkgapsonbothsidesofstreet. 5,700,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty Milwaukie 10100 Group9--DowntownPedestrianImprovements

Downtown Downtown DowntownStreetscapeImprovements=Installsidewalkbulbouts,lighting,andpedestrianamenities.

DowntownParkingSignage=InstallwayfindingandidentificationsignageatMcLoughlinBlvdintersectionsandaroundpublicparkinglots.

DowntownPublicParkingLotImprovements=Upgradeandmaintainoff-streetpublicparkingfacilitieswithimprovedlandscapingandlighting.

13,800,000$ 2028-2040 No ActiveTransportation

Linklandusewithtransportationinvestments

ClackamasCounty Milwaukie 10101 KelloggCreekDamRemovalandOR99EUnderpass

Location-Specific Location-Specific ReplaceOR99EbridgeoverKelloggCreek,removedam,restorehabitat.Constructbike/pedundercrossingbetweendowntownMilwaukieandRiverfrontPark.

10,500,000$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 4of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

ClackamasCounty Milwaukie 11174 Group3--ImprovedBike/PedConnectionstoSpringwaterTrailnearTacomaStation

VariousLocations VariousLocations 29th/Harvey/40thNeighborhoodGreenway=Designateasa"neighborhoodgreenway"andinstalltraffic-calmingimprovements.

ImprovedConnectionfromSpringwaterTrailtoPendletonSite(Ramps)=ConstructrampstoimproveexistingconnectionofSpringwaterTrailtoPendletonsiteatClatsopSt.(TSAP)

ImprovedConnectionfromSpringwaterTrailtoPendletonSite(WidenedUndercrossing)=WidenexistingundercrossingtoimproveconnectionofSpringwaterTrailtoPendletonsiteatClatsopSt.(TSAP)

ImprovedConnectionfromSpringwaterTrailtoTacomaStation=ConstructstairstoconnectSpringwaterTrailtoTacomastation.(TSAP)

ImprovedConnectionfromSpringwaterTrailtoPendletonSite(Tunnel)=ConstructtunnelunderSpringwaterTrailtoimproveconnectiontoPendletonsiteatClatsopSt.(TSAP)

ImprovedConnectionfromSpringwaterTrailtoMcLoughlinBlvd=ConstructstairsorotherfacilitytoconnectSpringwaterTrailtowestsideofMcLoughlinBlvd.(TSAP)

SpringwaterTrailCompletion=ContributetoregionalprojecttocompleteSpringwaterTrail("SellwoodGap")alongOchocoSt.

Bicycle/PedestrianImprovementstoMainSt-Constructmultiusepathorotherimprovedbike/pedfacilitiesonMainSttoprovidesaferconnectionbetweendowntownandTacomastation.(TSAP).-Phase1Committed=

8,900,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty Milwaukie 11175 PublicParkingStructure Location-specific Location-specific Construct3-to4-storypublicparkingstructurewithretailatgroundfloorforvisitor/employeeparking.

14,700,000$ 2028-2040 No TSMO/TDM/TOD Relievefuturecongestion

ClackamasCounty Milwaukie 11532 LinwoodAveCapacityImprovements(south) MonroeSt HarmonyRd Widentostandardthreelanecrosssection. 10,300,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

ClackamasCounty Milwaukie 11536 DowntownTransitCenterImprovements Location-specific Location-specific Constructnewbuslayoverfacilityoutsideofthedowntowncore. 1,100,000$ 2028-2040 No Transit Relievecurrentcongestion

ClackamasCounty Milwaukie 11538 LinwoodAveCapacityImprovements(north) JohnsonCreekBlvd MonroeSt Widentostandardthreelanecrosssection. 12,800,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

ClackamasCounty Milwaukie 11623 Group11--IntersectionImprovementsinNorthIndustrialArea

OchocoSt HarrisonSt SignageandIntersectionImprovementsatMcLoughlinBlvdandOchocoSt=Establishsignagefortrucksandimproveintersection.(TSAP)

IntersectionImprovementsatMcLoughlinBlvdand17thAve=Prohibitleft-turnmovementfrom17thAvetonorthboundMcLoughlinBlvdandincludeinHwy224&Hwy99ERefinementPlan.

IntersectionImprovementsatMainStandMailwellDr=Upgradeintersectionturningradiitobetteraccommodatefreightmovements.

2,300,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

ClackamasCounty Milwaukie 11624 LocalStreetImprovementsinTacomaStationArea

Location-specific Location-specific ConstructstreetimprovementsonStubbSt,BetaSt,OchocoSt,HannaHarvesterDr,andMailwellDr.(TSAP)

5,600,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac

ClackamasCounty Milwaukie 11957 LakeRdCapacityImprovements 21stAve OatfieldRd Widentostandardthreelanecrosssection. 6,300,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

ClackamasCounty ODOT 11992 I-205OperationalImprovements ColumbiaRiver I-5 ConstructimprovementstoaddressbottlenecksandimprovesafetyonI-205.Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysisandrefinementplanning.

20,000,000$ 2028-2040 No Throughways Increasesystemefficiency

ClackamasCounty ODOT 12020 OR212/224SunriseProjectPhase3 I-205 172ndAve ConstructremainingimprovementsintheSunriseCorridorconsistentwiththeFEIS/ROD

475,000,000$ 2028-2040 No Throughways Relievecurrentcongestion

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 5of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

ClackamasCounty OregonCity 10048 HollyLaneBike&PedestrianImprovements RedlandRoad MapleLane Improvetoaminorarterialcross-section,addingsidewalksandbikelanestobothsidesfromRedlandtoSDonovan,replacingthebridgejustsouthofRedlandandaddinganenhancedstreetcrossingatSDonovan.CompletesidewalkandbikelanegapsoneastsideofthestreetbetweenDonovanandMapleLane.(TSPProjectD83,W21,W22,B19,B20,C8)TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.

17,000,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

ClackamasCounty OregonCity 10120 WashingtonStreetBike&PedestrianImprovements(South)

HomeDepotDrive AbernethyRoad CompletetheBoulevardprojectincludingstormwaterlowimpactdevelopmentdesignimprovements,sidewalks,landscapingandstreetlighting.(TSPW5)

1,900,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

ClackamasCounty OregonCity 10144 Hwy99E&I-205SBInterchangeAccess DunesDrive I-205SBRampTerminus Dualleftturnlaneson99EapproachtoSBI-205ramp,rampwideningtoaccommodateapproach.(CloselyrelatedtoTSPD75,D76butnotactuallytheseprojects)

3,000,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

ClackamasCounty OregonCity 10147 NewellCreekCanyon/HollyLaneShared-UsePath

Hwy213andRedlandRoad

MapleLaneRoad Addashared-usepathalongthewestsideofthegullybetweentheRedland/LivesayandHolly/DonovanintersectionandthenalongHollyLanebetweenDonovanandMapleLane.WillrequireabridgeoverthegullysouthofRedlandRoad(TSPProjectS12,S13).TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.

5,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty OregonCity 10150 BarlowRoadShared-UseTrail AbernethyRoad UGB Addashared-usepathonthewest/southsideofRedlandRoad,alongthenorthsideofthegullyfromtheRedland/LivesaytoHolcomb/OakTreeintersection,andfromHolcombtoAmesStreet.InstallenhancedcrossingsatRedlandRoadandHolcombBlvd(TSPS6,S9,S10,S11,C5,C7)TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.

4,600,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty OregonCity 11186 WillametteRiverShared-UsePath S2ndStreet UGB Addashared-usepathalongtherailroadgrade.RehabilitateexistingboardwalkbetweenSouth2ndStreetandHedgesStreet(TSPProjectS37)TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.

6,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty OregonCity 11547 ClairmontDriveExtension BeavercreekRoad HollyLane Constructnew3laneroadway,sidewalks,bikelanes,turnlanestoserveUGBexpansionarea.(TSPD54)

2,000,000$ 2028-2040 No RoadsandBridges

Servenewurbanarea

ClackamasCounty OregonCity 11548 WashingtonStreetBike&PedestrianImprovements(North)

11thStreet 7thStreet Boulevardimprovementsincludingwideningsidewalks,sidewalkinfill,ADAaccessibility,bikelanes,reconfiguretravellanes,addbusstopamenities.(TSPD28&D92plus50%ofD1)

1,600,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

ClackamasCounty OregonCity 11550 HollyLaneExtension(South) ThayerRoad MeyersRoad New3laneroadway,sidewalks,bikelanes,turnlanestoserveUGBexpansionarea.(TSPD58)

4,800,000$ 2028-2040 No RoadsandBridges

Servenewurbanarea

ClackamasCounty OregonCity 11551 SouthEndRoad PartlowRoad UGB Streetimprovementsincludinglanereconfigurations,sidewalks,ADAaccessibility,bikelanes,streetlighting,andtravellanes.(TSPD89,D33,D23,D41,D42)TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.

