58
Appendix 3 to City Council Resolution from 25.12.2013 in redaction approved by City Council Resolution from 30.07.2013 CONCEPT OF THE INDUSTRIAL PARK “CENTRAL” IN KREMENCHUK 1

Industrial park concept

Embed Size (px)

Citation preview

Page 1: Industrial park concept

Appendix 3 to City Council Resolutionfrom 25.12.2013 in redaction approved by City Council Resolution from 30.07.2013

CONCEPT OF THE INDUSTRIAL PARK “CENTRAL” IN KREMENCHUK

1

Page 2: Industrial park concept

CONTENT

page1. Industrial park “CENTRAL” in Kremenchuk. 4

1.1 Introduction. 41.2 Industrial park “CENTRAL” in Kremenchuk. 51.2.1 Poltava oblast in the East Europe. 5

1.2.2 Poltava oblast as a part of Ukraine. 51.2.3 Kremenchuk district as a part of Poltava oblast. 61.2.4 Kremenchuk on the map of Ukraine. 7

2. The initiator of the industrial park creation 82.1 General provisions. 82.2 Kremenchuk City Council. 9

3. The aim and task of creation and functioning of the industrial park.

10

3.1 The aim of the industrial park creation. 103.2 The task of the industrial park creation. 103.3.The functioning of the industrial park 11

3.3.1 Priority economic industries for development within the boundaries of the industrial park.

11

3.3.1.1 Sector 1 – «Hi-Tech» (mechanic engineering). 123.3.1.2 Sector 2 – «Logistics» (logistics). 123.3.1.3 Sector 3 – «TechnoPolis» (ІТ- technologies and

electronics).12

3.3.1.4 Sector 4 – «EcoLife» (reserve sector). 123.3.1.5 Sector 5 – «Еnergetics» (alternative energy and

engineering)12

3.3.2 Business-city. 123.4 Organization of the industrial park "CENTRAL" functioning.

13

3.4.1 Procedure for the industrial park creation. 13

3.4.2 Sources of funding for creation and functioning of the industrial park.

14

4.Industrial and economic potential of Kremenchuk. Location and land parcel size.

17

4.1 Poltava oblast. 174.2 Industrial and economic potential of Kremenchuk. 17

4.2.1 Location. 174.2.2 Total area. 174.2.3 Population. 184.2.4 Administrative structure. 184.2.5 Agglomeration. 184.2.6 Industrial potential. 18

2

Page 3: Industrial park concept

4.2.7 Service sector. 194.2.8 Communal service. 20

4.3 Transport. 204.3.1 Public transport. 204.3.2 Inter-cities transport. 204.3.3 Railway transport. 214.3.4 River transport. 214.3.5 Air connection. 21

4.4 Ecological situation. 214.5 Industrial park location. 21

5. Period of the industrial park “CENTRAL” creation. 246. Requirements for the industrial park members. 24

6.1 Organization of the industrial park "CENTRAL" functioning.

24

6.2 . Requirements for the industrial park members. 257. Planned consumption of energy and communal services by the industrial park members.

26

8. Plan of the industrial park development. 288.1. Infrastructure development of the industrial park. 288.2. Constraction of the industrial park. 308.3. Service delivery. 30

9. Needed resources for creation and functioning of the industrial park, expected sources of attraction.

32

10. Organizational model of the industrial park functioning. 3611. Expected results of the industrial park functioning. 37

11.1 General tendencies. 3711.2 Expected results of the industrial park functioning. 3711.3 Expected advantages of the industrial park ‘CENTRAL’

functioning after its construction.38

11.4. Investment project estimation. 40

3

Page 4: Industrial park concept

THE INDUSTRIAL PARK CONCEPT

1. The industrial park “CENTRAL”

1.1 Introduction The concept of creation and functioning of the industrial park" CENTRAL " in

Kremenchuk, hereinafter referred to as Concept, reflects the basic legal, organizational and economic conditions of creation and functioning of the industrial park in Kremenchuk, Poltava oblast.

The concept was developed in accordance with current legislation and regulations of Ukraine. The creation of the industrial park “CENTRAL” is supported by the Poltava Regional State Administration.

The Ukraine President Mandate from March 22, 2012 “On Acceleration of National Projects Implementation, Definition of New Priorities and Extension of National Projects taking into account actual problems relating to restoration of economic growth and modernization of the national economy” is one of the strategic documents, which influenced the development of the Concept.

Legislation about the industrial park concept:- the Constitution of Ukraine;- the Land Code of Ukraine;- the Tax Code of Ukraine;- the Commercial Code of Ukraine;- the Law of Ukraine “On Industrial Parks”;- the Law of Ukraine “On Regulation of Town-Planning Activities”.The relevant statistics published on the website of the State Statistics Service of

Ukraine were used to conduct analytical research and calculations. Development of the concept of the industrial park "CENTRAL" in Kremenchuk was done by consulting support of Poltava Regional Center for Investment and Development and Regional expert consulting center "Poltavakonsaltynh" Ltd.

4

Page 5: Industrial park concept

1.2 Industrial park “CENTRAL”

1.2.1 Poltava oblast in the East Europe

1.2.2 Poltava oblast as a part of UkrainePoltava oblast is an administrative unit of Ukraine with the center in Poltava. It

was founded in September 22, 1937. It is located in the middle part of the left-bank Ukraine. Most of the area lies within the Dnipro lowland and Poltava flat.

Total Area - 28,748 km ² (4, 76% of Ukraine territory), population - 1,466,786 people (February 1, 2013, 3.22% of the population of Ukraine). The region has 25 districts and 15 cities, five of which - Kremenchuk and Komsomolsk, Lubny, Myrgorod and Poltava - regional subordination.

The most important industries of the oblast are agriculture and industry (including food, light industry, machinery, etc.)..

5

Page 6: Industrial park concept

Poltava oblast is located in the central part of Ukraine. Poltava oblast borders Chernihiv oblast and Sumy oblast in the north, Kharkiv oblast in the east, Dnipropetrovsk oblast and Kirovohrad oblast in the south, Kyiv oblast and Cherkasy oblast in the west.

