Developing a Power Developing a Power Market in IndiaMarket in India
- A Transmission - A Transmission PerspectivePerspective
2
• Indian Power Sector –
Installed capacity – 107,000 MW (Thermal-76%,
Hydro-23%, Nuclear-1%)
Peak Demand – 82,000 MW
Transmission lines - 5 Million Ckt. kms
Regional Grids – 5
National Grid under progress
Growth Rate of energy– 9% per annum
INDIAN POWER SECTOR- A PROFILE
3
4
FUTURE POWER SUPPLY SCENARIOFUTURE POWER SUPPLY SCENARIO
• Peak demand (expected)- 157,000 MW
• Capacity Addition envisaged-100,000 MW in
next 10 years
• Goal – Power for all by 2012
BY THE YEAR 2012
5
NEED FOR NATIONAL GRIDNEED FOR NATIONAL GRID
Uneven disposition of Natural resources
- Coal reserves concentrated in Eastern region- Hydro potential mainly in North Eastern & Northern
region Establishment of large sized pit head stations to achieve
economy of scale Load Centers located at distant locations in Northern,
Western & Southern regions Constraints on Right-of-Way (ROW) Flexible & high capacity transmission system required for
power transfer to different regions
6
7
Phase – 1 – Already completed • Interconnection of Regional Grids through HVDC Back-to-Back links
having cumulative capacity of 5000 MW
Phase – 2 – Partly completed • Hybrid system comprising of high capacity HVDC and HVAC lines (both
765 kV and 400 kV) 2000MW, 1400kms long HVDC bipole between Eastern and Southern
regions – completed 400kV synchronous interconnections between Eastern and Western
regions resulting into synchronous operation of power system having 50,000MW capacity – completed
This will transfer operational surplus and would provide flexibility in inter-regional transfer of power
• Present cumulative capacity is 8000 MW• On an average, 1500-2000 MW is being transferred and about 35 MU/day
is being traded
PLAN FOR NATIONAL GRID-A PHASED DEVELOPMENT
8
Phase – 2• Most of transmission lines would be part of associated transmission
system of large sized generation project.• Cumulative inter-regional capacity would be 23,000 MW
Phase – 3 – to be completed by 2012• Ring of 765 kV transmission lines inter-connecting ER, WR and NR• Cumulative capacity would be 30,000 MW• This would be utilised for transfer of short term as well as long term
surplusEstimated Investment : US$ 20 billion
– POWERGRID’s Investment : US$11 billion– Private sector Investment : US$9 billion
This will facilitate development of power market
PLAN FOR NATIONAL GRID-A PHASED DEVELOPMENT
9
10
Phase – II & III
11
Salakati
Bongaigaon
Birpara
Malda
Dehri
Sasaram
Sahupuri
Allahabad North-eastern
Eastern
Northernn
Belgaum
Kolhapur
Budhipadar
Rourkela
Korba
Raipur
Auraiya
Malanpur
Western
Southern
Balimela
Upper Sileru
Chandrapur
Ramagundam
Jeypore
Gazuwaka
Singrauli
Vindhyachal
400kV
220kV220kV
500MW
500MWW220kV
1000MW 500MW
220kV
400kV
220 kV
220kV
Talcher
Kolar
2500MW
Gorakhpur/Lucknow
MAJOR INTER REGIONAL L INKS-8000 MW CAPCITY
12
GROWTH OF CUMULATIVE CAPACITY OF INTER-REGIONAL L INKS
8000
23000
30000
0
5000
10000
15000
20000
25000
30000
35000
Plan
Cu
mu
lati
ve C
apac
ity
(MW
)
Present By 2006-07 By 2011- 12
13
Major Issues & Suggestions
Issues
• Uncertainty in Generation Addition
• Mobilisation of Funds
• Recovery of Investment
• Proper Energy Accounting System needs to be evolved to
take care of unscheduled power transfer
• Accounting of transmission losses in different conditions
• Wheeling charges to different owners
14
Major Issues & Suggestions
Suggestions
• Creation of Transmission Highways from resource
pockets to load centres, without linking them to a
particular generation project
• Special methodology need to be adopted for recovery
of transmission charges of Transmission highways
• Most important is that there should be long term
commercial agreement to enable huge investment in
transmission sector
15
Recommended