1/6 8 november 2005 The TAV experience: the The TAV experience: the relationship between relationship between awarding authority and awarding authority and General Contractor General Contractor Antonio Savini Nicci Antonio Savini Nicci Managing Director of TAV Managing Director of TAV Milano 8 th november 2005 Milano 8 th november 2005

1/68 november 2005 The TAV experience: the relationship between awarding authority and General Contractor Antonio Savini Nicci Managing Director of TAV

Embed Size (px)

Citation preview

1/61/6

8 november 20058 november 2005

The TAV experience: the The TAV experience: the relationship between awarding relationship between awarding authority and General authority and General Contractor Contractor

Antonio Savini Nicci Antonio Savini Nicci Managing Director of TAVManaging Director of TAV

The TAV experience: the The TAV experience: the relationship between awarding relationship between awarding authority and General authority and General Contractor Contractor

Antonio Savini Nicci Antonio Savini Nicci Managing Director of TAVManaging Director of TAVMilano 8 th november 2005Milano 8 th november 2005Milano 8 th november 2005Milano 8 th november 2005

2/62/6

8 november 20058 november 2005

The TAV Project: Work in ProgressThe TAV Project: Work in Progress630 km between Turin, Milan e Naples

186 km ready to enter in operation between Roma-Napoli 86 km ready to enter in operation

between Torino-Novara358 km under construction betwen

Milano- Bologna-Firenze - 140 km of new tunnels - 225 km of new viaducts, bridges 58 km interconnections with existing lines Torino-Milano-Napoli241 km MI-VR-PD e Terzo Valico: - 112 km Milano-Verona line currently in the approval phase - 54 km Terzo Valico line currently in the

approval phase - 75 km Verona-Padova line currently in the design stage

630 km between Turin, Milan e Naples186 km ready to enter in operation between Roma-Napoli 86 km ready to enter in operation

between Torino-Novara358 km under construction betwen

Milano- Bologna-Firenze - 140 km of new tunnels - 225 km of new viaducts, bridges 58 km interconnections with existing lines Torino-Milano-Napoli241 km MI-VR-PD e Terzo Valico: - 112 km Milano-Verona line currently in the approval phase - 54 km Terzo Valico line currently in the

approval phase - 75 km Verona-Padova line currently in the design stage

2005 december year when the Rome-Naples line will enter in to operation 2006 february year when the Turin-Novara line will enter in to operation 2006/2009 entry in to operation of the other lines

2005 december year when the Rome-Naples line will enter in to operation 2006 february year when the Turin-Novara line will enter in to operation 2006/2009 entry in to operation of the other lines

3/63/6

8 november 20058 november 2005

TAV SPA TAV SPA

Ferrovie dello Stato Ferrovie dello Stato HoldingHolding

Parent CompanyParent Company

Ferrovie dello Stato Ferrovie dello Stato HoldingHolding

Parent CompanyParent Company

RFIRFIManagement and Management and investment in investment in railway railway infrastructureinfrastructure

RFIRFIManagement and Management and investment in investment in railway railway infrastructureinfrastructure

TAVTAVTAVTAV

GENERAL GENERAL CONTRACTORCONTRACTOR

For the legs For the legs (direct (direct

assignment)assignment)

GENERAL GENERAL CONTRACTORCONTRACTOR

For the legs For the legs (direct (direct

assignment)assignment)

IMPRESE IMPRESE APPALTATRICIAPPALTATRICI

For urban For urban junctions junctions (international (international tenders)tenders)

IMPRESE IMPRESE APPALTATRICIAPPALTATRICI

For urban For urban junctions junctions (international (international tenders)tenders)

TRENITALIATRENITALIAManages transport Manages transport servicesservices

TRENITALIATRENITALIAManages transport Manages transport servicesservices

Other Other companicompani

eses

Other Other companicompani

eses

Other Other companiecompanie

ss

Other Other companiecompanie

ss

4/64/6

8 november 20058 november 2005

General Contractors of project TAV General Contractors of project TAV

Roma-Napoli: IRICAV UNORoma-Napoli: IRICAV UNORoma-Napoli: IRICAV UNORoma-Napoli: IRICAV UNO

Bologna-Firenze: FIAT/CAVETBologna-Firenze: FIAT/CAVETBologna-Firenze: FIAT/CAVETBologna-Firenze: FIAT/CAVET

Milano-Bologna:CEPAV Milano-Bologna:CEPAV UNOUNO

Milano-Bologna:CEPAV Milano-Bologna:CEPAV UNOUNO

Milano-Verona: CEPAV Milano-Verona: CEPAV DUEDUE

Verona-Venezia: IRICAV Verona-Venezia: IRICAV DUEDUE

Milano-Verona: CEPAV Milano-Verona: CEPAV DUEDUE

Verona-Venezia: IRICAV Verona-Venezia: IRICAV DUEDUE

Milano-Genova: COCIVMilano-Genova: COCIVMilano-Genova: COCIVMilano-Genova: COCIV

Torino-Milano: FIAT/CAV.TO.MI.Torino-Milano: FIAT/CAV.TO.MI.Torino-Milano: FIAT/CAV.TO.MI.Torino-Milano: FIAT/CAV.TO.MI.

5/65/6

8 november 20058 november 2005

Activities of the General ContractorActivities of the General Contractor

Engineering design Construction

Engineering design Construction

Preparation of final engineering designs

Preparation of detailed engineering designs

Reference document: Handover agreement

Preparation of final engineering designs

Preparation of detailed engineering designs

Reference document: Handover agreement

Completion of the works in accordance with the approved final engineering designs

Reference document: Supplementary agreement including:

 o All-inclusive priceo Schedule of works

o Completion date for works

Completion of the works in accordance with the approved final engineering designs

Reference document: Supplementary agreement including:

 o All-inclusive priceo Schedule of works

o Completion date for works

o perform any investigations and surveys needed in order to prepare the final engineering designs; o resolve all interference with utility networks; o perform expropriation and occupancy procedures;o manage the works; o resolve disputes with third parties regarding performance of the works;o participate in testing and pre-operating activities. 

o perform any investigations and surveys needed in order to prepare the final engineering designs; o resolve all interference with utility networks; o perform expropriation and occupancy procedures;o manage the works; o resolve disputes with third parties regarding performance of the works;o participate in testing and pre-operating activities. 

Other activities:

: Other activities:

:

6/66/6

8 november 20058 november 2005

Project owner and G.C.: issues and Project owner and G.C.: issues and solutionssolutions  

Principal issueso extended length of the authorisation phase;o requests from local bodies for changes or ancillary works in addition to those envisaged during the project approval phase;o resolution of interference with other utility networks.

Solutionso clarification of the role of the General Contractor;o simplification and acceleration of the authorisation phase;o limitations on requests for design changes;o formalisation of collaboration requirements applying to utility network managers.   

   

Principal issueso extended length of the authorisation phase;o requests from local bodies for changes or ancillary works in addition to those envisaged during the project approval phase;o resolution of interference with other utility networks.

Solutionso clarification of the role of the General Contractor;o simplification and acceleration of the authorisation phase;o limitations on requests for design changes;o formalisation of collaboration requirements applying to utility network managers.   

   

Legge ObiettivoLegge Obiettivo