7,700,000$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

ClackamasCounty OregonCity 11552 OR99EPedestrianOvercrossing WillametteRiver McLoughlinPromenade ConstructapedestrianandbicyclebridgeoverHighway99E,connectingtheMcLoughlinPromenadetotheWillametteFallsShared-UsePath.(TSP___)

6,500,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty OregonCity 11757 McLoughlinBlvdBike&PedestrianImprovements(ViaductsOnly)

10thStreet 8thStreet Replacementoftheviaducts(onefull&onepartialviaduct),includingwidersidewalks&boulevardtreatmentsalongviaducts(PortionofTSPD74&S3)

38,000,000$ 2028-2040 No ActiveTransportation

Keepsystemingoodrepair

ClackamasCounty OregonCity 11891 OR99E&I-205NBInterchangeAccess I-205SBRampTerminus I-205NBRampTerminus Dualleftturnlaneson99EapproachtoNBI-205ramp,rampwideningtoaccomodateapproach,dualleftturnlanesfromoff-rampontoHwy99ESB,signalmodifications.(CloselyrelatedtoTSPD75,D76butnotactuallytheseprojects)

3,000,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

ClackamasCounty SMART 11749 Propertyacquisition WilsonvilleRoad WilsonvilleRoad Obtainpropertytocreateeasiercrosstownturnaroundsforlocalbusservice

8,000,000$ 2028-2040 No Transit Increasesystemefficiency

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 6of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

ClackamasCounty SMART 11750 SMARTCentralInformationalCenteratWilsonvilleStation

9699SWBarberSt,Wilsonville,OR97070

9699SWBarberSt,Wilsonville,OR97070

Buildaninformationcenterwithkioskstopurchasebuspassesandgathertransitresources.

4,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

ClackamasCounty SMART 11751 WESExpansion Wilsonville Salem WESserviceexpansionfromWilsonvilletoSalem 15,000,000$ 2028-2040 No Transit Relievecurrentcongestion

ClackamasCounty Wilsonville 11770 WeidemanRoadExtension-West ParkwayAve CanyonCreekRoad Constructnewroadwaywithsidewalksandbufferedbikelanes 4,300,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

ClackamasCounty Wilsonville 11771 WeidemanRoadExtension-East CanyonCreekRoad StaffordRoad Constructnewroadwithsidewalksandbufferedbikelanes 8,800,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

ClackamasCounty Wilsonville 11775 ParkwayAveUrbanUpgrade Target/CostcoEntrance PrinterParkway Widento3lanesectionandaddsidewalksandbufferedbikelanes 5,000,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

ClackamasCounty Wilsonville 11776 PrinterParkwayUrbanUpgrade ParkwayAvenue CanyonCreekRoad Widento3lanesectionandaddsidewalks,bikelanesandmulti-usepath. 3,600,000$ 2028-2040 No RoadsandBridges

Increaseaccesstojobs

ClackamasCounty,MultnomahCountyODOT 11985 I-205MultiUsePath GlenJacksonBridge 82ndDrive(southernterminus)

ImprovecrossingsandaccesstoI-205MUPatParkroseTransitCenter,Glisan,Burnside,Stark,Washington,SpringwaterTrail,JohnsonCreek/Flavel,CrystalSprings,ClackamasTownCenter,andotherlocations,asneeded.

10,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

ClackamasCounty,WashingtonCountyClackamasCounty 10054 65th/Elligsen/StaffordIntersectionRoundabout

65th,Elligsen,StaffordRd.intersections

65th,Elligsen,StaffordRd.intersections

Constructroundabouttoreplaceexistingunsafeintersectiontoimprovesafetyandreducecongestion.

5,846,500$ 2028-2040 No RoadsandBridges

Reducefatalandsevereinjurycrashes

ClackamasCounty,WashingtonCountyClackamasCounty 11939 I-205BusServicefromClackamastoBridgeport

EndoftheTriMetMAXGreenLineatClackamasTownCenter

EndoftheproposedSWCorridorHCTprojectatBridgeport

ProvidebusserviceonorparalleltoI-205connectinghighcapacitytransitwithemploymentcentersfromClackamasTownCenter(endoftheMaxGreenLine)toBridgeport(proposedendofSouthwesthighcapacitytransitproject)

23,300,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

MultnomahCounty Gresham 10416 HoganCorridorImprovements Stark Burnside Interimcapacityimprovementsandaccesscontrols. 20,346,310$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

MultnomahCounty Gresham 10417 Hogan:PalmquisttoRuggNewPrincipalArterialConnection

Palmquist RuggRd. Completeprojectdevelopmentandconstructnewprincipalarterialconnectionwithmulti-usepath.

36,152,117$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

MultnomahCounty Gresham 10422 Division:257th/KanetoCityLimits 257thAve. Citylimits Improvetocommunitystreetstandards,includingbikelanes. 4,194,291$ 2028-2040 No ActiveTransportation

Buildcompletestreet

MultnomahCounty Gresham 10424 Wallula/212th:DivisiontoStarkWidening Division Stark Widenroad,addcurb/gutter,sidewalks.AtBurnside,addnorthbound,southbound,leftturnlanes.SignalizeStark.

8,873,911$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty Gresham 10427 Regner:RobertstoSouthernCityLimitsReconstruction

Roberts SouthernCityLimits Bringstominorarterialstandard,addspedestrian,bicyclefacilities,improvesRegner/ButlerintersectionbyaddingNBleft-turnpocketandsignalizingintersection.

31,109,301$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty Gresham 10429 PowellValley:Burnsideto282ndBikeandPedImprovements

Burnside 282nd.Ave. ImprovePowellValleyw.pedandbikefacilities. 15,568,069$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Gresham 10430 Orient:SouthCitylimitstoKaneDrWidening SouthCityLimits KaneDr Upgradestoarterial4lanestandards. 9,567,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty Gresham 10432 Division:WallulatoBurnsideBoulevardImprovements

Birdsdale Wallula Completeboulevarddesignimprovements. 12,928,707$ 2028-2040 No ActiveTransportation

Buildcompletestreet

MultnomahCounty Gresham 10433 Division:KellytoBurnsideBoulevardImprovements

Kelly Burnside Completeboulevarddesignimprovements. 10,982,649$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty Gresham 10434 Burnside:212thtoHoganBoulevard Wallula Hogan CompleteboulevarddesignimprovementsonBurnsidefromWallula/212toHogan.ImproveintersectionofBurnsideatDivisionbyaddingeastboundRTandsignal,andalsoimprovetheintersectionofBurnsideandHogan.

34,595,974$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty Gresham 10447 162nd:GlisantoHalseyWidening&Bike/PedImprovements

Glisan Halsey Reconstruct,widento5lanes,plusEBRTatGlisan. 8,413,967$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty Gresham 10461 Towle:ButlertoBinfordLakeImprovements Butler BinfordLake Constructsidewalks,bikelanesandintersectionimprovements. 3,510,850$ 2028-2040 No ActiveTransportation

Buildcompletestreet

MultnomahCounty Gresham 10493 181st:I-84toSandyWidening Sandy I-84 Addsouthboundauxlane&widenRRovercrossing. 1,000,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

MultnomahCounty Gresham 10497 181st:atStarkandSandyIntersections Sandy Stark AtSandy:Northboundrightturn,2ndwestboundleftturn.Overlapeastboundrightturn.AtStark,add2ndleftturnlaneoneastandwestlegs.

2,003,107$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 7of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

MultnomahCounty Gresham 10527 Hogan:PowelltoPalmquistWidening Powell Palmquist Improvetoarterialstandards. 13,228,630$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty Gresham 10541 182nd:GiesetoCheldelin Giese Cheldelin Improve182ndtocollectorstandards. 12,540,944$ 2028-2040 No RoadsandBridges

Servenewurbanarea

MultnomahCounty Gresham 11098 RockwoodTC181stLRTStationEnhancements

181stLRTStation LocalstreetstoLRTstation

Improvesidewalks,lighting,crossings,busshelters,benchesat181stLRTstation,onStarkSt.andotherintersectingstreets.

9,481,551$ 2028-2040 No ActiveTransportation

Increasesystemefficiency

MultnomahCounty Gresham 11252 Halsey:162ndto181stACMandTransitSignalPriority

162nd 181st Installupgradedtrafficsignalcontrollers,establishcommunicationstothecentraltrafficsignalsystem,providearterialdetection(includingbicycledetectionwhereappropriate)androutinelyupdatesignaltimings.Providerealtimeandforecastedtravelerinformationonarterialroadwaysincludingcurrentroadwayconditions,congestioninformation,traveltimes,incidentinformation,constructionworkzones,currentweatherconditionsandothereventsthatmayaffecttrafficconditions.

5,208,700$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

MultnomahCounty Gresham 11253 Stark:162ndto190thACMSignalUpgrades 162nd 190th Installupgradedtrafficsignalcontrollers,establishcommunicationstothecentraltrafficsignalsystem,providearterialdetection(includingbicycledetectionwhereappropriate)androutinelyupdatesignaltimings.Providerealtimeandforecastedtravelerinformationonarterialroadwaysincludingcurrentroadwayconditions,congestioninformation,traveltimes,incidentinformation,constructionworkzones,currentweatherconditionsandothereventsthatmayaffecttrafficconditions.

3,826,800$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

MultnomahCounty Gresham 11256 Division:BirdsdaletoUS26AdaptiveSigns+TransitPriority

Birdsdale US26 IncludestheACMwithbothadaptivesignaltimingandtransitprioritytreatment.

2,232,300$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

MultnomahCounty Gresham 11603 Hogan:PowelltoDivision Powell Division BuildoutofHogantomajorarterialcross-section. 26,575,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

MultnomahCounty MultnomahCounty 10386 GlisanSt.Multi-modalImprovements 202ndAve./Gresham-FairviewTrail

207thAve./SalishPondsNaturalArea

ReconstructGlisanStreettoprovidemultimodalconnectionbetweenGresham-FairviewTrailandSalishPondsNaturalArea.Includebikelanes,sidewalks,twotravellanesineachdirection,andon-streetparking.4lanes.Designgreen-streettreatmentfordrainageimprovements,includingFairviewCreekculvertreplacement.SouthsideofGlisanStisinGresham,northisCityofFairview.

