1.1.WHAT IS A PROJECT ?
Theactionsressources
A discrete common objectives
a specific objective
within a defined time-period and a defined
budget.series of activities aimed at bringing about specified objectives
A effortcomplex to achieve
A
totality of actions which allow us to go from A to B
a deadlinea budget
having to respect
in a particular locationaiming to achieveseries of activities
A group of organized in order to make the future conform to the intention
Some definitions :
4
1.WHAT IS A PROJECT ?
A discretewithin a particular location,
a limited time frame,a budget.
series of activities aiming to achievea specific objective
designed to producean outcome conform to the intention
A possible definition :
... In partnership !
5
1.2.WHAT IS A GOOD PROJECT ?
HOW TO GUARANTEE THE QUALITY OF THE PROJECTS ?
Quality is “the aptitude of a product or a service to satisfy the needs of its users”.
Quality assurance is “all pre-established and systematic action designed to give appropriate confidence in the fact that a product or a service will satisfy given requirements relative to quality”.
Quality is never reached/achieved. It is an objective.
7
Quality approach of HI
In the case of HI development projects, quality assurance is guaranteed by respecting :
1) Approach taking account of local stakeholders and beneficiaries (their needs and their rights).
2) Assurance quality recognized criteria.
3) Specific concept and tool : the project cycle.
2.WHAT IS A GOOD PROJECT ?
8
1.2.1.APPROACHES A. The Needs based approach :
Project
Request
Needs
Ressources
2.WHAT IS A GOOD PROJECT ?
9
2.1. WHAT IS A GOOD PROJECT ? - APPROACHES
B. The Rights based approach :
is not contradictory with the Needs based approach,
but brings an added value through :- a systematic reference to the Rights of the Persons,
- the notion of responsibility or accountability,- empowerment,- participation,- non-discrimination and attention to the most
vulnerable groups
10
1.2.2. QUALITY CRITERIA CASE STUDY – STEP 1
Since 3 years, HI supports a rehabilitation centre through capacity building activities, technical training, equipment provision and infrastructures rehabilitation.
That 5 year-project will allow 1 000 persons in disabling situation to access prosthesis/orthesis and an individual accompanying for better inclusion in the society.
After 3 years, only 150 persons benefited from the project.
2.WHAT IS A GOOD PROJECT ?
12
STEP 2
A more accurate study of the requests of disabled persons, after 3 years, underlines in particular their expectations in terms of social activities and employment. Physical rehabilitation comes at the fifth place.
A study on the beneficiaries of the project shows that most of them live near the centre, and that persons living in remote/enclosed areas do not have the possibility to reach the centre, because of the lack of accessibility and because of the cost of transportation.
2.2. QUALITY CRITERIA CASE STUDY
14
STEP 3
After 3 years, HI considers withdrawing. The centre cannot be financially viable because of the very limited number of clients and the limitation of their financial resources.
The Ministry and local authorities don’t have the financial resources to compensate the withdrawal of HI. The professionals of the centre are already looking for employment with international organisations and NGO’s.
2.2. QUALITY CRITERIA CASE STUDY
16
STEP 4
A majority of disabled persons do not know that the centre exists.
Only 3 beneficiaries found a job thanks to the support they have benefited.
Some of the 150 beneficiaries have decided to form an association with persons having not access to the centre. They demand equal access for all.
