29th October 2015Global Street Design Program – NACTO, Austin

THE CROSSWALK LAB(an initiative of Centre for Green

Mobility)

The Crosswalk LabTraffic Junction management through improved design

Traffic Police Municipal Corporation

Vijay CrossingNarol Crossing

Traffic Management, Signaling Plan & Design

PUBLIC CONNECT | The Crosswalk Lab

The Crosswalk LabTraffic Junction management through improved design

STUDY AREA DEFINING

SURVEYS

ANALYSIS

STREET AUDIT:

PERCEPTION STUDYMEASUREMENT FOR DRAWING

TRAFFIC :

PEAK HOUR VEDIOGRAPHYUNDERSTANDING OF TRAFFIC

BEHAVIOURSIGNAL PHASING

PREPARATION OF DRAWINGVOLUME COUNT ANALYSIS

SIGNAL PHASING

DEMONSTRATION & COLLECTING EVIDENCE

PROPOSAL TO MUNICIPAL CORPORATION

PUBLIC CONNECT | TCL – Vijay Crossing

Feedback before the experimentShopkeepers, Pedestrians and Motorists

What we have needs to change

What we have is alright

PUBLIC CONNECT | TCL – Vijay Crossing

High number of pedestrians

PUBLIC CONNECT | TCL – Vijay Crossing

Issues

Parking at intersection and footpathConflict between traffic, pedestrians and parked vehiclesNo safe crossing path for pedestriansHigh speed of turning vehiclesHigh incidence of wrong turning vehicles

Left lane: 8 mC- 2400 PCUD- 166 PCU6.9% Used

Left lane: 8 mC- 2400 PCUD- 187 PCU7.9 % Used

PUBLIC CONNECT | TCL – Vijay Crossing

PUBLIC CONNECT | TCL – Vijay Crossing

Towa

rds U

NIVE

RSIT

Y

Towards DRIVE-INTo

ward

s DAR

PAN

towards COMMERCE

Phase 1 50 sec

Phase 3 50 sec

Phase 4 50 sec

Existing signal cycle: 200 sec

Phase 2 50 sec

PUBLIC CONNECT | TCL – Vijay Crossing

Towa

rds U

NIVE

RSIT

Y

Towards DRIVE-IN

Towa

rds D

ARPA

N

towards COMMERCE

Phase 1 45 secPhase 2 15 sec

Phase 3 40 sec

Phase 4 15 sec

254

8 P

CU/h

r

1200 PCU/hr

500

PCU

/hr

500 PCU/hr

Proposed signal cycle: 115 secReduction by

20seconds in each arm

Phase 2 15 sec

PUBLIC CONNECT | TCL – Vijay Crossing

Maximum speed at left turn:50 kmphMaximum speed at right turn: 20

kmphMaximum speed at straight: 40 kmph

PUBLIC CONNECT | TCL – Vijay Crossing

No lane discipline

Wide open left turnsUnguided road space

8 m

Too wide carriage way

Delay in junction clearance

8 m

PUBLIC CONNECT | TCL – Vijay Crossing

No sight distance for pedestriansLeft turn with high speed

Unsafe pedestrians

PUBLIC CONNECT | TCL – Vijay Crossing

Unsafe pedestriansIsland covered by greenery

Mix of trafficUnrestrictive u turn

No refuge while crossing at junction – median too far – too narrow

PUBLIC CONNECT | TCL – Vijay Crossing

PUBLIC CONNECT | TCL – Vijay Crossing

PUBLIC CONNECT | TCL – Vijay Crossing

PUBLIC CONNECT | TCL – Vijay Crossing

Improving SAFETY while crossing the road

Safe left turns

Improving SAFETY while crossing the road

Speed reduced by 60%

Improving SAFETY while crossing the road

A space to wait while crossingImproved and constrained turning – notice the police standing in the refuge

Junction Re-design

Existing Situation – No clear space for cyclists and pedestrians which is blocked by parked vehicles

Junction Re-design

New Situation – Space created for cyclists and pedestrians by aligning parking away from edge.

Junction Re-design

New Situation – Space created for cyclists and pedestrians by aligning parking away from edge.

Improving SAFETY while crossing the road

A space to wait while crossing

A space to wait while crossing

PUBLIC CONNECT | TCL – Vijay Crossing

A space to wait while crossingReduction in wrong side - No extra space

PUBLIC CONNECT | TCL – Vijay Crossing

DAY 0Implementation

Improving SAFETY while crossing the road

Day 1Slow left turns

Improving SAFETY while crossing the road

Day 1Slow U turns

Improving SAFETY while crossing the road

Day 1Parking getting organized

Improving SAFETY while crossing the road

Day 2

Improving SAFETY while crossing the road

Day 1More walking space,But parking persists

Day 2

Improving SAFETY while crossing the road

Day 1Refuge helps

Day 3

Improving SAFETY while crossing the road

Day Parking back to its original position

Day 3

Improving SAFETY while crossing the road

Day Much talking to people helps

Day 3

Improving SAFETY while crossing the road

Day Parking getting organized again

Day 4Talking talking and more talking to peopleTo get them to understand new parking space

Improving SAFETY while crossing the road

Day 5Much discipline observed

Improving SAFETY while crossing the road

Day 5

Improving SAFETY while crossing the road

Observed managed parking

Issues on street (Shopkeepers)

IMPACT

Do you feel street safe? (pedestrians)

IMPACT

THE IMPACT

Geometric Design of Junction

Pedestrian safety at the junction. High IncreaseSafety for cyclists at the junction. Little IncreaseHigh turning speeds. Reduced by 60%High incidence of wrong lane driving (opposite currents). Reduced by 90%Large wait time at junctions. Decrease by 35%Managing traffic. Easy

PUBLIC CONNECT | TCL – Vijay Crossing

Recommended