12,224,500$ 2028-2040 No RoadsandBridges

Buildcompletestreet

MultnomahCounty MultnomahCounty 10391 ReconstructHistoricColumbiaRiverHwy. 244thAve. HalseySt. ReconstructHistoricColumbiaRiverHwyandNE244thAvetominorarterialstandardswith2travellanes,centerturnlane/median,bicyclelanesandsidewalk.ReconstructionofrailroadbridgeonHCRHisnotincludedinthisproject.

6,538,513$ 2028-2040 No ActiveTransportation

Increasesystemefficiency

MultnomahCounty MultnomahCounty 10395 ReplaceRRovercrossingatHistoricColumbiaRiverHwy

Halfmileeastof244thAve.

Halfmileeastof244thAve.

Reconstructrailroadbridgetoaccommodatewidertravellanes,sidewalksandbikelanes.

7,441,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

MultnomahCounty MultnomahCounty 10401 ReconstructMarineDr. Interlachen I-84 ReconstructMarineDrivebetweenIntelachenandthefrontageroadsinTroutdale.

14,882,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

MultnomahCounty MultnomahCounty 10407 Fishpassageculvertreplacement FairviewandArataCreeks FairviewandArataCreeks

Replace5culvertswithfishfriendlystructuresallowingforpassagetofederallyendangeredspecies.Culvertlocations:223rd/Fairview,Sandy/Fairview,Arata/244th,ArataCreek/Halsey,Fairview/Glisan

1,606,193$ 2028-2040 No RoadsandBridges

Keepsystemingoodrepair

MultnomahCounty MultnomahCounty 11297 NE207thAve.:ArterialCorridorManagement(ACM)

Sandy Glisan Installupgradedtrafficsignalcontrollers,establishcommunicationstothecentraltrafficsignalsystem,providearterialdetection(includingbicycledetectionwhereappropriate)androutinelyupdatesignaltimings.Providerealtimeandforecastedtravelerinformationonarterialroadwaysincludingcurrentroadwayconditions,congestioninformation,traveltimes,incidentinformation,constructionworkzones,currentweatherconditionsandothereventsthatmayaffecttrafficconditions.

1,647,650$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

MultnomahCounty MultnomahCounty 11299 257th/KaneDr.:ArterialCorridorManagement(ACM)w/AdaptiveSignalTiming

I-84 OrientDr. Installupgradedtrafficsignalcontrollers,establishcommunicationstothecentraltrafficsignalsystem,providearterialdetection(includingbicycledetectionwhereappropriate)androutinelyupdatesignaltimings.Providerealtimeandforecastedtravelerinformationonarterialroadwaysincludingcurrentroadwayconditions,congestioninformation,traveltimes,incidentinformation,constructionworkzones,currentweatherconditionsandothereventsthatmayaffecttrafficconditions.

2,976,400$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

MultnomahCounty MultnomahCounty 11375 StarkStreetBridge StarkStreetBridgeatSandyRiver

RepairandupdateStarkStreetBridge. 15,945,000$ 2028-2040 No RoadsandBridges

Keepsystemingoodrepair

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 8of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

MultnomahCounty MultnomahCounty 11376 EarthquakeReadyBurnsideBridgePhase2 WillametteRiver WillametteRiver ERBBDesignandROWPhase 105,000,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

MultnomahCounty MultnomahCounty 11599 ATPProjectImplementation EastMultnomahCounty EastMultnomahCounty ImplementationofrecommendationsfromATP 21,260,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

MultnomahCounty MultnomahCounty 11600 MarineDriveat223rd MarineDriveat223rd MarineDriveat223rd Widentoaccommodatefreighttrafficandprovidebike/pedfacilities 10,630,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac

MultnomahCounty MultnomahCounty 11688 SandytoSpringwaterPathPlanning SpringwaterCorridor 40-mileloop SandytoSpringwaterPath:masterplan 1,594,500$ 2028-2040 No ActiveTransportation

Planning/coordinatemulti-jurisdictioninvestments

MultnomahCounty MultnomahCounty 12018 TDMandTSMOinEastMultnomahCounty EastMultnomahCounty EastMultnomahCounty CarandVanpoolincentives,TMAs,Shuttles,supportprograms,andtargetedoutreachtoreducesingleoccupantvehicletravel

2,258,875$ 2028-2040 No TSMO/TDM/TOD Increasetraveloptions/alt.todrivingalone

MultnomahCounty ODOT 11583 I-5Northbound:LowerBoonesFerrytoCarmanAuxiliaryLaneExtension

LowerBoonesFerryRd.Interchange

CarmanDr.Interchange ExtendexistingauxiliarylanebetweentheLowerBoonesFerryRoadinterchangeandtheCarmanDriveinterchange.

22,500,000$ 2028-2040 No Throughways Increasesystemefficiency

MultnomahCounty ODOT 11974 I-405OperationalImprovements FremontBridge I-5 ConstructoperationalimprovementstoaddressbottlenecksandimprovesafetyonI-405.Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysis,andrefinementplanning

50,000,000$ 2028-2040 No Throughways Increasesystemefficiency

MultnomahCounty ODOT 11983 I-5Multi-UsePath HaydenIslandDrive VictoryBlvd ConstructimprovementstotheI-5MUPinJantzenBeachtobringpathuptocurrentstandards,improvesafety,andimproveaccesstotheI-5ColumbiaRiverBridge.Improveped.crossingsatTomahawkIslandDriveandHaydenIslandDrive.

10,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty ODOT 11993 I-84OperationalImprovements I-5 Troutdale ConstructimprovementstoaddressbottlenecksandimprovesafetyonI-84.Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysisandrefinementplanning

20,000,000$ 2028-2040 No Throughways Increasesystemefficiency

MultnomahCounty PortofPortland 10364 PDXLightRailStation/TrackRealignment PDXTerminalArea PDXTerminalArea Realignlightrailtrackintoterminalbuildingtoaccommodateairlinegateexpansions.

17,359,534$ 2028-2040 No Transit Linklandusewithtransportationinvestments

MultnomahCounty PortofPortland 11309 CullyBlvd.Gradeseparation Columbia Lombard ConstructroadwayovercrossingatNECullyBlvd.overKentonline. 37,205,000$ 2028-2040 No Freight Increasesystemefficiency

MultnomahCounty PortofPortland 11949 NorthPortlandJunction:Undoingthe"X" UPRRPeninsulaJunction NorthPortlandJunction Eliminatetheat-gradecrossingofUPRRandBNSFtracksatNorthPortlandJunction.

33,598,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac

MultnomahCounty PortofPortland 11951 ColumbiaBoulevardRailOvercrossing ColumbiaBoulevardatPennJunction

ColumbiaBoulevardatPennJunction

GradeseparateColumbiaBlvd.atPennJunctiontoeliminatethreeat-gradecrossings.

28,935,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

MultnomahCounty PortofPortland 11952 ColumbiaRiverRailBridgeImprovements ColumbiaRiverRailBridge

ColumbiaRiverRailBridge

ReplaceExistingswingspanwithliftspanandrelocatepositiontomid-riverchannel.

35,548,800$ 2028-2040 No Freight Increasesystemefficiency

MultnomahCounty PortofPortland 11953 SixmphCurvesRailroadImprovements SteelBridge JustnorthofSteelBridge

RealignthecurvesjustnorthoftheSteelBridgetoimproverailspeedandcapacity.

23,600,000$ 2028-2040 No Freight Increasesystemefficiency

MultnomahCounty PortofPortland 11955 RailroadBridgeandTrackImprovements ColumbiaSloughRailBridge

ColumbiaRiverRailBridge

ImproverailtrackconditionsonapproachestoWillametteRiverandColumbiaRivebridgestoincreaserailroadspeedandcapacity.

10,751,000$ 2028-2040 No Freight Increasesystemefficiency

MultnomahCounty PortofPortland 11956 RivergateColumbiaSloughRailBridge Terminal6 Terminal5 ConstructarailbridgeacrossColumbiaSloughtoproviderailconnectiontoSouthRivergatefromTerminal6.

10,840,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac

MultnomahCounty Portland 10222 FlavelDrRoadwayImprovements SE45th Clatsop FullyimprovestreetfromSE45thtoClatsopStreetwithtravellanes,curbs,swales,sidewalks,andseparatedin-roadwaybicyclefacilitiesfrom52ndtoClatsop.

7,294,088$ 2028-2040 No ActiveTransportation

Buildcompletestreet

MultnomahCounty Portland 10244 KittridgeBridgeSeismicRetrofit NWKittridge/YeonBridge NWKittridge/YeonBridge

Retrofitexistingseismicallyvulnerablebridge(#010)acrossrailroadtrackstoensureemergencyresponseandaccesstopetroleumsupplieslocatedalongtheWillametteRiverintheeventofanearthquake.

15,249,213$ 2028-2040 No Freight Keepsystemingoodrepair

MultnomahCounty Portland 10288 ParkroseConnectivityImprovements,NE 105th 109th SupplementaccessrouteforcommercialpropertiesinParkrosebyimproving109thfromSandytoKillingsworthandKillingsworthfrom109thto105th,servingtruckaccessfunctions,pedestrian,andbikeconnections.

5,000,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 9of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

MultnomahCounty Portland 10292 BelmontStreetscapeImprovements SE25th SE43rd Designandimplementstreetscapeimprovementstoenhancesidewalks,lighting,crossings,transitstops,andsignals.

5,722,698$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 10293 NEFremontStreetscapeImprovements NE42nd NE52nd Designandimplementstreetscapeimprovementstoenhancesidewalks,lighting,crossings,transitstops,andsignals.

