TAKIANTON G GROUP Fly Killer

Takiantong group

Embed Size (px)

Citation preview

Page 1: Takiantong group

TAKIANTON

G GROUP

Fly Killer

Page 2: Takiantong group

Fly Killer

Page 3: Takiantong group

Manufacturing Process

Sequence

What is your primary process?

Why did you choose this

process?

The main process is cutting because

manufacturing fly killer . The first step cut the

plastic bottle into 3 part and assembled

together.

Page 4: Takiantong group
Page 5: Takiantong group

Manufacturing Process

Sequence

What is your secondary

process? Why did you choose

this process?

The secondary process is Drilling process. We

will drill hole at the upper part of product to a

size 2×2 cm² because nature of the mayfly will

fly approach light.

Page 6: Takiantong group
Page 7: Takiantong group

Manufacturing Process

Sequence

What is your tertiary

process? Why did you

choose this process? The tertiary process is painting process . We

will painting the black color because mayfly

will fly into hole with a light and assembled

with the lamp.

Page 8: Takiantong group
Page 9: Takiantong group

Product function

With your selected

material, how is your material

compatible with product

geometry and manufacturing

processes? The material selected is appropriate to product

and the product is circular cylinder because

easy to find and convenient.

Page 10: Takiantong group

Product function

What is the normal applied

load to the material? Can

your material take such

load?

Product can get load.

Load estimate have 1 Newton.

Page 11: Takiantong group

Product function

What is the normal ambient

conditions to your material?

Heat of the lamp affect product have heat.

Water have affect cause frazzle of lamp.

Page 12: Takiantong group

Product function

With your selected manufacturing

process, how is your process

compatible with the product

geometry?

Product is associated with circular cylinder as

material used is circular cylinder

Page 13: Takiantong group

Manufacturing

cost calculation

Page 14: Takiantong group

Material costs per part

Head:cM=(2bath/1piece)(1piece/part)(1)= 2 bath/part

Body:cM=(2bath/1piece)(1piece/part)(1)= 2 bath/part

Base:cM=(2bath/1piece)(1piece/part)(1)= 2 bath/part

Lamp:cM=(50bath/1 piece)(1piece/part)(1)=50bath/part

Page 15: Takiantong group

Tooling costs per part

Head:

cT=(150bath/run)(20part/run)=7.5bath/part

Body:

cT=(150bath/run)(20part/run)=7.5bath/part

base:

cT=(150bath/run)(20part/run)=7.5bath/part

Page 16: Takiantong group

Processing costs per

partHead:

cP=(10bath/hr)(1.5hr/part)=15bath/part

Body:

cP=(10bath/hr)(1hr/part)=10bath/part

base:

cP=(10bath/hr)(0.5hr/part)=5bath/part

Lamp:

cP=(10bath/hr)(0.5hr/part)=5bath/part

Page 17: Takiantong group

Total costs

C

=cM+cT+cP=113.5bath/part