1.2.3 Kremenchuk district as a part of Poltava oblast.

Kremenchuk district is an administrative unit of Poltava oblast with center in Kremenchuk. Kremenchuk district is located in the southwestern part of the oblast, mainly

6

Page 7: Industrial park concept

on the left bank and only a small part on the right bank. It was formed on May 17, 1939. The population of the district is 41.9 thousand people. Total area is 1.02 thousand km ².

Kremenchuk district borders Globyno, Kozelschyna, Kobeliaky districts of Poltava oblast and Onufrievka, Svetlovodsk districts of Kirovohrad oblast.

1.2.4 Kremenchuk on the map of Ukraine

Kremenchuk is a city of regional subordinance in Poltava oblast and the administrative center of Kremenchuk district. City population was 225,9 thousand people as of February 1, 2013. The city is on 28 place of the State Rating of Ukraine. The city is divided into two districts: Avtozavodskyi (Left Bank) and Kriukov (mostly Right-Bank and Left-Bank part of the city). Kremenchuk is located in the temperate continental climate in the Dnipro lowland and middle stream of the Dnipro River, on its left and right banks in central Ukraine. The city is situated on the territory of 9600 hectares.

The city is located in the central part of the Left-Bank Ukraine, which significantly influences the development of its economy, rail, road and water connections, social and economic relations.

The favorable location of Kremenchuk and the level of its economic influence on the economy of the whole region became the main factors of making decision on creation of the industrial park within the boundaries of the city.

The main aim of industrial park creation is to attract not only investment but also modern technology, world experience of industrial production organization. That’s why industrial park should become the center of industrial standards, engineering science and the leader of industrial production in the region.

Kremenchuk on the map of Ukraine

2. The initiator of the industrial park creation

7

Page 8: Industrial park concept

2.1 General Provisions According to Article 1 of the Law of Ukraine “On Industrial Parks”:

«3) industrial (production) park (hereinafter referred to as‘industrialpark’) means a territory identified by the initiator of the industrial park creation according to the town-planning documents and equipped with the appropriate infrastructure where the participants of the industrial park may perform their economic activities in the sphere of industrial production, research activities, activities in the sphere of information and telecommunication on the conditions specified by the laws of Ukraine and the agreement on economic activities within the boundaries of the industrial park; 4) initiator of the industrial park creation (hereinafter referred to as ‘initiator’) means the public authorities, the local government bodies, which in compliance with the Constitution of Ukraine shall enjoy the rights of the land owner on behalf of the Ukrainian people and which according to the law shall be vested with the authority to dispose of land, as well as a legal or a physical person - the owner or the lease holder of the land parcel, which may be used and proposed by him for creation of the industrial park;»

After analyzing feasibility of the industrial park creation within the boundaries of Kremenchuk and its influence on the economy of the district and the region, Kremenchuk City Council came out with an initiative to create the industrial park "CENTRAL".

According to Article 5 of the Law of Ukraine “On Industrial Parks”: «1. The state power bodies, the local government authorities, legal or physical persons who have the right for creation of the industrial parks in the state and communal lands according to this Law may be the initiators of creation of the industrial parks».

Kremenchuk City Council as initiator of the industrial park “CENTRAL” creation exercises the land title on behalf of the Ukrainian nation and has the right to administer the land in accordance with the Law. Kremenchuk City Council allocated land for the industrial park creation in the northern industrial center of Kremenchuk with total area of 168.55 ha. and cadastral number 5310436100:01:003:0000.

2.2 Kremenchuk City Council8

Page 9: Industrial park concept

Kremenchuk City Council of Poltava oblast is an initiator of the industrial

park "CENTRAL" creation.

Symbols of Kremenchuk - city arms and flag.

State power body

Mayor OLEH BABAYEV

Telephone:+380 (0536) 73-00-34, 73-00-44, fax: 73-00-54

e-mail [email protected] Vice Mayor ANDRIY POHRIBNYYTelephone: +380 ( 0536) 74-30-20e-mail [email protected] www.kremen.gov.uaaddress : Victory square 2, Kremenchuk, Poltava oblast,

Ukraine, 39600

"Program on investment and economic development of Kremenchuk for 2012-2015" was adopted by Kremenchuk City Council on session from June 26, 2012. Public Enterprise “Kremenchuk Center for International Relations and Economic Development “Kremenchuk Invest” was created for implementation of program objectives. This enterprise is responsible for attracting investment in the city with the aim of new enterprises creation and promotion of Kremenchuk.

On June 26, 2013 XXXIII session of Kremenchuk City Council adopted a decision "On creation of the industrial park " CENTRAL " in Kremenchuk."

3. The aim and task of creation and functioning of the industrial park.

9

Page 10: Industrial park concept

3.1 The aim of the industrial park creation.The industrial park is creating with the aim of:- investment attraction;- world experience of industrial production introduction;- modern technologies implementation;- creation of the center of industrial standards, engineering science and the leader

of industrial production in the region.Industrial Park "Central" is to create by means of formation of a single equipped

territory to accommodate new facilities in industrial production, innovation, logistics aimed at providing economic development, increase its competitiveness, and stimulate investment and innovation, improving social standards for residents.

3.2 The task of the industrial park creation.

The industrial park is created with the aim to solve following tasks:

1. Improving Kremenchuk image and its promotion in the country and abroad.2. Improving the investment climate in the city and in the region.3. Strengthening the investor confidence in the state of Ukraine.4. Improving the business activity in the business environment.5. Supporting the development of small and medium business.6. Improving the social standards for city population:

- increasing the budget receipt on all levels;- creation of new jobs;- payment of the rent for land usage within the boundaries of the industrial park;- creation of ecologically clean industrial enterprises;- increasing the salary average level in the city;- activation of the inter-industries cooperation;- upgrading the workers professional skills;- decreasing the education and labor migration;- improving the demographic situation by stimulating the labor migration in the city;- employment of the energy suppliers and other service providers, which will

guarantee the functioning of the industrial park;7. Implementation of modern innovation solutions in production industries.8. Creation of favorable condition to develop small and medium business.9. Implementation of energy-savings technologies.10. Increase of economic activities volume.

