Work Breakdown Structure Subtitle

Work breakdown Structure

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Work breakdown Structure

Work Breakdown Structure

Subtitle

Page 2: Work breakdown Structure

WBS Characteristics:

▪ The Work Breakdown Structure is a hierarchy which specifies the list of tasks involved in a project – down to the finest detail.

▪ The WBS splits the task list up into major ‘packages’

▪ On the following slide, is the WBS for the project to outsource these Learning Materials.

Page 3: Work breakdown Structure
Page 4: Work breakdown Structure

Packages:

▪ The split of the task list into different packages should be logical, and also compatible with regards to cost control and reporting.

▪ For each Package, it should be possible to test whether the entire package is completed or not.

▪ You will see 5 different packages in the previous example.

Page 5: Work breakdown Structure

Lowest Level:

▪ The lowest level of each activity on a WBS should be an individual task

▪ This task should be possible to complete by an individual, or team, within a reasonable defined period of time.

▪ For example, delegating the task of drawing up action lists could be completed by an individual within a defined period of time, such as one afternoon.

Page 6: Work breakdown Structure

Limitations to the WBS:

▪ No consideration for the order in which tasks should be carried out, and whether a task is dependant on another.

▪ No representation of how long each task might take.

▪ Does not show you who, or what resources are involved in each task.

Page 7: Work breakdown Structure

Alternatives to WBS:

1. Product Breakdown Structure

2. Cost Breakdown Structure – Completed AFTER the Work Breakdown Structure and Product Breakdown Structure

Page 8: Work breakdown Structure

Product Breakdown Structure:

• This is a tool for dealing with complex products, such as the motorcycle in the opposite example.

• The PBS provides a means for identifying all the components that make up a particular product.

• It is worth noting the Project Management methodology PRINCE uses the PBS as an alternative to the WBS.

Page 9: Work breakdown Structure

Cost Breakdown Structure:

• The CBS can only be completed after the WBS and PBS (if any). This is because, for example, the costs of labour should be possible to cross reference with the WBS.

• This is a tool for identifying each cost category associated with a project

Page 10: Work breakdown Structure

Sources and Further Reading:

▪ Field, M. and Keller, M. (1998), Croatia: Thomson Learning– Chapter 2.1

▪ Servello, M. and Evans, M. W. (2002) Work Breakdown Structure. Encyclopedia of Software Engineering.