7,446,133$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 10295 OuterMilwaukieStreetscapeImprovements SEYukon SETacoma Designandimplementstreetscapeimprovementstoenhancesidewalks,lighting,crossings,transitstops,andsignals.

5,386,378$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 10308 BoonesFerryRdBikeway SWTerwilliger PortlandCityLimits Designandimplementbicyclefacilities. 7,015,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 10316 HalseyStBridgeSeismicRetrofit NEHalsey/I-84 NEHalsey/I-84 RetrofitexistingseismicallyvulnerablebridgeacrossI-84(#021)toensureemergencyresponseandeconomicrecoveryintheeventofanearthquake.

7,670,501$ 2028-2040 No RoadsandBridges

Keepsystemingoodrepair

MultnomahCounty Portland 10334 11th/13thAveRailOvercrossing NE11thAve&NELombardPl

NE11thAve&NELombardPl

ConstructroadwayovercrossingatNE11th/13thoverKentonline. 35,000,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

MultnomahCounty Portland 10339 ColumbiaBlvdProtectedBikeway MLKJr.Blvd NLombard Designandimplementaprotectedbikewayormulti-usepath. 6,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 10347 PleasantValleyFosterRdExtension SEJenneRd SEGieseRd. DesignandimplementmultimodalimprovementsbasedonthePleasantValleyImplementationPlanrecommendations.

2,525,400$ 2028-2040 No RoadsandBridges

Servenewurbanarea

MultnomahCounty Portland 10376 ColumbiaBlvdFreightImprovements:Design/Construction

NE60thAve. NE82ndAve. Constructstreetandintersectionmodificationstoimprovefreightreliabilityandaccesstoindustrialproperties.

14,000,000$ 2028-2040 No Freight Increasesystemefficiency

MultnomahCounty Portland 10536 ClatsopStreetExtension SE162ndAve PortlandCityLimits ExtendstreeteastintoPleasantValleybasedonthePleasantValleyImplementationPlan.

4,202,582$ 2028-2040 No RoadsandBridges

Servenewurbanarea

MultnomahCounty Portland 11117 WillbridgeIndustrialAreaRailOvercrossing NWBalboa NWStHelensRd ProvideanalternativecrossingoftheBNSFRailroadtoimproveconnectivityandsafetybetweenUS30andtheindustrialpropertiesservedbyNWFrontAvenueintheWillbridgeareaoftheNWIndustrialDistrict.

23,113,022$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

MultnomahCounty Portland 11323 Sullivan'sGulchTrail,Segment1 EastbankEsplande NE21st Multi-usepathalongSullivan'sGulch.ProjectrequirestheuseofUnionPacificright-of-waytobefeasible,otherwiseanalternatealignmentwillneedtobedeveloped.

40,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 11870 UnionStation,Phase3 UnionStation UnionStation Corebuildingimprovements,operationalimprovements,andrailsideimprovementsforUnionStation.

150,000,000$ 2028-2040 No Transit Keepsystemingoodrepair

MultnomahCounty Portland 11871 Going/GreeleyInterchangeImprovements NGoing/Greeley NGoing/Greeley RedesignGoing/GreeleyinterchangeincludingclimbinglaneonGoingtoimprovetruckmovementbetweenSwanIsland,LowerAlbina,andI-5.

16,750,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac

MultnomahCounty Portland 11872 NFessendenStBridgeReplacement FessendenSt,N(overrailroadcut)

FessendenSt,N(overrailroadcut)

Replaceexistingstructurally-deficient,weight-restrictedbridge(ownedbyBNSF)overrailroadcut.

4,700,000$ 2028-2040 No RoadsandBridges

Keepsystemingoodrepair

MultnomahCounty Portland 11873 NWillametteBlvdBridgeReplacement WillametteBlvd,N(overrailroadcut)

WillametteBlvd,N(overrailroadcut)

Replaceexistingstructurally-deficient,weight-restrictedbridge(ownedbyBNSF)overrailroadcut.

9,750,000$ 2028-2040 No RoadsandBridges

Keepsystemingoodrepair

MultnomahCounty Portland 11874 HaydenIslandBridge MarineDr HaydenIsland DesignandconstructanarterialbridgefromExpoCentertoEastHaydenIsland.Explorefeasibilityofdesignsthatwouldprioritizetransit,bikes,andemergencyvehicleaccess,andnotfacilitatecut-throughtrafficforvehiclesthatdonothaveoriginsordestinationsontheisland.

80,000,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 10of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

MultnomahCounty Portland 11875 NEArgyleStreetExtension 14th MLK ExtendNEArgyletoprovideamoreconnectedstreetgrid.Thisstreetwillserveasacollector/distributorforindustrialbusinessesandreducetrafficcongestionattheMLK/Columbiaintersection.

11,397,579$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

MultnomahCounty Portland 11876 NMississippiStreetscapeImprovements Fremont Skidmore ConstructstreetscapeimprovementstoenhancetheareaasaPedestrianDistrict.

2,500,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 11878 Sullivan'sGulchTrail,Segment2 21stAve HollywoodTransitCenter

Constructamulti-usetrailforpedestriansandbicycleswithintheBanfield(I-84)Corridorfrom21stAvetotheHollywoodTransitCenter.ProjectrequirestheuseofUnionPacificright-of-waytobefeasible,otherwiseanalternatealignmentwillneedtobedeveloped.

30,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 11879 Sullivan'sGulchTrail,Segment3 HollywoodTransitCenter Broadway Constructamulti-usetrailforpedestriansandbicycleswithintheBanfield(I-84)CorridorfromtheHollywoodTransitCentertoBroadway.ProjectrequirestheuseofUnionPacificright-of-waytobefeasible,otherwiseanalternatealignmentwillneedt

35,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty Portland 11880 CullyBlvdRailOvercrossing NECullyBlvd(overKentonline)

NECullyBlvd(overKentonline)

ConstructroadwayovercrossingatNECullyBlvd.overKentonline. 35,000,000$ 2028-2040 No Freight Increasefreightaccesstoindust&intermodalfac

MultnomahCounty Portland 11882 SE13thAveStreetscapeImprovements Malden Tacoma Planandimplementstreetscapeandtransportationimprovements,includingcrossingimprovements,toincreaseopportunitiestowalkandenhancethemainstreetcharacter.

2,223,555$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

MultnomahCounty TriMet 11318 StreetcarExtension:MLK Broadway Killingsworth Publicoutreach,planning,design,engineering,andconstructionforfuturestreetcarextensionfromLloydDistricttoNEPortland.

65,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

MultnomahCounty TriMet 11639 Streetcar:JohnsLanding SWLowell WillamettePark CorridorAlternativesAnalysis,publicoutreach,planning,design,engineering,andconstructionforfuturestreetcarextensionfromPortlandtoJohnsLanding.Potentialfutureconstruction.

80,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

MultnomahCounty TriMet 12033 ETC:SEBelmontEnhancedTransitProject CentralCityPortland GatewayTransitCenter Capitalconstructionofregionalenhancedtransitproject. 20,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

MultnomahCounty TriMet 12034 ETC:Lombard/CesarChavezEnhancedTransitProject

St.JohnsTownCenter MilwaukieTownCenter Capitalconstructionofregionalenhancedtransitproject.ProjectwillcoordinatewithODOTtoidentifylocationsanddesigntreatments.

50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

MultnomahCounty TriMet 12035 ETC:SEPowellBlvdTransitProject CentralCityPortland TBD Constructmulti-modalsafetyandtransitimprovementsbasedontheoutcomesoftheprecedingSEPowellBlvdCorridorsRefinementPlan.ProjectwillcoordinatewithODOTtoidentifylocationsanddesigntreatments.

50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

MultnomahCounty TriMet 12036 ETC:ColumbiatoClackamasEnhancedTransitProject

AirportWay FosterRoad Capitalconstructionofregionalenhancedtransitproject,reflectingMultnomahCountyportionofcorridor(connectswithClackamasCounty172ndTransitProject).

20,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

MultnomahCounty TriMet 12050 CentralCityCapacityAnalysis(ProjectDevelopment&PreliminaryEngineering)

CentralCity(West) CentralCity(East) AstudytoanalyzeCentralCitytransitcapacityandidentifypreferredoptionstoaddresstransitbottlenecks,delays,layoverneedsandimprovetransitreliability,traveltimesandregionalmobility.Includeanalysisofapotentialtunneloption.

50,000,000$ 2028-2040 No Transit Relievefuturecongestion

MultnomahCounty,WashingtonCountyODOT 11971 US26(SunsetHighway)OperationalImprovements

I-405 WestMPOBoundary ConstructImprovementstoaddressbottlenecksandimprovesafetyonUS26(SunsetHighway)Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysis,andrefinementplanning

50,000,000$ 2028-2040 No Throughways Increasesystemefficiency

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 11of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

Region-wide Metro 11965 AdditionalCorridorInvestmentAreasActivitiesfor2028-2040

Regional Regional TheRTPidentifiesmobilitycorridorsandfuturehighcapacitytransitcapitalinvestmentsneededtosupportthe2040GrowthConcept.Corridorinvestmentareasactivitiesfocusonaligninginvestmentsaroundspecificoutcomestosupportlocalandregionalgoalsinlocationswithmultijurisdictionalinterests.InvestmentareasactivitiesincludecompletingcorridorrefinementplanninganddevelopingmultimodalprojectsinmajortransportationcorridorsidentifiedintheRTPaswellasdevelopingsharedinvestmentstrategiestoalignlocal,regionalandstateinvestmentsineconomicinvestmentareasthatsupporttheregion’sgrowtheconomy.Activitiesincludeongoinginvolvementinlocalandregionaltransitandroadwayprojectconception,funding,anddesign.Metroprovidesassistancetolocaljurisdictionsforthedevelopmentofspecificprojectsaswellascorridor-basedprogramsidentifiedintheRTP.