3.3 The functional purpose of the industrial park.

10

Page 11: Industrial park concept

3.3.1 Priority economic industries for development within the boundaries of the industrial park.

The priority economic industries for development within the boundaries of the industrial park were determined after economic analysis:

- mechanic engineering;- logistics;- IT-technologies and electronics;- small and medium business;- alternative energy and engineering.

Scheme of the territory allocation within the boundaries of the industrial park "CENTRAL" in Kremenchuk.

Industrial Park area is 168.55 ha.The industrial park is divided into five sectors:

3.3.1.1 Sector 1 – «Hi-Tech» (mechanic engineering).

11

Page 12: Industrial park concept

Sector 1 is to provide the instrument making industry, engineering and other areas of production, created through the implementation of new technologies.

The approximate size of the expected investment is 150 million dollars.Estimated number of created jobs is 1250 people.Total area is 50,05 ha.

3.3.1.2 Sector 2 – «Logistics» (logistics). Sector 2 is to provide the warehousing and packing buildings, automobile

companies and customs warehouses.The approximate size of the expected investment is 60 million dollars.Estimated number of created jobs is 510 people.Total area is 19,76 ha.

3.3.1.3 Sector 3 – «Techno Polis»(IT-technologies and electronics). Sector 3 is to provide the platform for development of advanced information and

telecommunication technologies, nanotechnology, electronics manufacturing.The approximate size of the expected investment is 82 million dollars.Estimated number of created jobs is680people.Total area is 27,35 ha.

3.3.1.4 Sector 4 – «EcoLife»(reserve sector). Total area is 26,78 ha.

3.3.1.5 Sector 5 – «Energetics» (alternative energy and engineering). Sector 5 is to provide the companies working in the field of energy efficiency and

energy saving technologies, production tool, equipment and agricultural machinery manufacture.

The approximate size of the expected investment is 130 million dollars.Estimated number of created jobs is 1115 people.Total area is 44,61 ha.

3.3.2 Business-city.Business-city is to created with the aim of providing services for all industrial park

members, clients.It will be a complex which includes offices with open planning, conference halls,

press centers, negotiation rooms, data centers, banking centers, cafes, polygraphic center, business hotels, outdoor and underground parking.

Total area is 20,12 ha.

The current concept can be changed during the design estimates development of the industrial park if there are factors that contribute to change forecasted zoning of its territory.

12

Page 13: Industrial park concept

3.4 Organization of the industrial park "CENTRAL" functioning.

3.4.1 The procedure for the industrial park creation:- approval of the concept by the initiator of the industrial park creation;- selection of the land for the industrial park location;- reception of the copy of the State Land Cadaster statement on the land;- creation of the working group to conduct the tender on the selection of the

management company;- decision making on the industrial park "CENTRAL" creation;- conducting the tender on selection of the management company;- submission to the authorized state body of copy of the decision on industrial park

creation and industrial park concept;- decision on inclusion of the industrial park to the register of industrial parks;- conclusion of the contract with management company;- transfer the land parcels into lease to the management company;- development of the estimate documentation on necessary infrastructure creation

to provide the industrial park with energy products and transportation routes;- creation of necessary infrastructure to provide the industrial park with energy

products and transportation routes;- conducting the advertising company through media to inform all target groups of

potential industrial park members,- holding the roundtable discussions, seminars and other events to assist attracting

investment in the development of the park;- transfer the land parcels into sublease from management company to industrial

park members for creation and functioning of their enterprises;- providing all members of the industrial park with services.

3.4.2 Sources of funding for creation and functioning of the industrial park

№ Expenses Source of funding Sum, 13

Page 14: Industrial park concept

thousand/UAH

1. Preparation:Transfer of agricultural lands into the lands of industry, transport, communications, energy, defense and other purposes for the industrial park creation.

Municipal budget 46,56

Training of specialists on attracting investment in the city economy.

Municipal budget 175,65

Distribution of the industrial park "CENTRAL" concept among potential investors and management companies.

Municipal budget 33,56

Preparation of technical and juridical documentation.

Municipal budget 84,69

Conducting of target business trip, focus groups and seminars.

Municipal budget 125,26

Designing of presentations, informational materials and stands.

Municipal budget 207

Presentation of investment attractiveness and Kremenchuk industrial capacity abroad and in the international forums in Ukraine.

Municipal budget 244,17

Registration of the industrial park “CENTRAL” trademark.

Municipal budget 8

Expenses on the reception of copy of the State Land Cadaster statement for the land.

Municipal budget 0,2

Expenses on preparation of technical documentation.

Municipal budget 80

Expenses on land parcel analysis. Municipal budget 10

2.The selection and work with the management company:Expenses on tender documentation creation and conducting the tender on selection of the management company.

Municipal budget *

Preparation of contracts with the management company about land lease, administration and usage of the industrial park “CENTRAL” trade mark.

Municipal budget *

Loss compensation of transfer of agricultural lands into the lands of industry, transport, communications, energy, defense and other purposes for the industrial park creation.

Municipal budget

Management company

*

14

Page 15: Industrial park concept

Development of estimate documentation on necessary infrastructure creation to provide the industrial park with energy products and transportation routes

Municipal budget *

3.Construction and development of the industrial park, cooperation between management company and investors:

Сreation of infrastructure to provide industrial park with energy and transport.

Municipal budgetState Budget of UkraineManagement company

*

Lease of the industrial park land parcel.Management company

*

Promotion of the industrial park with the aim of attracting investment in the development of the park.

Municipal budget,Management company

*

Preparation of contracts with members of the industrial park.

Management company

*

Transfer the land into sublease to the industrial park members.

Management company

*

Development of general layout of building of the industrial park.

Management company

*

Development of the territory.

Management company Industrial park members

*

Provision of services by management company.

Industrial park members

*

Other costs.

Municipal budgetState Budget of UkraineManagement companyIndustrial park members

*

* The volume of financing will be determined in the business plan prepared by the management company.

