Zeeshan Estimation

Embed Size (px)

Citation preview

Page 1: Zeeshan Estimation

Syed Zeeshan Nasir

Project Software EstimationIS/17133/Aut-07

BS 4th B

Page 2: Zeeshan Estimation

Software Project Estimation Outline:

Estimation overviewEstimation resources Estimation decompositionEstimation TechniqueEstimation methodsSlimCocomo

Page 3: Zeeshan Estimation

EstimationEstimation is the art of scienceEstimation is the feasibility

reportEstimation provide a road map

for success software engineering

All software product depend upon estimation

Page 4: Zeeshan Estimation

Why its important to you!

Software project implemented Software costingQuality software productTime DurationSolution of future problem

Page 5: Zeeshan Estimation

Estimation Resources

Human resourcesReusable SW ResourcesEnvironmental Resources

Page 6: Zeeshan Estimation

Decomposition technique

Software SizingProblem Based Estimation

Page 7: Zeeshan Estimation

Estimation Method

An estimation method to be used with experimental design

An estimation method to be used with non-experimental design

An estimation method to be used with both experimental and non-experimental design

Page 8: Zeeshan Estimation

Cost Estimation Models

SLIM (Software Life Cycle Management)

Calibration BuildAdvantages of SLIMDrawbacks of SLIM

Page 9: Zeeshan Estimation

COCOMO'81

Boehm's COCOMO model is one of the mostly used models commercially

Basic, intermediate, detailedAdvantages of COCOMO'81Drawbacks of COCOMO'81

Page 10: Zeeshan Estimation

started in late 90s COCOMO'81 is not enough to apply to

newer software development practices COCOMO II has three different models The Early Design Model The Post-Architecture Model The Importance of Good Estimation

COCOMO'II

Page 11: Zeeshan Estimation

Any Question ?

Only relevant Question