SolarLeaf -from the idea to the first pilot project atIBA 2013 in Hamburg

Dr.-Ing. Jan Wurm, Arup Materials Consulting, Berlin

Page 2: 0910 the bioreactive facde jan wurm

2 Think Global -Act Local

Page 3: 0910 the bioreactive facde jan wurm

3 Arup Berlin – orchestra of disciplines

Page 4: 0910 the bioreactive facde jan wurm

4

projects

Page 5: 0910 the bioreactive facde jan wurm

5

CONCEPT SCHEME DETAIL DESIGN CONSTRUCTION OPERATIONS

Unser Leistungsumfang

Page 6: 0910 the bioreactive facde jan wurm

66 NATIONAL GEOGRAPHICS KIDS

Page 7: 0910 the bioreactive facde jan wurm

77

Percentage Renewable Energies of total energy consumption (BMU, 2012)

Page 8: 0910 the bioreactive facde jan wurm

8

Page 9: 0910 the bioreactive facde jan wurm

99

Ansicht “Zero Energy” Media Wall

Page 10: 0910 the bioreactive facde jan wurm

1010

Solar Decathlon 2009, TU Darmstadt, Team Germany

Page 11: 0910 the bioreactive facde jan wurm

1111

Percentage Renewable Energies of total energy consumption (BMU, 2012)

Page 12: 0910 the bioreactive facde jan wurm

12

Page 13: 0910 the bioreactive facde jan wurm

1313

Page 14: 0910 the bioreactive facde jan wurm

1414 Francois Roche, Stephanie Cavuax, Jean Nauarro

Page 15: 0910 the bioreactive facde jan wurm

1515

Page 16: 0910 the bioreactive facde jan wurm

1616

Page 17: 0910 the bioreactive facde jan wurm

1717

Page 18: 0910 the bioreactive facde jan wurm

1818

Page 19: 0910 the bioreactive facde jan wurm

1919

Page 20: 0910 the bioreactive facde jan wurm

2020

Page 21: 0910 the bioreactive facde jan wurm

2121

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)

International CompetitionSmart Material House IBA 2013

2009

Architects: SPLITTERWERK, Graz

Material Consulting / Facade / Building Physics: Arup, Berlin

Structures: Bollinger und Grohmann, Frankfurt

PBR Technology: SSC

Page 22: 0910 the bioreactive facde jan wurm

2222

Page 23: 0910 the bioreactive facde jan wurm

Dynamic transmission

Page 24: 0910 the bioreactive facde jan wurm

2424

Page 25: 0910 the bioreactive facde jan wurm

2525

Page 26: 0910 the bioreactive facde jan wurm

2626 © SPLITTERWERK

Page 27: 0910 the bioreactive facde jan wurm

2727

Page 28: 0910 the bioreactive facde jan wurm

2828

Page 29: 0910 the bioreactive facde jan wurm

2929

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)2010Product developmentArup, COLT, SSC

Funded by ZukunftBau

Page 30: 0910 the bioreactive facde jan wurm

3030

Page 31: 0910 the bioreactive facde jan wurm

3131

Page 32: 0910 the bioreactive facde jan wurm

3232

Dimensions:• Height: ~ 2,6m• Width: ~ 0,7m• Volume ~ 24 l• Weight: ~ 160 kg

Functionalities:• PBR• Solar thermal collector• Dynamic shading

Page 33: 0910 the bioreactive facde jan wurm

3333

‚solar conversion louvre‘: built-up

Isolierglas (4mm)

SZR (12mm)

Glas-Wandung (10mm)

Medium

Distanzprofil

Klemmrahmen

Überlauf

Anschluss

Steg

Page 34: 0910 the bioreactive facde jan wurm

3434

‚solar conversion louvre‘: varianten

Page 35: 0910 the bioreactive facde jan wurm

3535

‚solar conversion louvre‘: frame

Keine Isolation

Neopren Isolation

Schaumstoff Isolation

Page 36: 0910 the bioreactive facde jan wurm

3636

heat exchangerfloatationCHPP

Energy controllerHeat PumpHot Water

HEAT

BIOMASS BIOGAS

Geothermal

Page 37: 0910 the bioreactive facde jan wurm

3737

Page 38: 0910 the bioreactive facde jan wurm

3838

Page 39: 0910 the bioreactive facde jan wurm

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand

Page 40: 0910 the bioreactive facde jan wurm

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand

Page 41: 0910 the bioreactive facde jan wurm

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand

Page 42: 0910 the bioreactive facde jan wurm

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand

Page 43: 0910 the bioreactive facde jan wurm

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand

Page 44: 0910 the bioreactive facde jan wurm

• Total budget DKK 16 million

• Building Lab DK: 50% support (max DKK 8 million)

Aktueller Stand

Page 45: 0910 the bioreactive facde jan wurm

4545

Page 46: 0910 the bioreactive facde jan wurm

Integration

Page 47: 0910 the bioreactive facde jan wurm

Integration

Page 48: 0910 the bioreactive facde jan wurm

4848

[email protected]

Page 49: 0910 the bioreactive facde jan wurm

4949

[email protected]

Page 50: 0910 the bioreactive facde jan wurm

50

AnaerobicMembrane

BiogasReactor

WCwasteWC

waste

Bioreactor FacadeNutritients

Biomass

Methane

Concept for energetic and material recyling of waste water

Heat

Grey Water

Gas separation

CO2

COD 800mg/l, 60 L

140 g

Fluxes are given per person and day

4 m2

OrganicWaste

OrganicWaste

Industrial water

Industrial water

shredder

Page 51: 0910 the bioreactive facde jan wurm

5151

[email protected]??