15

Page 16: Industrial park concept

4. Industrial and economic potential of Kremenchuk. Location and land parcels size.

4.1 Poltava oblast.

16

Page 17: Industrial park concept

Poltava oblast is one of the regions of Ukraine with an average level of industrial production development. Most industries were created in 50-60s of the twentieth century:

oil production; iron-ore; steel industry; oil refinery; automobile; engineering tools; electrical engineering; production of technological equipment for chemical, food and light industry.

4.2 Industrial and economic potential of Kremenchuk.Kremenchuk is a city of regional subordination in the Poltava oblast of Ukraine,

and the administrative center of the Kremenchuk district.

4.2.1 Location.Kremenchuk is located in the temperate continental climate in the Dnipro lowland

and the middle stream of the Dnipro River, on its left and right banks in central Ukraine.

Distance from Kremenchuk to (highways):

Warsaw~ 1084 кмKyiv ~ 302 км

Cherkasy ~ 178 км

St - Petersburg ~ 1481 кмMoscow ~ 985 км

Minsk~ 822 км

Sumy~ 289 кмKharkiv ~ 263 кмPoltava ~ 116 км

Paris ~ 2610 кмVienna ~ 1625 км

Lviv~ 842 км

Luhansk~ 558 кмVolgograd ~ 1023 км

Astana~ 3396 км

Kirovohrad ~ 131 кмOdesa~ 457 км

Chisinau~ 467 км

Kherson~ 337 кмSimferopol ~ 542 км

Istambul ~ 980 км

Dnipropetrovsk ~ 163 кмZaporizhia ~ 249 кмDonetsk ~ 415 км

4.2.2 Total area.

17

Page 18: Industrial park concept

The city is situated on the territory of 9600 hectares.

4.2.3 Population.

City population was 225,9 thousand people as of February 1, 2013. The city is on 28 place of the State Rating of Ukraine.

Graph of population change ( thousands\people)

4.2.4 Administrative structure.The city is divided into two districts: Avtozavodskyi (Left Bank) and Kriukov

(mostly Right-Bank and Left-Bank part of the city).4.2.5 Agglomeration.

Kremenchuk is a center with half a million people agglomeration. Many people from the surrounding villages, towns and cities work and study in Kremenchuk.

Kremenchuk has close connection with neighboring cities – Komsomolsk and Svetlovodsk. They were built in 1961 for workers of Poltava Mining and Processing Plant(GOK) and Kremenchuk Hydroelectricity.

The villages of Kremenchuk agglomeration are - VilnaTereshkivka;- Kryvushi;- Mala Kohnivka; - Pischane;- Sadky; - Checheleve;- Chervona Znamianka.

4.2.6.Industrial potential18

Page 19: Industrial park concept

Kremenchuk is a big industrial center of Poltava. There are 86 big industrial enterprises, 58 building companies and about 14,000 businesses companies in Kremenchuk.

4.2.7 Service sector.Kremenchuk provides more than 500 types of consumer services with tendency to

expand them.There are about 2400 businesses companies of trade and domestic purposes:

- Shops (986 stores), including:- grocery stores (365); - non-food stores (585); - mixed assortment (360);- retail stores (84).

There are national and local stores of different activity profile in the city: universal hypermarkets "Velmart", "METRO Cash and Karry" "Fozzy," "Furshet" and "Amstore"; building supermarket "NovayLinia", shopping centers ("Mega", "Galaktika "" Proletarskiy"etc).

Aslo there are national and local networks: food network("ATB-Market", "EKO-market", "Sudar", "Optovychok", "Silpo», «Billa»), furniture network ("World of Furniture"), electronics stores ("Foxtrot", "Eldorado", "Brain", "Technopolis", "Allo»”, «Comfy»).

There are many local shops and networks:- Restaurant business - 320 institutions.- Network of restaurant business of the city has 12,800 seats.-Markets. There are 14 markets without special profile. Pridneprovskiy,

Novoivanivskyi, Central and Auto Markets are the most popular.- There are 450 service companies.- Cinema: "KinoPalace" of "Zebra", "Naftokhimik" of "Naftokhimik"palace."

There are several night clubs: "Jose", "Zebra", "Orekh", "Vanil" (Shopping mall "Europe").

- Hotels: four-star hotel "Europe" and three-star "Dnipro stars", "Kremin", "Ontario", "Pantagruel", "Grace".

- Banks:- International Bank (OTP Bank);- National (PryvatBank, IndustrialBank, Sberbank);- Local (AvtoKrazBank, PoltavaBank).

Health Network. Kremenchuk consists of 14 hospitals, local government bodies and 12 regional establishments. Also the medical services are offered by many private clinics.

4.2.8 Communal service.19

Page 20: Industrial park concept

Kremenchuk housing and communal services has 40 companies and employs 2,300 people.

The leaders:- Public Enterprise “Kremenchuk transport enterprise-1628”- PE “ Misksvitlo”- PE “Kremenchuk contractor specialized road repair and construction

management”- PE “Kremenchuk trolleybus management”- PE “ Kremenchukvodokanal”- PE “ Teploenergo”- PE “Special funeral services”- Management company of LLC "Zhytlorembudservis";- Management company of LLC "Dobrobyt."These enterprises provide greening, lighting the city, its sanitation and capital and

current repairs of roads, accomplishment of territories, repair and routine maintenance of housing, etc.

Housing stock, which belong to the local community of the city, is 65584 m ². 57670 (90%) apartments are privatized.

1239 houses are owned by the city. There are 244 houses up to 25 years after construction, 712 buildings aged from 25 to 50 years, 175 buildings aged from 50 to 75 years, 67 buildings aged over 75 and 41 inthepoor house condition.

4.3 Transport.

4.3.1 Public transport.The main public transport are bus service (АО АТП-15307), trolleybus service

(PE «Trolleybus management») and 13 private carriers enterprises.Trolleybus routes length is 54 km. Trolley park consists of 40 old and 7 new

machines. The ticket price is 1.50 UAH and free travel for pensioners as of July 1, 2013.Bus service has more than 34 routes. The total length of the bus route network of

the city is 311.7 km. There are about 28 taxi services in Kremenchuk.

