The TAV experience: the The TAV experience: the relationship between awarding relationship between awarding authority and General authority and General Contractor Contractor
Antonio Savini Nicci Antonio Savini Nicci Managing Director of TAVManaging Director of TAV
The TAV experience: the The TAV experience: the relationship between awarding relationship between awarding authority and General authority and General Contractor Contractor
Antonio Savini Nicci Antonio Savini Nicci Managing Director of TAVManaging Director of TAVMilano 8 th november 2005Milano 8 th november 2005Milano 8 th november 2005Milano 8 th november 2005
2/62/6
8 november 20058 november 2005
The TAV Project: Work in ProgressThe TAV Project: Work in Progress630 km between Turin, Milan e Naples
186 km ready to enter in operation between Roma-Napoli 86 km ready to enter in operation
between Torino-Novara358 km under construction betwen
Milano- Bologna-Firenze - 140 km of new tunnels - 225 km of new viaducts, bridges 58 km interconnections with existing lines Torino-Milano-Napoli241 km MI-VR-PD e Terzo Valico: - 112 km Milano-Verona line currently in the approval phase - 54 km Terzo Valico line currently in the
approval phase - 75 km Verona-Padova line currently in the design stage
630 km between Turin, Milan e Naples186 km ready to enter in operation between Roma-Napoli 86 km ready to enter in operation
between Torino-Novara358 km under construction betwen
Milano- Bologna-Firenze - 140 km of new tunnels - 225 km of new viaducts, bridges 58 km interconnections with existing lines Torino-Milano-Napoli241 km MI-VR-PD e Terzo Valico: - 112 km Milano-Verona line currently in the approval phase - 54 km Terzo Valico line currently in the
approval phase - 75 km Verona-Padova line currently in the design stage
2005 december year when the Rome-Naples line will enter in to operation 2006 february year when the Turin-Novara line will enter in to operation 2006/2009 entry in to operation of the other lines
2005 december year when the Rome-Naples line will enter in to operation 2006 february year when the Turin-Novara line will enter in to operation 2006/2009 entry in to operation of the other lines
3/63/6
8 november 20058 november 2005
TAV SPA TAV SPA
Ferrovie dello Stato Ferrovie dello Stato HoldingHolding
Parent CompanyParent Company
Ferrovie dello Stato Ferrovie dello Stato HoldingHolding
Parent CompanyParent Company
RFIRFIManagement and Management and investment in investment in railway railway infrastructureinfrastructure
RFIRFIManagement and Management and investment in investment in railway railway infrastructureinfrastructure
TAVTAVTAVTAV
GENERAL GENERAL CONTRACTORCONTRACTOR
For the legs For the legs (direct (direct
assignment)assignment)
GENERAL GENERAL CONTRACTORCONTRACTOR
For the legs For the legs (direct (direct
assignment)assignment)
IMPRESE IMPRESE APPALTATRICIAPPALTATRICI
For urban For urban junctions junctions (international (international tenders)tenders)
IMPRESE IMPRESE APPALTATRICIAPPALTATRICI
For urban For urban junctions junctions (international (international tenders)tenders)
TRENITALIATRENITALIAManages transport Manages transport servicesservices
TRENITALIATRENITALIAManages transport Manages transport servicesservices
Other Other companicompani
eses
Other Other companicompani
eses
Other Other companiecompanie
ss
Other Other companiecompanie
ss
4/64/6
8 november 20058 november 2005
General Contractors of project TAV General Contractors of project TAV
Roma-Napoli: IRICAV UNORoma-Napoli: IRICAV UNORoma-Napoli: IRICAV UNORoma-Napoli: IRICAV UNO
Bologna-Firenze: FIAT/CAVETBologna-Firenze: FIAT/CAVETBologna-Firenze: FIAT/CAVETBologna-Firenze: FIAT/CAVET
Milano-Bologna:CEPAV Milano-Bologna:CEPAV UNOUNO
Milano-Bologna:CEPAV Milano-Bologna:CEPAV UNOUNO
Milano-Verona: CEPAV Milano-Verona: CEPAV DUEDUE
Verona-Venezia: IRICAV Verona-Venezia: IRICAV DUEDUE
Milano-Verona: CEPAV Milano-Verona: CEPAV DUEDUE
Verona-Venezia: IRICAV Verona-Venezia: IRICAV DUEDUE
Milano-Genova: COCIVMilano-Genova: COCIVMilano-Genova: COCIVMilano-Genova: COCIV
Torino-Milano: FIAT/CAV.TO.MI.Torino-Milano: FIAT/CAV.TO.MI.Torino-Milano: FIAT/CAV.TO.MI.Torino-Milano: FIAT/CAV.TO.MI.
5/65/6
8 november 20058 november 2005
Activities of the General ContractorActivities of the General Contractor
Engineering design Construction
Engineering design Construction
Preparation of final engineering designs
Preparation of detailed engineering designs
Reference document: Handover agreement
Preparation of final engineering designs
Preparation of detailed engineering designs
Reference document: Handover agreement
Completion of the works in accordance with the approved final engineering designs
Reference document: Supplementary agreement including:
o All-inclusive priceo Schedule of works
o Completion date for works
Completion of the works in accordance with the approved final engineering designs
Reference document: Supplementary agreement including:
o All-inclusive priceo Schedule of works
o Completion date for works
o perform any investigations and surveys needed in order to prepare the final engineering designs; o resolve all interference with utility networks; o perform expropriation and occupancy procedures;o manage the works; o resolve disputes with third parties regarding performance of the works;o participate in testing and pre-operating activities.
o perform any investigations and surveys needed in order to prepare the final engineering designs; o resolve all interference with utility networks; o perform expropriation and occupancy procedures;o manage the works; o resolve disputes with third parties regarding performance of the works;o participate in testing and pre-operating activities.
Other activities:
: Other activities:
:
6/66/6
8 november 20058 november 2005
Project owner and G.C.: issues and Project owner and G.C.: issues and solutionssolutions
Principal issueso extended length of the authorisation phase;o requests from local bodies for changes or ancillary works in addition to those envisaged during the project approval phase;o resolution of interference with other utility networks.
Solutionso clarification of the role of the General Contractor;o simplification and acceleration of the authorisation phase;o limitations on requests for design changes;o formalisation of collaboration requirements applying to utility network managers.
Principal issueso extended length of the authorisation phase;o requests from local bodies for changes or ancillary works in addition to those envisaged during the project approval phase;o resolution of interference with other utility networks.
Solutionso clarification of the role of the General Contractor;o simplification and acceleration of the authorisation phase;o limitations on requests for design changes;o formalisation of collaboration requirements applying to utility network managers.