11,300,000$ 2028-2040 No Other Planning/coordinatemulti-jurisdictioninvestments

Region-wide Metro 11968 AdditionalRegionalMPOActivitiesfor2028-2040

Regional Regional Additionalsystemplanning,topicalplanning,andactivitiesthatMetrofortheperiod2028-2040inordertoremaincertifiedasanmetropolitanplanningorganizationbythefederalgovernmentandbeeligibletoreceiveanddistributefederaldollars

26,800,000$ 2028-2040 No Other Planning/coordinatemulti-jurisdictioninvestments

Region-wide Metro 11979 AdditionalRegionalTODInvestmentsfor2028-2040

2040Centers,stationareasandcorridors

2040Centers,stationareasandcorridors

ThecoreprogramactivityistoprovidefinancialincentivesforTODprojectstoincreasetransitridership,stimulateprivatedevelopmentofmixed-usebuildingsthatwouldotherwisenotproceed,andincreaseaffordablehousingopportunitiesinhighcostandgentrifyingneighborhoodsthroughlandacquisitionandprojectinvestments.

66,950,000$ 2028-2040 No TSMO/TDM/TOD Linklandusewithtransportationinvestments

Region-wide Metro 12011 AdditionalRegionalTravelOptionsActivitiesfor2028-2040

Regional Regional Metroawardsgrantfunding,coordinatesmarketingefforts,andprovidestechnicalassistanceandevaluationtoagenciesandorganizationstoencouragepeopletomakefewerautotrips.RTO-fundedactivitiesincludeworksiteandcollegeinformationprogramsthatmaketransit,bicycling,walkingandridesharingeasiertouse

54,418,000$ 2028-2040 No TSMO/TDM/TOD Increasetraveloptions/alt.todrivingalone

Region-wide Metro 12014 AdditionalRegionalTSMOProgramInvestmentsfor2028-2040

Regional Regional ImplementandmaintainTransportationsSystemManagementandOperations(TSMO)investmentsusedbymultipleagencies(e.g.,CentralSignalSystem,trafficsignalpriority,datacommunicationsandarchiving)andcoordinateresponsetocrashes.Theregionalprogramalsoincludesstrategyplanning(e.g.,periodicTSMOStrategyupdates),coordinationofactivitiesforTransPortsubcommitteetoTPAC,updatestotheblueprintsforagencysoftwareandhardwaresystems(ITSArchitecture),improvingtravelerinformationwithlive-streamingdataforconnectedvehicleandmobileinformationsystems(TripCheckTravelerInformationPortalEnhancement),andimproving“bigdata”processing(PSUPORTAL)tosupportanalyzingperformancemeasures.

17,773,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

Region-wide Metro 12023 AdditionalRegionalSafeRoutestoSchoolActivitiesfor2028-2040

Regional Regional ThroughtheRegionalTravelOptionsprogram,fundingisallocatedtoschooldistrictsandotherpartnerstoimplementongoingeducationalprogramsinschoolsthatencouragechildrentowalkandbicycletoschool

10,010,000$ 2028-2040 No TSMO/TDM/TOD Increasetraveloptions/alt.todrivingalone

Region-wide Metro 12026 AdditionalRegionalTSMOCorridorsPriorityInvestmentsfor2028-2040

Regional Regional ThroughtheregionalTSMOprogram,providefundingforoperatorstoworktogethertodeploysafe,integratedcorridormanagementwithadvancedtechnologyinregionalmobilitycorridorsincludingdecisionsupportsystems,real-timetravelerinformationonroutechoiceandestimatedtraveltimethatusesavarietyofdatasensors,softwareandsystems(e.g.,smartmobilityhubs,internetofthings,connectedandautomatedvehicles).Thisalsoincludesdeploymentofinnovativetechnologysystems,automatedcorridormanagement,andotheractivetrafficmanagementstrategies.

17,773,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

Region-wide ODOT 11980 ActiveTrafficManagement(ATM)andConnectedandAutomatedVehicles(CAV)Region-widePhase2

Region-wide Region-wide DeployATMrecommendationsfromtheODOTActiveTrafficManagementStrategy.PerformenhancementstoexistinginfrastructureanddeploynewinfrastructuretosupportCAVapplications.Specificprojectstobedetermined.

10,000,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 12of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

Region-wide ODOT 11982 ActiveTransportationCriticalConnectionsRegion-Wide

Region-wide Region-wide ConstructimprovementstoaddressgapsanddeficienciesintheregionalactivetransportationnetworkonODOTfacilities.SpecificprojectstobedeterminedbasedonODOTRegion1ActiveTransportationNeedsInventory.

100,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

Region-wide ODOT 11991 I-5FreightOperationalImprovements ColumbiaRiver SouthMPOBoundary ConstructimprovementstoaddressbottlenecksandimprovesafetyonI-5.Specificimprovementsasidentifiedinoperationalanalysis,mobilitycorridoranalysisandrefinementplanning.

200,000,000$ 2028-2040 No Throughways Increasesystemefficiency

Region-wide TriMet 10920 OperatingCapital:Infrastructure N/A N/A Improveoperations,possiblegradeseparation,bikeaccommodation. 25,000,000$ 2028-2040 No Transit Keepsystemingoodrepair

Region-wide TriMet 10988 Access:Park&RideFacilities Regionwide Regionwide 50-space+/-lots(oradditionstoexistinglots)incommunities.20lotsregion-wide.

20,000,000$ 2028-2040 No Transit Relievecurrentcongestion

Region-wide TriMet 11331 Access:BusAmenities Regionwide Regionwide BusstopandROWimprovementstosupportexpansionoffrequentservicebus

15,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

Region-wide TriMet 11335 OperatingCapital:Equipment N/A N/A Additionalmaintencecoststosupportexistingbussystemincludingongoingbuspurchasesasneededtomaintainandupdatefleet.

241,301,000$ 2028-2040 No Transit Keepsystemingoodrepair

WashingtonCounty Beaverton 11900 AllenBoulevardMultimodalImprovements(MurrayBoulevardtoORHighway217)

MurrayBoulevard ORHighway217 Constructturnlanes,bikelanes,sidewalks,andsignalswhereneeded. 51,200,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Cornelius 10796 HolladayStreetExtension-Central 10thAve GraySt. Constructnewcollector. 3,212,711$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

WashingtonCounty Cornelius 10797 HolladayStreetExtension-East GraySt. 19thAve. Constructnewcollector. 3,424,538$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

WashingtonCounty Cornelius 10798 DavisStreetExtension-West 4thAve 7thAve Constructnewcollector. 4,130,629$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

WashingtonCounty Cornelius 10799 DavisStreetExtension-East 19thAve 29thAve Constructnewcollector. 10,529,421$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

WashingtonCounty Cornelius 11246 CorneliusCitywideSidewalkInfill Citywide SidewalkinfillonHeatherSt(8thAve-10thAve);4thAve(3FRailroad-Barlow);and26thAve(Holladay-S.CityLimits)

1,558,648$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Cornelius 11251 N.29thAvenue 3FRailroad Baseline Improvetocollectorstandardsincludingsidewalks. 4,501,205$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

WashingtonCounty ForestGrove 10771 HighCapacityTransit:BlueLinewest:OR8extension

Hillsboro ForestGrove ProjectDevelopmentthroughROWacquisition/earlyconstructionforHighCapacityTransitprojectbetweenHillsboroandForestGrove.

30,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

WashingtonCounty ForestGrove 11479 CouncilCreekRegionalTrail:North-SouthSegment

Hillsboro ForestGrove Multi-usetrailfromForestGrovethroughWashingtonCounty,theCityofBanks,connectingtotheBanks-VernoniaStateTrail.

27,100,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty Hillsboro 10817 AloclekDrGapCompletion CorneliusPassRd AmberwoodDr CompletemissingsegmentofAloclekDrbetweenCorneliusPassRdandAmberwoodDrasthree-laneroadwithbikelanesandsidewalks

2,126,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Hillsboro 10824 CornellRdTurnLanesandBike/PedImprovements(MaintoArrington)

MainSt ArringtonRd Widenroadwayfromfourtofivelaneswithbike/pedfacilites 9,830,624$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Hillsboro 10827 QuatamaRdTurnLanesandBike/PedGaps CorneliusPassRd 205thAve Widenroadwaytoaddcenterturnlaneandcompletemissingsidewalksandbikelanes

1,913,400$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Hillsboro 10830 JohnsonStTurnLanesandBike/PedImprovements

CenturyBlvd CorneliusPassRd Widenroadwaytoaddcenterturnlane,bikelanes,andsidewalks 8,504,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Hillsboro 10832 QuatamaRdImprovementsand69thAveExtension

CorneliusPassRd 69thAve WidenQuatamafromCorneliusPassRdto69thAveandconstructmissingsegmentof69thAvefromQuatamasouthasthree-laneroadwaywithbike/pedfacilities;upgradebridgeoverRockCreek

1,913,400$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Hillsboro 11090 CornellRdBikeLanes ArringtonRd 25thAve Widenroadwaytoaddbikelanes 5,038,620$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11141 BrogdenStExtensionandBike/PedImprovements

28thAve BrookwoodPkwy Extendroadwayfrom43rdAvetoBrookwood;widentoprovidebike/pedfacilitiesfrom28thtoBrookwood;newtrafficsignalatBrookwood

3,189,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 13of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

WashingtonCounty Hillsboro 11145 AirportRdBike/PedGaps BrookwoodPkwy 48thAve Completemissingbikelanesandsidewalk 1,594,500$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11149 HelvetiaRdTurnLanesandBike/PedImprovements