4.3.2 Inter-cities transport.

The city has a bus station, which is the center of inter-city bus transportation. There are also inter state routes (eg, Kharkiv, Chisinau). Buses and taxis are also sent from the train station to Kyiv, Kharkiv, Dnipropetrovsk, Poltava, Svitlovodsk, Vlasovka and Komsomolsk Central Market.

4.3.3 Railway transport.

20

Page 21: Industrial park concept

There is a railway station. Also there are Kriukov railway station and several others railway stations.

Currently there is a railway connection to Kyiv, Kharkiv, Dnipropetrovsk, Simferopol, Minsk, Moscow, St. Petersburg.

4.3.4 River transport.There are river port and passenger terminal in the city.4.3.5 Air connection.Nearest international airports are:• Boryspil - 254 km.• Kyiv - 293 km.• Dnepropetrovsk - 166 km.• Kharkiv - 250 km.• Kremenchuk - the helicopter platform of Kremenchuk Flight College of National

Aviation University, which can take different forms and helicopters. It is situated just 500 meters from the industrial park.

4.4 Ecological situation.Kremenchuk industry is a center of urbanization of the region. It has a significant

impact on the environment pollution. There are about 100 companies registered in public health department as harmful for the environment. PJSC “Ukrtatnafta”, PJSC “Carbon Black Plant”, Kremenchuk TEC, PJSC "Kremenchug Wheel Plant" , PJSC “AvtoKrAZ”, PJSC “Kremenchuk Steel Works”, PJSC “Kremenchuk road-building machinery plant” PJSC “Kriukov Car Building Works” obtain 95% of all polluting emissions.

Kremenchuk air pollution level is the largest among the city of Poltava region (97% of all industrial and domestic waste).

4.5 Industrial park location.Kremenchuk City Council, as the initiator of the industrial park "CENTRAL"

creation, gave the land parcel for its location with a total area of 168.55 hectares, cadastral number 5310436100:01:003:0003 in northern industrial center of the city.

21

Page 22: Industrial park concept

- - - - - - - Railway Highways Water connection

According to extract from the State Land Registry on the land parcel:

Extract number НВ-5300404842013Cadastral number 5310436100:01:003:0003

Location Poltava oblast, Kremenchuk, Northern industrial hub

Specialization Enterprises of other industry22

Page 23: Industrial park concept

Land categoryLand parcels of industry, transport, communications, energy, defense and other purposes

Type of land useIndustrial park “CENTRAL” creation

Total area 168,55 hаInformation about limitation of land use No record

Additional information:Building development Territory free from constructionForm of land PolygonRelief of land Flat Fence without fenceNormative land charge during the construction

79,6 million/UAH

Market price of the land 337,1 million/UAHRent payment for land use during construction

2,4 million/UAH

Cadastral plan of the land

Description of boundaries of the land:From А to Б – Kremenchuk City Council;From Б to В – Subsidiary Enterprise “Ukrtransnaftaproduct”;From В to Г – Kremenchuk City Council;From Г to Д – Subsidiary Enterprise “Ukrtransnaftaproduct”;From Д to Е – Kremenchuk City Council;From Е to Є – Subsidiary Enterprise «Southern Railway»;From Є to Ж – Kremenchuk City Council;

23

Page 24: Industrial park concept

5. Period of the industrial park “CENTRAL” creation. Extract to art. 9 of the Law of Ukraine "On Industrial Parks", "term of the land use

within the industrial park must be at least 30 years from the date of making decision on industrial park creation."

Industrial Park "CENTRAL" in Kremenchuk is to establish for a period of 50 years according to Kremenchuk City Council Decision.

6. Requirements for the industrial park members.

6.1 Organization of the industrial park "CENTRAL" functioning.

Kremenchug City Council, as the initiator of the industrial park “CENTRAL” creation, is conducting the tender on selection of the management company to ensure the industrial park functioning.

According to the Law of Ukraine “On Industrial Parks”:“management company of the industrial park (hereinafter referred to as

‘management company’) means a legal person irrespective of its organizational form created according to the laws of Ukraine and selected in compliance with the Law of Ukraine "On Іndustrial Parks", with which the initiator concluded an agreement on creation and functioning of the industrial park”

The main task of the management company is filling the industrial park with members and providing comfort for their economic activity in the industrial park.

Basic requirements for the management company:1. Management company must be a legal entity, irrespective of its legal form

created according to the laws of Ukraine and selected according to the Law of Ukraine "On industrial parks."

2. Implementing the business plan approved by the industrial park initiator and developed by the management company.

3. Implementing the provisions set out in the Industrial Park concept.4. Concluding the agreement with Kremenchuk City Council on a lease of land

with cadastral number 5310436100:01:003:0003.5. Paying rent for land use with cadastral number 5310436100:01:003:0003.6. Ensuring the industrial park filling by the members in accordance with the

agreed scheme of industrial park building development.7. Transferring the land of the industrial park into sublease.8. Concluding the contracts for the provision of services to members of the

industrial park.9. Providing the quota for the workers employment of Kremenchuk region is not

less 89% of the total number of involved employees within the boundaries of the industrial park.

10. Giving the preference to materials produced in the territory of Ukraine.11. Giving the preference to Ukrainian commercial entities to provide services to

the industrial park members.12. Rendering the report to the industrial park initiator.

24

Page 25: Industrial park concept

6.2 Requirements to the industrial park members. 1. The industrial park members must be a legal entity irrespective of its legal form,

registered within the territory of the administrative-territorial unit of Ukraine where the industrial park is situated.

2. The enterprises of the industrial park members must be profitable. 3. The industrial park members must create new job places, i.e. at least 20 job places

per hectare of the general square and hire at least 89 % of workers, who live in Kremenchuk and Kremenchuk district of Poltava oblast.

4. The industrial park members must carry on business within the frameworks of the current legislation of Ukraine.

5. The industrial park members must have a program of their development and carrying on business in the park territory at least for 5 years.

