SolarLeaf -from the idea to the first pilot project atIBA 2013 in Hamburg

Dr.-Ing. Jan Wurm, Arup Materials Consulting, Berlin

2 Think Global -Act Local

3 Arup Berlin – orchestra of disciplines

4

projects

5

CONCEPT SCHEME DETAIL DESIGN CONSTRUCTION OPERATIONS

Unser Leistungsumfang

66 NATIONAL GEOGRAPHICS KIDS

77

Percentage Renewable Energies of total energy consumption (BMU, 2012)

8

99

Ansicht “Zero Energy” Media Wall

1010

Solar Decathlon 2009, TU Darmstadt, Team Germany

1111

Percentage Renewable Energies of total energy consumption (BMU, 2012)

12

1313

1414 Francois Roche, Stephanie Cavuax, Jean Nauarro

1515

1616

1717

1818

1919

2020

2121

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)

International CompetitionSmart Material House IBA 2013

2009

Architects: SPLITTERWERK, Graz

Material Consulting / Facade / Building Physics: Arup, Berlin

Structures: Bollinger und Grohmann, Frankfurt

PBR Technology: SSC

2222

Dynamic transmission

2424

2525

2626 © SPLITTERWERK

2727

2828

2929

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)2010Product developmentArup, COLT, SSC

Funded by ZukunftBau

3030

3131

3232

Dimensions:• Height: ~ 2,6m• Width: ~ 0,7m• Volume ~ 24 l• Weight: ~ 160 kg

Functionalities:• PBR• Solar thermal collector• Dynamic shading

3333

‚solar conversion louvre‘: built-up

Isolierglas (4mm)

SZR (12mm)

Glas-Wandung (10mm)

Medium

Distanzprofil

Klemmrahmen

Überlauf

Anschluss

Steg

3434

‚solar conversion louvre‘: varianten

3535

‚solar conversion louvre‘: frame

Keine Isolation

Neopren Isolation

Schaumstoff Isolation

3636

heat exchangerfloatationCHPP

Energy controllerHeat PumpHot Water

HEAT

BIOMASS BIOGAS

Geothermal

3737

3838

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand

4545

Integration

Integration

4848

jan.wurm@arup.com

4949

jan.wurm@arup.com2015

50

AnaerobicMembrane

BiogasReactor

WCwasteWC

waste

Bioreactor FacadeNutritients

Biomass

Methane

Concept for energetic and material recyling of waste water

Heat

Grey Water

Gas separation

CO2

COD 800mg/l, 60 L

140 g

Fluxes are given per person and day

4 m2

OrganicWaste

OrganicWaste

Industrial water

Industrial water

shredder

5151

jan.wurm@arup.com20??

5252

jan.wurm@arup.com

5353

jan.wurm@arup.com

jan.wurm@arup.com