SchaafRd WestUnionRd Widenroadwaytothreelanes(onethroughlaneineachdirectionandcenterturnlane)withbike/pedfacilities

4,252,000$ 2028-2040 No RoadsandBridges

Servenewurbanarea

WashingtonCounty Hillsboro 11150 JacobsonRdTurnLanesandBike/PedImprovements

HelvetiaRd CenturyBlvd Widenroadwayfromtwotothreelanes(addcenterturnlane);completebike/pedfacilities;reconfigureintersectionwithHelvetiaRdtoright-in,right-outonly

2,657,500$ 2028-2040 No RoadsandBridges

Increasefreightaccesstoindust&intermodalfac

WashingtonCounty Hillsboro 11151 BentleyStBike/PedImprovements 32ndAve BrookwoodAve Constructsidewalksandbufferedbikelanes 3,189,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11155 DrakeStTurnLanesandBike/PedImprovements(East)

ImlayAve 67thAve Constructcenterturnlaneandaddbike/pedfacilities 1,913,400$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Hillsboro 11156 DrakeStTurnLanesandBike/PedImprovements(West)

BrookwoodAve ImlayAve Constructcenterturnlaneandaddbike/pedfacilities 1,594,500$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Hillsboro 11157 ImlayAveBike/PedImprovements TVHwy LoisSt Completesidewalkgapsandconstructbikelanes 2,126,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11158 206thAveBike/PedImprovements BaselineRd RockRd Completesidewalkgapsandconstructbikelanes 3,189,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11159 AlexanderStBike/PedImprovements BrookwoodAve 56thCt Completebikelaneandsidewalkgaps 1,063,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11160 WitchHazelRdBike/PedImprovements RiverRd BrookwoodAve Completebikelaneandsidewalkgaps 1,063,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11161 RoodBridgeRdBike/PedImprovements RiverRd PipersDr(UGB) Constructsidewalksandbikelanes 2,657,500$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11162 24thAveBike/PedImprovements MainSt MapleSt Widenroadwaytoprovidebike/pedfacilitiesincludingbridgeoverTurnerCreek

4,252,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11164 17thAveBike/PedImprovements CornellRd SunriseLn Widenroadwaytoprovidebike/pedfacilities 1,063,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11278 AmberGlen/NorthHillsboroStreetcar,Phase1

QuatamaMAXStation Proposed"EvergreenTransitCenter"(atEvergreen&194th)

ConstructhighcapacitytransitfromQuatamaMAXstationthroughAmberGlen/TanasbourneRegionalCenter;providelocalmatchfundingtoleveragefederalfundsforstreetcarextensionthroughAmberglen;continueworkaspartoftheHCTsystemexpansionpolicy;nextphasecorridorasidentifiedintheHCTsystemplanandadoptedbyJPACTandMetroCouncil;alsoseeproject11573

25,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

WashingtonCounty Hillsboro 11279 US26&185thAveInterchangeRefinementStudyandImplementation

N/A N/A Conductinterchangerefinementstudyandimplementation 26,575,000$ 2028-2040 No Throughways Relievefuturecongestion

WashingtonCounty Hillsboro 11280 RonlerDrExtension CorneliusPassRd 215thAve Constructthree-laneextensionwithbike/pedfacilities 1,000,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

WashingtonCounty Hillsboro 11282 MinterBridgeRdBike/PedImprovements RiverRd MorganRd(UGB) Completebike/pedfacilities 2,126,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Hillsboro 11341 WestUnionRdWideningandImprovements HelvetiaRd CorneliusPassRd WidentothreelanesfromHelvetiatoCentury,andfivelanesfromCenturytoCorneliusPass,includingbike/pedfacilitiesalongentirelength

12,000,000$ 2028-2040 No RoadsandBridges

Servenewurbanarea

WashingtonCounty Hillsboro 11389 ImbrieDrWidening EvergreenPkwy CorneliusPassRd Widenfromthree(onewestbound,oneeastbound,onecenterturnlane)tofourlanes(onewestbound,twoeastbound,onecenterturnlane)throughadditionofoneeastboundlane

2,657,500$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty Hillsboro 11392 TVHwy&RiverRdIntersectionImprovements

N/A N/A Constructeastboundright-turnlaneandsecondnorthboundleft-turnlane;modifytrafficsignal;improvebikeandpedcrossingofTVHwy

2,126,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 14of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

WashingtonCounty Hillsboro 11573 AmberGlen/NorthHillsboroStreetcar,Phase2

Proposed"EvergreenTransitCenter"atEvergreen&194th

HillsboroStaduim,IntelRonlerAcres,OrencoStation

ExtendhighcapacitytransitfromAmberGlen/TanasbourneRegionalCentertoHillsborostadium,IntelRonlerAcres,andOrencoStation;providelocalmatchfundingtoleveragefederalfundsforLRTextension;continueworkaspartoftheHCTsystemexpansionpolicy;nextphasecorridorasidentifiedintheHCTsystemplanandadoptedbyJPACTandMetroCouncil;alsoseeproject11278

50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

WashingtonCounty Hillsboro 11912 SunsetHwyHighCapacityTransit SunsetTransitCenter FairComplex/HillsboroAirportMAXStation

StudyandimplementationofhighcapacitytransitfromSunsetTransitCentertoFairComplex/HillsboroAirportMAXStationviaUS26

50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

WashingtonCounty KingCity 11946 FisherRd.Extension RoyRogersRd. KingLearWy. Constructnew2laneCollectorRdwithsidewalksbikelanes,streetlightingandtrafficsignalsatkeyintersections

21,200,000$ 2028-2040 No RoadsandBridges

Servenewurbanarea

WashingtonCounty ODOT 11302 I-5/OR217InterchangePhase2 I-5/OR217Interchange N/A I-5/OR217InterchangePhase2-southboundOR217tosouthboundI-5entranceramp;southboundI-5exittoKruseWayloopramp.

53,000,000$ 2028-2040 No Throughways Relievecurrentcongestion

WashingtonCounty ODOT 11582 OR217CapacityImprovements US26(SunsetHwy) I-5 Constructasa6-lanefreeway,adding3rdthroughlaneineachdirection,andcompleteinterchangereconstructionwithrampandovercrossingimprovements

398,500,000$ 2028-2040 No Throughways Relievecurrentcongestion

WashingtonCounty ODOT 11976 OR217NorthboundAuxiliaryLaneExtensionSchollsFerrytoAllen/Denney

SchollsFerryRoad Allen/DenneyInterchange

ExtendOR217auxiliarylanefromSchollsFerrytoAllen/Denneyinterchangebyfillingintheexistingauxiliarylaneandmodifyingrelatedrampconnections

50,000,000$ 2028-2040 No Throughways Increasesystemefficiency

WashingtonCounty ODOT 11978 OR217Interchange,Safety,andOperationalImprovements

US26(SunsetHighway) I-5 DesignandconstructimprovementstoOR217betweenUS26andAllen/Denneyinterchangetoimprovesafety,reliabilityandmobility

75,000,000$ 2028-2040 No Throughways Increasesystemefficiency

WashingtonCounty Sherwood 10684 CedarBrookWay 99W ElwertRd ConstructcollectorstatusroadbetweenSWElwertRd@intersectionwithSWHandleyStandSWPacificHwy(OR99W).

6,000,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty Sherwood 10689 OldTownArterials-Collectors SW3rdSt SWWillametteSt CompletearterialsandcollectorstreetswithinoldtownoverlayperCityTSP.

5,800,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Sherwood 10698 SunsetBlvd. SWAldergroveAve SWEucalyptusLane Reconstructroadto3lanearterialstandardsinsectionsnotalreadytoTSPsectionforarterial.FixverticalcrestsightdistanceissueatPineStintersection.PossiblesignalorroundaboutatSunset/Main/LaddHillandcompletestreetstowestofSWMainSt.

8,300,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Sherwood 10700 ArrowStreetImprovements SWLangerFarmsParkway

SWGerdaLane Construct3-lanecollectorstreettoTSPstandardsbetweenSWLangerFarmsParkwayandSWGerdaLane.

8,200,000$ 2028-2040 No RoadsandBridges

Linklandusewithtransportationinvestments

WashingtonCounty Sherwood 10703 PedestrianLinkstoSchools&TownCenter Various various Pedestrianupgrades,newsidewalks,sidewalkinfillat:Sunset,Division,Edy,Elwert,Meinecke,Pine,Roy,LaddHill,Timbrel,Washington,Willamette,OldPacificHwy.

7,300,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty Sherwood 10707 OR99WRegionalTrailCrossing SWPacificHwy.(westside)

SWPacificHwy.(eastside)

ConstructsseparatedgradecrossingforCedarCreekTrail(regionaltrailsystem)underSWPacificHwy(OR99W).The$15.9Mcostestimateincludesraisinghighwaygradestoprovideforopenundercrossingcoupledwithstreamenhancementstocreateamoreopenandnaturalundercrossingw/adjacentnaturalstream.Thiswillimprovedownstreamconveyanceduringlargestormevents,aswellasconnectwildlifecorridorscurrentlybisectedbySWPacificHighway.

15,900,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty Sherwood 11614 PineStPhase2 SWDivisionSt SWSunsetBlvd ReconstructSWPineSttothe2-lanecollectorstandardperCityTSP.Existingstreetis2-lanesw/non-ADAcompliantsidewalksandthisprojectwillimprovestormdrainageandaddressADAissues,butnotaddanycapacityincreasingfeatures(i.e.notravelorturnlanesadded,nobikelanes,nomajorsidewalkadditions).