6. They must timely pay up a lease for the land use within the territory of the industrial park.

25

Page 26: Industrial park concept

7. Planned consumption of energy and communal services by the industrial park members.

According to information, provided by potential energy source and communal services suppliers, there are no restrictions for the industrial park members in the amount and terms of supplying their services. The management company receives authorized documents, established by the Law, and carries out all necessary building and installation work by order of the industrial park members to get these services.

Planned indexes estimation of energy materials and communal services usage necessary for industrial park functioning*.

№Energy materials and communal services Expected indexes*

1. Natural gas supply9000 thousand

m3/year2. Electricity supply 6 MW3. Water supply 250 thousand m3/year4. Sewage 250 thousand m3/year

Tacking:

* Planned indexes estimation was held on the basis of energy materials actual expenses by the Kremenchuk enterprises. The stated indexes will be corrected at the stage of the industrial park project development.

26

Page 27: Industrial park concept

Planned indexes estimation of energy materials and communal services usage necessary for industrial park functioning*

Sector

Energy materials and communal services Natural gas, thousandsm3/year

Electrical energy,

MW

Water supply, thousandsm3/year

Sewage,Thousands

m3/year

Sector 1 – «Hi-Tech» (machic engineering). 3030 2,5 84,16 84,16

Sector 2 – «Logistics» (logistics). 1412 0,5 39,22 39,22Sector 3 - «TechnoPolis» (ІТ technologies and electronics).

1817 1 50,49 50,49

Sector 4 - «EcoLife» (reserve sector).

- - - -

Sector 5-«Еnergetics» (alternative energetics and machinery).

2741 2 76,13 76,13

Total amount 9000 6 250 250Tacking:

* Determining the required level of energy materials and communal services usage by the industrial park members is possible only in the designing process of enterprises and approval of the industrial park building master plan.

27

Page 28: Industrial park concept

8. Plan of the industrial park developmentPlan of the industrial park development includes:

1. Infrastructure development of the industrial park.

2. Industrial park construction. 3. Providing industrial park members

with services.

8.1 Infrastructure development of the industrial park.According to the Law of Ukraine “On Industrial Parks”: infrastructure

development of the industrial park means implementation of a set of measures and services on preparation of the land plots, designing, construction, reconstruction, refurbishment and arrangement of the objects of engineering and transport infrastructure and other objects by the management company and/or the creation initiator according to the conditions of the Agreement on creation and functioning of the industrial parks and the Law of Ukraine On Regulation of Town-Planning Activities with the aim of creating appropriate conditions for performing economic activities;

The land parcel for the creation and functioning of the industrial park “CENTRAL” is situated in the northern industrial hub. There are lands of north industrial hub enterprises, Kahamlytska station and railway track Kriukiv-Kremenchuk on the borders with the park territory.

Surrounding engineering infrastructure:Highways: Ernst Telman st. is lying from the west side of the land area with a distance

of 100 meters. Its widening is worked on Kremenchuk general schedule of the city. The industrial park territory is limited by urban area: Svishtovska st., 50-

richchia Zhovtnia and Haluzevyi Side Street.A drop-off to the industrial park territory can be organized from different

sides and now-existing drop-offs also can be used. Absolutely, creation of new highways or reconstruction of already existed must be held within the frameworks of agreed general plan of the city, fulfilling all requirements of the regulatory approval system of Ukraine.

Railway service: Kremenchuk is a large industrial center the work of which is provided by the

railway work. There are passenger railway station and freight station.The industrial park territory is situated for 2,3 km from the railway station

(Kremenchuk station) and for a 200 m from Kahamlytska station.The railway usage in economic activity by the industrial park members is

possible in two ways:

28

Page 29: Industrial park concept

- Combined – the freight delivery to the Kahamlytska or any other station and further automobile transportation;

- Direct – the building of their own railway.The procedures of railway usage are determined by the management

company according to the industrial park members’ requirements. Inland waterway: Kremenchuk is situated on both banks of the Dnipro river – one of the main

river transport arteries of the country.According to information of specialists, river and marine shipments are the

most suitable due to their cost. There are river port and marina. The river port is situated on Flotska st., and

marina is situated on Pershotravneva st.The usage of river transportations by the industrial park members is possible only in combined way.

Air connection:There is no airport in Kremenchuk, but it is possible to get Kremenchuk

using airports in Kyiv, Boryspil, Dnipropetrovs’k and Kharkiv, which are situated in short distance with Kremenchuk. There is a helicopter platform in Kremenchuk, which is situated on the territory of Kremenchuk Flight College of National Aviation University and also at a distance of 500 m from the industrial park. It is possible to receipt helicopters of different grades there.

External utility lines:According to the “Principles of Kremenchuk development”, agreed on the

session of Kremenchuk City Council from 28.12.2010, the territory of the industrial park relates to the zone of advanced, ecologically safe, industrial and producing objects of small and middle business, scientific and industrial objects, storage facilities and bases, communal facilities (according to town-planning reasons or some other town-planning documents).

The area partly caught sanitary-protection zone of the industrial enterprises and also it got to the soundproof railway zone. The quarters of the area lying in connection net from the south-east and west sides (from the side of Telman st.). The available networks partly caught the borders of land property (from the side of Telman st.).

According to information of potential energy suppliers, the distance to the utility networks, which can be connected to the industrial park network, is*:

29

Page 30: Industrial park concept

Energy source Distance Tacking

Water supply405 m

Heroes Stalingrad str., pipe network DN=400 mm

405 mHeroes Stalingrad str., pipe network DN=200 mm

Sewage 405 mHeroes Stalingrad str., sewage net DN=300 mm

Natural gas 1000 mHalusevyi side street, gas pipe line DN=200 mm

Power supply 2900 m Halusevyi side street

TelecommunicationsThe net is lying inside the industrial park territory

* Tacking:

The industrial park territory is situated at the industrial area, the place of which is defined by position of Kremenchuk combined heat and power station. Large industrial enterprises are situated in the territory of industrial hub. In the process of industrial hub territory building, utility lines were designed with the perspective of new enterprises production startup and already-existing enterprises development. The economic situation in the country influenced the production sphere development. The analysis of the current situation gives the reasons to think that amount of industrial enterprises production, which are placed in the territory of the industrial hub, decreased. It led to decreasing of energy supplies usage. That is why, during industrial park building, its members will be able to use available capacities of already-existing utility networks and also to create their own ones.