2.2. QUALITY CRITERIA CASE STUDY
26
1. Programme Strategic Framework 2. Identification & Development of the project
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
27
2. Identification & Development of the project
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
28
2. Identification & Development of the project
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
Stakeholders analysis
IMPERATIVE STEPS
Problem tree / logical frame / Planning
Participatory programming
29
1. Programme Strategic Framework 2. Identification & Development of the project
3. Drawing up applications for funding
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
30
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
3. Drawing up applications for funding
31
A tool : the Logical Frame
Projectdescription
RESULTS
OVERALLOBJECTIVE
SPECIFICOBJECTIVE
ACTIVITIES
Indicators
Means
Sources ofverification
Costs
Assumptions
Pre-Conditions
3. Drawing up applications for funding
Definition : an aid to thinking and an analytical process
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
32
1. Programme Strategic Framework 2. Identification & Development of the project
3. Drawing up applications for funding
4. Fund Raising
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
33
1. Programme Strategic Framework 2. Identification & Development of the project
3. Drawing up applications for funding
4. Fund Raising
5. Recruitment of project staff
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
35
1. Programme Strategic Framework 2. Identification & Development of the project
3. Drawing up applications for funding
4. Fund Raising
5. Recruitment of project staff
6. Effective launch of the project
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
37
1. Programme Strategic Framework 2. Identification & Development of the project
3. Drawing up applications for funding
4. Fund Raising
5. Recruitment of project staff
6. Effective launch of the project
7. Implementation and monitoring of operations
1.2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
38
7. Implementation and monitoring of operations
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
39
7. Implementation and monitoring of operations
• The PME tool
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
PROBLEM TREE
LOGICAL FRAME
CHRONOGRAM
STAKEHOLDERS ANALYSIS
FOLLOW-UP MATRIXClick here
40
1. Programme Strategic Framework 2. Identification & Development of the project
3. Drawing up applications for funding
4. Fund Raising
5. Recruitment of project staff
6. Effective launch of the project
7. Implementation and monitoring of operations
8. Reporting
1.2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
42
1. Programme Strategic Framework 2. Identification & Development of the project
3. Drawing up applications for funding
4. Fund Raising
5. Recruitment of project staff
6. Effective launch of the project
7. Implementation and monitoring of operations
8. Reporting
9. Info to be communicated to the general public and
donors
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
43
9. Info to be communicated to the general public and donors
1.2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
44
1. Programme Strategic Framework 2. Identification & Development of the project
3. Drawing up applications for funding
4. Fund Raising
5. Recruitment of project staff
6. Effective launch of the project
7. Implementation and monitoring of operations
8. Reporting
9. Info to be communicated to the general public and donors
10. Evaluation of operations
I. PROJECT CYCLE
1.2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
45
10. Evaluation of operations
• Definition
The purpose of evaluation is to make an assessment, as systematic and objective as possible, of an ongoing or completed project, programme or policy, its design, implementation and results.
The aim is to determine :
- the relevance and fulfilments of objectives,
- developmental efficiency,
- effectiveness,
- impact,
- and sustainability.
1.2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
46
10. Evaluation of operations
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE – 10. Evaluation
47
Link between quality criteria and logframe
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE – 10. Evaluation
48
1. Programme Strategic Framework 2. Identification & Development of the project
3. Drawing up applications for funding
4. Fund Raising
5. Recruitment of project staff
6. Effective launch of the project
7. Implementation and monitoring of operations
8. Reporting
9. Info to be communicated to the general public and donors
10. Evaluation of operations
11. Production of a document for capitalising on
experience
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – PROJECT CYCLE
49
11. Production of a document for capitalising on experience
2.WHAT IS A GOOD PROJECT ? - CONCEPTS & TOOLS – A. PROJECT CYCLE
52
1. Programme Strategic Framework 2. Identification & Development of the project
3. Drawing up applications for funding
4. Fund Raising
5. Recruitment of project staff
6. Effective launch of the project
7. Implementation and monitoring of operations
8. Reporting
9. Info to be communicated to the general public and donors
10. Evaluation of operations
11. Production of a document for capitalising on experience
2. PROJECT CYCLE ACTORS
53
WHO DOES WHAT ? EXERCISE
DP PM Admin LOG Coo FC DO TA
1. Programme Strategic Framework
2. Identification & development of the project
3. Drawing up application for funding
4. Fund raising
5. Recruitment of project staff
6. Effective launch of the project
7. Implementation and monitoring of the project
8. Reporting
9. Info to be communicated to the general public and donor
10. Evaluation of operations
11. Capitalisation
Field HQ
54
WHO DOES WHAT ?
DP PM Admin LOG Coo FC DO TA
1. Programme Strategic Framework X X X X X X X X2. Identification & development of the project X X (X) X X X X
3. Drawing up application for funding X X X X X X X
4. Fund raising X X (X) X (X) X
5. Recruitment of project staff X X X X X X
6. Effective launch of the project X X (X) X X X (X)7. Implementation and monitoring of the project X X X X X (X) (X) X
8. Reporting X X X X X X X (X)9. Info to be communicated to the general public and donor X X X (X) (X)
10. Evaluation of operations X X X X X11. Capitalisation X X X X (X) (X) X
Field HQ
Recommended