2,100,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty Sherwood 11660 Century-LangerIntersectionImprovements CenturyDr LangerDr Improveintersectioncapacityandsafety.PossibleroundaboutatCenturyDr.RestrictLangermovementstoright-in/right-out,possibleEBleft-in.InTSP.CanbecombinedwithRTP10691.

2,100,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

WashingtonCounty THPRD 10809 BronsonCreekTrail(Community) BronsonCreekParkCornellRd.(THPRD)

NWLaidlawRd.atNWSaltzmanRd.

Todesignandconstructacommunitytrailsegmentinagreenwaycorridor,10'widepaved.

8,682,500$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 15of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

WashingtonCounty THPRD 11406 FannoCreekTrailBridge(Regional) northsideofHallBlvd. southsideofHallBlvd. Wouldavoidout-of-directionbike/pedtripsonamajorregionaltrailthatisotherwisecompleteinthisarea.

5,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty THPRD 11941 TurftoSurfRegionalTrail SW194thAve/T.V.Hwy BeavertonCreekTrailatSWEricksonAve.

Designandconstructaregionalmulti-usetrail,12'-14'wide 12,500,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty THPRD 11942 WaterhouseCommunityTrailConnection,Segment9

THPRDboundary SWSpringvilleRd.justwestofSickleTerr.

Designandconstructa10'widecommunitymulti-usetrailtoconnectNorthBethanyresidentstoWestsideandRockCreekRegionalTrails.

2,325,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty THPRD 11944 SouthCooperLoopTrail SWGrabhornRd.justnorthofSchollsFerryRd.

SW175thAve Designandconstructa12'wideregionalmulti-usetrail. 13,200,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty Tigard 10747 OR217Bike/PedOvercrossing-CascadePlaza

NimbusorCascade SchollsFerry Newpedestrianandbicyclebridgerunningeast/westoverHwy217fromNimbusorCascadetoSchollsFerryRoad(eastof217)onthenorthsideofWashingtonSquareRegionalCenter.

3,700,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty Tigard 10756 72ndAve.Improvements-HunzikertoBonita HunzikerRoad BonitaRoad Widento3laneswithbikewaysandsidewalks 12,800,000$ 2028-2040 No ActiveTransportation

Increaseaccesstojobs

WashingtonCounty Tigard 10757 72ndAve.Improvements-BonitatoDurham BonitaRoad DurhamRoad Widento3laneswithbikewaysandsidewalks 6,400,000$ 2028-2040 No ActiveTransportation

Increaseaccesstojobs

WashingtonCounty Tigard 10768 DurhamRd/UpperBoonesFerryIntersectionImprovements

DurhamRoad I-5 ConstructintersectionimprovementsatDurhamRoadandUpperBoonesFerryRoadtoprovidedualsouthboundright-turns,dualeastboundleft-turns,eastboundright-turns,existingandimprovesignaltiming.InstallbikelanesonbothsidesofthestreetsfromjustsouthofDurhamRdtojustnorthofDurhamRd.

5,000,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

WashingtonCounty Tigard 10770 OR99WIntersectionImprovements(PE) 64thAve. DurhamRd. Projectdevelopmentphase:Provideincreasedcapacityatpriorityintersections,includingbusqueuebypasslanesinsomelocations,improvedsidewalks,prioritypedestriancrossings,andanaccessmanagementplan,whileretainingexisting4/5-lanefacilityfromI-5toDurhamRoad.See2035TigardTSPProject#66forspecificimprovements.

5,000,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

WashingtonCounty Tigard 11225 DowntownCirculationPlanImplementation DowntownTigard BetweenHwy.99W,Hall&FannoCreek

AcquireROW,constructstreetsandstreetscapeimprovementsindowntownTigard

4,300,000$ 2028-2040 No RoadsandBridges

Increaseaccesstoopport.forhist.marg.comm.

WashingtonCounty Tigard 11666 OR99WIntersectionImprovements(CON) 64thAve. DurhamRd. Constructionphase:Provideincreasedcapacityatpriorityintersections,includingbusqueuebypasslanesinsomelocations,improvedsidewalks,prioritypedestriancrossings,andanaccessmanagementplan,whileretainingexisting4/5-lanefacilityfromI-5toDurhamRoad.See2035TigardTSPProject#66forspecificimprovements.

25,000,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

WashingtonCounty Tigard 12015 OR217Ped/BikeOvercrossing-NDakotatoPfaffle

NorthDakotaat217 HallBlvdnearoratPfaffle

Pfaffle-NorthDakotaeast-westconnectionwithHwy217ped/bikeover-crossingtoprovideaneighborhoodroute

5,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty Tigard 12041 OR217Ped/BikeOvercrossing-WashSqRegionalCenter

LocustSt CascadeAve,NimbusAve,orFannoCreekTrail

ProvidePed/bikebridgeoverHwy217fromWashingtonSquareRegionalCenterfromLocustSttoCascadeAve,NimbusAve,orFannoCreekRegionalTrail

5,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty TriMet 10900 HCT:WESDoubleTrackingandFrequencyUpgrades

BeavertonTransitCenter Wilsonville CommuterRailfrequencyandspanofserviceimprovements.WillrequirecapitalimprovementsincludingdoubletrackingandDMUs.

400,000,000$ 2028-2040 No Transit Relievefuturecongestion

WashingtonCounty Tualatin 10712 BoonesFerry Martinazzi LowerBoonesFerry Reconstruction/widento5-lanesfromMartinazzitoLowerBoonesFerryRoad,includeswideningbridgeoverTualatinRiver.

18,940,534$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

WashingtonCounty Tualatin 10717 CipoleStreetReconstruction OR99W Tualatin-Sherwood Reconstruct/widento3lanesfrom99WtoTualatin-SherwoodRoadandincludeshared-usepathfortheIceAgeTonquinTrail,includessignalatCipoleandHerman.TheprojectoraportionoftheprojectisoutsidethedesignatedurbangrowthboundaryasofMarch2014.

21,291,890$ 2028-2040 No RoadsandBridges

Increaseaccesstojobs

WashingtonCounty Tualatin 10739 Nyberg Tualatin-Sherwood 65th AddbikelanesonNybergfromI-5to65th. 7,441,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 16of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

WashingtonCounty Tualatin 10742 108thAve. TualatinRiverGreenwayTrail-SouthBankoftheTualatinRiver

TualatinRiverGreenwayTrail-NorthBankoftheTualatinRiver

PedestrianbridgeoverTualatinRiverandconnectingpaths. 2,587,342$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Tualatin 10743 OR99WSidewalks SouthCityLimits NorthCityLimits InstallsidewalksfromCipoletoTualatinRiver. 11,055,200$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Tualatin 11420 Nyberg I-5on-ramp I-5on-ramp Addanadditionalon-ramplaneforvehiclestravelingwestboundonSWNybergStreettoI-5northbound(northeastquadrantoftheNybergInterchange).Reducethepedestrianislandandimproveilluminationtoenhancesafety.

1,138,473$ 2028-2040 No Throughways Relievecurrentcongestion

WashingtonCounty Tualatin 11427 IceAgeTonquinTrail 112th Tualatin/BoonesFerry Constructshared-usepath 24,135,415$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Tualatin 11429 Sagert I-5 I-5 AddsidewalksonI-5bridgeoverpass 5,673,203$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Tualatin 11432 I-5Path LowerBoonesFerryRoad Norwood Constructshared-usepathparalleltoI-5 3,449,435$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty WashingtonCounty 10557 Murray/TVHwy.Intersection FarmingtonRd. TVHwy. IntersectionimprovementatTVHwy.andFarmingtonwithMurrayBlvd. 26,600,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

WashingtonCounty WashingtonCounty 10572 BarnesRd.Improvements St.Vincent'sHosp.entrance

LeahyRd. Widenfromtwotofivelaneswithbikelanesandsidewalks. 9,500,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

WashingtonCounty WashingtonCounty 10573 BarnesRd.Improvements LeahyRd. Multnomah.Co.Line Widenfromtwotothreelaneswithbikelanesandsidewalks. 18,400,000$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 10580 ButnerRd.Improvements MurrayBlvd. CedarHillsBlvd. Widento3laneswithbikelanesandsidewalks. 19,700,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 10586 197th/198thAve.Improvements BaselineRd. T.V.Hwy. Addsidewalks,bikelanes,lighting,turnlanesatmajorintersections. 20,500,000$ 2028-2040 No ActiveTransportation

Relievefuturecongestion

WashingtonCounty WashingtonCounty 10589 95thAve.Ped/BikeConnection MorrisonSt. SunsetTC Pedestrian/bicyclepathway,lighting,bridgeoverJohnsonCreek,grade-separatedcrossingofBarnesRoad.

12,300,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 10591 GlencoeRd.Improvements EvergreenRd. JacksonAve. Widentothreelaneswithbikelanesandsidewalks. 27,700,000$ 2028-2040 No RoadsandBridges

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 10593 KinnamanRd.Improvements 209thAve. FarmingtonRd. Reconstructwithsidewalks,bikelanesandturnlanesatmajorintersecions;consolidateoffsetintersectionat198thAve.