The utility interface and the terms of their laying can be changed during the process of the general plan creation on the industrial park building.

8.2 The construction of the industrial park.The construction of the industrial park is one of the main tasks of the

management company, which must agree the relevant plan with Kremenchuk City Council.

Considering the city priorities of the production branches development, Kremenchuk City Council admits a phased building of the industrial park territory:

30

Page 31: Industrial park concept

StagePeriod of

construction*

Expected investment

amount, million$ USD

Industrial park sectors

Stage №1 2013-2015 170,0 Sector 1 – «Hi-Tech» (machical engineering).Stage №2 2014-2016 80,0 Sector 2 – «Logistics» (logistics).

Stage №3 2014-2017 102,0Sector 3 – «TechnoPolis» (ІТ technologies and electronics).

Stage №4 2015-2018 -Sector 4 – «EcoLife» (reserved sector).

Stage №5 2014-2018 150,0Sector р 5 – «Еnergetics» (alternative energetics and machinery).

502,0 TOTAL AMOUNTTacking:

* The period of the industrial park construction depends on next factors: - prompt financing and work performance on the industrial park territory outfitting;- executive management of the management company which must attract industrial park participants;- authorities and management company cooperation in consent documents execution;- domestic and foreign economic situation;- availability of the body which will accompany the industrial park participants.Terms of the park construction may be changed during its development on the basis of agreed issues of both parties.

8.3. Service Delivery.

Attracted by the management company, industrial park participants conclude contracts about land sublease and services, which are provided by the management company. The list of services and their conditions are set by the management company of the industrial park and members of the industrial park.

31

Page 32: Industrial park concept

9. Needed resources for the creation and functioning of the industrial park and expected sources of their attraction.

№ The list of expenses Financing sourcesExpenses, thousands

UAH

1Preparatory period of industrial park "CENTRAL" creation

Municipal budget 1015

2

Development of design specifications and estimates of infrastructure creation for providing the industrial park with energy supply and transport

Municipal budget 768*

3

Performance of work oriented at infrastructure creation for providing the industrial park with energy supply and transport

Municipal budget, State Budget of Ukraine

25600

4 Forecasted amount of investment Management company4016000 (502,0

million $ USD)

Tacking: * The analyses of information, given by specialists in the sphere of industrial

facilities design, the amount of design specifications and estimates of industrial objects designing is 3% to a quota. The preliminary cost of works on provision of the necessary facilities of the industrial park can be 25.6 million. (3.2 million USD), i.e. the size of the design work and preparation of estimates can be 0.768 million UAH.

Extract from Article 34 of the Law of Ukraine "On industrial parks": “State support of works on provision of the necessary facilities of the industrial park can be carried out by state and local budgets costs or by costs of any other authorized sources.

The authorized state body, the Council of Ministers of the Autonomous Republic of Crimea, local state administrations and executive bodies of local councils in the manner provided by law, annually submit proposals to the State

32

Page 33: Industrial park concept

Budget of Ukraine project and to the draft decisions of relevant local budgets on financial support works on provision of the necessary facilities of the industrial park.

On purpose of creation and functioning of the industrial parks the authority supports management companies and initiators of their creation, providing them with non-interest loans and non-refundable target financing of works on provision of the necessary facilities of the industrial park. Management companies are business entities and they receive costs provided by The Law on the State Budget of Ukraine for the relevant year.

The cost works on provision of the necessary facilities of the industrial park provided through co-financing budgets of Kremenchug City Council, Poltava region budget and the State budget of Ukraine.

№Kinds of works

The cost of designing(thousand,

UAH)

The cost of building,

(thousand, UAH)

The total cost,

(thousand, UAH)

The sources of financing

The state budget

(thousand/UAH)

The city budget

(thousand\UAH)

Other sources

(thousand /UAH)

1.

Connecting to a power line

500 22770 23270 5800 1860 15610

Cable line with total length …meters

Building of transformer substationSwitchgear installation Internal supply line Receiving of capacities

2

Connecting the water supply

230 450 680 170 50 460

Laying the water supply line with total length …metersHydraulic unit buildingPartitioning device installationInternal water supply net

3 Connecting to the sewage net

200 550 750 190 60 500

33

Page 34: Industrial park concept

Lying the sewage line with total length …meters Sewage pump station buildingPartitioning device installationInternal sewage net

4

Connecting to the gas-supply net

150 750 900 230 70 600

Lying the gas-supply net with total length …meters Gas regulating points buildingPartitioning device installationInternal gas-supply net TOTAL SUM 1080 24520 25600 6390 2040 17170

Pro forma estimation:

Exact figures will be given during design estimate documentation.

Kinds of works

The cost of one

running meter, UAH

Approximate length, meter

Installation of additional

devices, substations,

thousand UAH

The total cost,

(thousand, UAH)

Connecting to a power line net

1200 2900 19290 22770

Connecting the water supply net

1112 405 - 450

Connecting to the sewage net

1112 405 100 550

Connecting to the gas-supply net

500 1000 250 750

34

Page 35: Industrial park concept

The scheme of communications laying

Connecting to a power line net

Connecting to the gas-supply net

Connecting the water supply net

35

Page 36: Industrial park concept

Connecting to the sewage net

Connecting to the telecommunications

10. The organizational model of the industrial park functioning:The initiator of the industrial park creation makes a decision on industrial

park creation. The initiator conducts the tender on the management company selection. The management company works out the industrial park building

development.The management company concludes contracts with the industrial park

members. The management company is accountable to the industrial park initiator and his authorized representative.

The decision to liquidate the industrial park is under jurisdiction of the initiator of its creation.

The initiator of the industrial park creation independently determines procedure for interaction with the management company.

36

Page 37: Industrial park concept

11. Expected results of the industrial park functioning. 11.1 General tendencies.

- Implementation of the Kremenchuk City Council resolution on the industrial park creation.

- Cash flow increasing to the budgets of all levels. - New job places creation for Kremenchuk citizens and Kremenchuk district.- Increasing the business activity level in Kremenchuk.- Support of the small and medium business development.- Increasing the Kremenchuk, Poltava oblast and Ukraine image. - Implementation of the state Programs on investment secure, business

activity and social programs support. - Investments increasing, secured to the real sector of economy.- Attraction of the new technologies of goods and services production. - Development of the partnership between members of the industrial park and

enterprises of the city, and also partnership with small and medium business representatives.

- Increasing the social standards of life of Kremenchuk and its district citizens.

- Activating the work of Kremenchuk northern industrial hub.

11.2 Expected results of the industrial park functioning. № Index Amount Tacking

1 Expected investments amount, total* 502,0 million $ USD1.1 Sector 1 – «Hi-Tech» (machanic endineering). 170,0 million $ USD1.2 Sector 2 – «Logistics» (logistics). 80,0 million $ USD1.3 Sector 3 - «TechnoPolis»

(ІТ technologies and electronics).102,0 million $ USD

1.4 Sector 4 - «EcoLife» (reserve sector).

-

1.5 Sector 5-«Еnergetics» (alternative energetics and machinery).

150,0 million $ USD

2 Creation of new job places, total amount 4225 workers2.1 Sector №1 1417 workers2.2 Sector №2 674 workers2.3 Sector №3 852 workers2.4 Sector №4 -2.5 Sector №5 1282 workers

Tacking:

37

Page 38: Industrial park concept

* The amount of secured investments may be changed according to management company work on the industrial park building development.** The number of job places may be changed due to producibility of enterprises, which will placed on the territory of the industrial park.

11.3 Expected advantages of the industrial park “CENTRAL” functioning after its building development.

№ Expected advantagesSum,

thousands, UAH

Tacking

1 Local budget (rent for land use) 24002 Taxes and fees:

2.1Pension Fund of Ukraine*

6480040% social due of enterprise

3,6% social tax of worker

2.2Municipal budget (income tax)**

2230015% on the part of worker’s salary

2.3 Budget of Ukraine (VAT-20%) *** 88400

2.4 Budget of Ukraine (income tax)****

10100

2.5 Multidisciplinary cooperation impact

Will be clarified after conclusion of appropriate agreements

Tacking:* The Pension Fund of Ukraine approved the average salary (income) per one insured person in the amount of 2,932 hryvnia 06 kopecks which will be used in determining the rate of wages for April 2013 setting the pension according to the Law of Ukraine on “Obligatory state pension insurance”.

№ Index Amount

Investment, thousands, UAH per year

Salary, thousands

, UAH per year

Investment, thousands,

UAH 3,6% 40%

1 Creation of new job places 4225 1794,806 19942,291 2,932 21737,097

1.1Sector 1 – «Hi-Tech» (machic engineering ).

1417 853,705 9485,606 2,932 10339,311

1.2Sector 2 – «Logistics» (logistics).

674 1079,164 11990,707 2,932 13069,871

1.3 Sector 3 – «TechnoPolis» (ІТ technologies and electronics).

852 1623,812 18042,355 2,932 19666,167

1.4Sector 4 – «EcoLife» (reserved sector).

- - - - -

1.5 Sector 5 – «Еnergetics» 1282 1794,806 19942,291 2,932 21737,09738

Page 39: Industrial park concept

(alternative energy and machinery).

** Local budget

№ Index Amount

Salary, thousands, UAH per

month

Tax income 15%,

thousands per year

2 Creation of new job places 4225 2,932 22297,860

2.1Sector 1 – «Hi-Tech» (machic engineering).

1417 2,932 7478,359

2.2 Sector 2 – «Logistics» (logistics). 674 2,932 3557,102

2.3Sector 3 – «TechnoPolis» (ІТ technologies and electronics).

852 2,932 4496,515

2.4Sector 4 – «EcoLife» (reserved sector).

- - -

2.5Sector 5 – «Еnergetics» (alternative energy and machinery).

1282 2,932 6765,883

*** State budget VAT-20%.According to information provided by the site http://finance.ua/, the

average amount of services, focused on saving the costs on the deposit accounts with a charged interest in the end of the deposit year (in terms of dollars USA) for legal bodies, is accounted by banks and is:

LEGAL ENTITIES DEPOSITS PER MONTH

1 month 3 months

6 months 12 months

UAH 13.50% 17.00% 18.00% 17.00%

USD 3.50% 5.00% 6.00 7.00%

EUR 3.50% 4.00% 5.00% 6.00%

Considering the fact that investment in production is more risky than cooperation with the banking sector, the rate of capital return should exceed the risk-free rate by the level of predicted risk.

39

Page 40: Industrial park concept

In Ukraine it is thought that the level of the risk-free rate is adequate according to the level of currency deposits of legal entities and the sum is paid within 12 months since the opening of the deposit.

During calculations, the rate of return of the capital is set at 10% per annum. Taking into account that expected investment amount is to be 502 million $ USA, the rate of capital return will be 50,2 million $ USA.

One of the requirements for participants of the industrial park is that their businesses must be profitable.

Considering the objecting reality, the level of the minimal profitability is set at 10% level.

A minimum level of revenue from economic activities of the industrial park participants can be 441, 8 million UAH per year.

As the practice shows, manufacturing companies choose general taxation system, i.e. VAT.

In this case, the level of 20% VAT can reach 88.4 million UAH per year.

**** Income taxThe minimum income is set at the level of the minimal profitability of the enterprise, which is 10 %, i.e. 40, 2 million UAH per year.

The income tax is 25 %, i.e. 10, 1 million UAH per year.

11.4. Invest project estimationThe investment project estimation on creation and functioning of the

industrial park will be held on the basis of agreed business plan of the management company, which will win the tender on management company selection of the industrial park “CENTRAL” in Kremenchuk.

40

Page 41: Industrial park concept

41