28,500,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty WashingtonCounty 10596 SchollsFerryRd.Improvements Hwy.217 121stAve. Widentosevenlaneswithbikelanesandsidewalks. 21,000,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

WashingtonCounty WashingtonCounty 10598 SouthernArterial Hwy.99W I-5 PurchaseROW.Construct2/3lanearterialwithbikelanesandsidewalks. 116,000,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 10599 OR217/72ndAve.InterchangeImprovements

OR217/72ndAvenue OR217/72ndAvenue Completeinterchangereconstructionwithadditionalrampsandbridgestructurereplacement

21,300,000$ 2028-2040 No Throughways Relievefuturecongestion

WashingtonCounty WashingtonCounty 10606 WashingtonSquareRegionalCenterPedestrianImprovements

Wash.Sq.RegionalCenter

Complete7400feetofsidewalkimprovements. 9,500,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 10607 SunsetTCStationCommunityPedestrianImprovements

SunsetTCStationCommunity

Sidewalks,pedestriancrossings,accessways,ped/bikebridgesovercreeks.

6,400,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 10614 ButnerRd.Bike CedarHillsBlvd. ParkWay Completes7800feetofbikelanestotransitcorridor. 3,700,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 10615 BronsonRd.BikeLanes 185thAve. BethanyBlvd. Completes15000feetofbikelanestotransitcorridor. 5,800,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 11045 185thAvenue/MAXGradeSeparation 185thAvenue BaselineRoad Gradeseparate185thAvenue/BaselineRoadintersectionandMAXline. 26,256,000$ 2028-2040 No RoadsandBridges

Increasesystemefficiency

WashingtonCounty WashingtonCounty 11436 East-WestArterialOvercrossing BoonesFerryRd EastofI-5 Extendnew4-laneovercrossingoverI-5fromBoonesFerryRdto65thandStaffordRd.

40,400,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 17of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

WashingtonCounty WashingtonCounty 11446 WashingtonCountyITS/TSMO(Strategic) County-wide County-wide Conductprojectdevelopment,preliminary/systemengineering,design,construct,andintegratethefollowingITSprojectsCountywideonkeyfreight,transit,andcommutercorridors:AdvancedTrafficControllers,Next-GenerationEmergencyVehiclePreemption&TransitSignalPriority,TrafficSignalModernization,RoadsideConnectedVehicle&InternetofThingsSystem,AutonomousVehicleEnablingSystems,AutomatedTrafficSignalPerformanceSystem,TrafficIncidentManagement

16,000,000$ 2028-2040 No TSMO/TDM/TOD Increasesystemefficiency

WashingtonCounty WashingtonCounty 11456 ShackelfordRd 185thAve. Bridge Buildnew3laneroadwithbike/pedfacilities,stormdrainage,streetlightingtoserveNorthBethany.

12,800,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11457 ShackelfordRdBridge Buildnew3laneroadwithbike/pedfacilities,stormdrainage,streetlightingtoserveNorthBethany

15,600,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11460 OR10:OlesonRd.ImprovementPh.2 Beaverton-HiilsdaleHwy. OlesonRd.andSchollsFerry

Beaverton-Hillsdale/Oleson/SchollsFerryPhase2improvementstoproject10545

40,000,000$ 2028-2040 No RoadsandBridges

Reducecrashes

WashingtonCounty WashingtonCounty 11466 LaidlawImprovements SkycrestPkwy. LakeviewDr. Straightencurves,widento3laneswithbikelanesandsidewalks. 10,600,000$ 2028-2040 No RoadsandBridges

Reducecrashes

WashingtonCounty WashingtonCounty 11469 124thAveImprovements Tualatin-SherwoodRd. GrahamsFerryRd Widen124thfrom2lanesto5laneswithbikelanesandsidewalks 14,900,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11472 160thAveImprovements TVHwy. FarmingtonRd. Widentothreelaneswithbikelanesandsidewalks. 15,900,000$ 2028-2040 No RoadsandBridges

Relievecurrentcongestion

WashingtonCounty WashingtonCounty 11473 111th/RainmontRd/113thAve McDanielRd CornellRd. Constructsidewalks 9,600,000$ 2028-2040 No ActiveTransportation

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11474 113thAve McDanielRd RainmontRd Constructnew2laneCollectorRdwithsidewalksbikelanesandstreetlighting

6,400,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11478 185th ShackelfordRd. SpringvilleRd. Widenfromtwolanestothreelaneswithbikelanesandsidewalks. 60,600,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11490 DayRdOvercrossing BoonesFerryRd ElligsenRd Extendnew4-laneovercrossingoverI-5fromBoonesFerryRdtoElligsenRd.

46,900,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11574 CornellRoad 107th CountyLine Widenfrom2tothreelaneswithsidewalks,bikelanes,streetlighting,andcommunityfeatures

22,300,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty WashingtonCounty 11575 Leahy CornellRd. BarnesRd. Constructsidewalks 2,700,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 11576 BullMountainRd RoyRogersRd. OR99W Widentothreelaneswithbikelanesandsidewalks. 36,100,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11577 BeefBendRd RoyRogers HWY99W Widentothreelaneswithbikelanesandsidewalks. 41,900,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11578 80thAve OlesonRd OakSt Addsidewalks,bikelanes,lighting,turnlanesatmajorintersections. 13,800,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 11579 119thAve McDanielRd CornellRd. Addsidewalks,bikelanes,lighting,turnlanesatmajorintersections. 12,800,000$ 2028-2040 No ActiveTransportation

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11580 McDanielRd 119thAve. CountyLine Addsidewalks,bikelanes,lighting,turnlanesatmajorintersections. 22,300,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty WashingtonCounty 11737 Cornell@185thIntersectionImprovements 185thAve. CornellRd Prioritizenear-termimprovementssuchassignaltiming,transitprioritization,trafficoperations,monitoring,andspecificturnlaneconfigurations.Intersectionimprovements(and/orotherreasonablereplacementimprovements)aretobeimplementedandprioritizedasfundingallows.If,aftersuchimprovementshavebeenconsideredandmotorvehicletrafficcongestionbecomesunacceptable,thentheseintersectionscouldbeconsideredascandidatesforgradeseparationand/orotherimprovementstomeettravelneeds.

22,300,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

2018RegionalTransportationPlan DRAFTAdditionalStrategicPrioritiesProjectListProjectsarelistedalphabeticallybyCountyandnominatingagency.

DownloadedfromRTPProjectHubon10/17/17. 18of18 Formoreinformation,visitthe2018RTPprojectpageatoregonmetro.gov/2018projects.

CountyNominatingAgency

2018RTPID ProjectName StartLocation EndLocation Description

EstimatedCost(2016dollars)

TimePeriod

ProjectisonFinanciallyConstrainedprojectlist

RTPInvestmentCategory PrimaryPurpose

WashingtonCounty WashingtonCounty 11738 Walker@185thIntersectionImprovements 185thAve. WalkerRd. Prioritizenear-termimprovementssuchassignaltiming,transitprioritization,trafficoperations,monitoring,andspecificturnlaneconfigurations.Intersectionimprovements(and/orotherreasonablereplacementimprovements)aretobeimplementedandprioritizedasfundingallows.If,aftersuchimprovementshavebeenconsideredandmotorvehicletrafficcongestionbecomesunacceptable,thentheseintersectionscouldbeconsideredascandidatesforgradeseparationand/orotherimprovementstomeettravelneeds.

22,300,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11923 GrahamsFerryRoad(HeleniustoTonquin) HeleniusSt TonquinRd Widenroadwayto3lanes,includessidewalksandbikelanes 4,000,000$ 2028-2040 No RoadsandBridges

Buildcompletestreet

WashingtonCounty WashingtonCounty 11924 GrahamsFerryRoad(TonquintoDay) TonquinRd. DayRd. Widenroadwayto5lanes,includessidewalksandbikelanes 6,000,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11925 Beaverton-HillsdaleHwyBikeLanes OR217 MultnomahCountyLine Completes12,000feetofbikelanes. 2,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 11926 CanyonRoadand110thBikeLanes Beaverton-HillsdaleHwy. 91stAve Completes7,000feetofbikelanes. 2,500,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 11927 ShawStreetMulti-UseTrailOverpass 185thAve 185thAve Designandconstructamulti-useregionaltrail10-12ftwideover-crossingof185thAve

5,100,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 11930 BrookmanRd OR99W LaddHillRd Widento4/5lanearterialstandard 20,000,000$ 2028-2040 No RoadsandBridges

Relievefuturecongestion

WashingtonCounty WashingtonCounty 11970 TransitPriorityonFrequentServiceRoutes County-wide County-wide Providequeuejumps,signalpreemptionforfrequentserviceroutes 50,000,000$ 2028-2040 No Transit Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 12039 Bikelanesandsidewalksoncollectorsandarterials

Countywide Countywide Complete35milesofbikelanesandsidewalksonCountyarterialsandcollectors

220,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty WashingtonCounty 12049 WashingtonCountyNeighborhoodBikeways WashingtonCounty WashingtonCounty 3milesofneighborhoodbikeways(bikeboulevards)onlow-trafficstreetsthroughoutunincorporatedurbanWashingtonCounty,includingenhancedat-gradecrossingsofarterials.

2,000,000$ 2028-2040 No ActiveTransportation

Increasetraveloptions/alt.todrivingalone

WashingtonCounty Wilsonville 11798 ElligsenRoadUrbanUpgrade ParkwayCenterDrive 65th Reconstructstreetto3laneswithbufferedbikelanesandsidewalks.(TSPprojectUU-P3)

6,000,000$ 2028-2040 No ActiveTransportation

Buildcompletestreet

WashingtonCounty Wilsonville 11809 JavaRoadConnectionandSignal GrahamsFerryRoad GardenAcresRoad ConstructnewJavaRoadwithbufferedbikelanesandsidewalks,disconnectClutterStreetfromGrahamsFerryRoad,andinstalltrafficsignalatGrahamsFerryRoad.

1,500,000$ 2028-2040 No RoadsandBridges

Increaseaccesstojobs