Project Vital Signs

Page 2: Vital Signs Thoughtworks

My fellow IT practitioners… IT has lost

trust and credibility with the business

Page 3: Vital Signs Thoughtworks

How?

Poor track record Poor visibility

ROI hard to quantify

Page 4: Vital Signs Thoughtworks

Restoring trust and credibility begins with the Project

Page 5: Vital Signs Thoughtworks

Simply saying “the Project is ‘on track’”

is not good enough

Page 6: Vital Signs Thoughtworks
Page 7: Vital Signs Thoughtworks
Page 8: Vital Signs Thoughtworks

Need to show how and why

Project is on track

Page 9: Vital Signs Thoughtworks

The Need

Holistic view into the State of the Project

Page 10: Vital Signs Thoughtworks

Project as a Patient

Page 11: Vital Signs Thoughtworks

Project as a Patient

Page 12: Vital Signs Thoughtworks

In Medicine…

Medical History x Tests x Vital Signs x Experience ê

Diagnosis

ê  Treatment

Page 13: Vital Signs Thoughtworks

Vital Signs

Page 14: Vital Signs Thoughtworks

Vital Signs

Page 15: Vital Signs Thoughtworks

Vital Signs Simple, quantitative, near real-time metrics

conveyed via a chart published to a location

and easily referenced by all

Page 16: Vital Signs Thoughtworks

PMBOK Project Levers

Page 17: Vital Signs Thoughtworks

PMBOK Project Levers + 1

Page 18: Vital Signs Thoughtworks

Objectives with Vital Signs

•  Bring  visibility  into  all  5  project  levers •  Simple,  quan9ta9ve,  near-­‐real  9me  metrics •  Publish  to  charts  in  full  public  display •  Where  possible  include  history  and  trends

Page 19: Vital Signs Thoughtworks

Project Vital Signs

1)  Scope Burn Up 2)  Current State of Delivery 3)  Budget Burn Down 4)  Delivery Quality 5)  Team Dynamics

Page 20: Vital Signs Thoughtworks

Scope Burn Up

Page 21: Vital Signs Thoughtworks

Schedule x Scope =

Expected Delivery Date

Scope Burn Up

Page 22: Vital Signs Thoughtworks
Page 23: Vital Signs Thoughtworks
Page 24: Vital Signs Thoughtworks
Page 25: Vital Signs Thoughtworks

Current State of Delivery

Page 26: Vital Signs Thoughtworks

Scope x Team =

Real-time state of delivery

Current State of Delivery

Page 27: Vital Signs Thoughtworks
Page 28: Vital Signs Thoughtworks
Page 29: Vital Signs Thoughtworks
Page 30: Vital Signs Thoughtworks

Budget Burn Down

Page 31: Vital Signs Thoughtworks

Schedule x Budget =

$$$tatus

Budget Burn Down

Page 32: Vital Signs Thoughtworks
Page 33: Vital Signs Thoughtworks
Page 34: Vital Signs Thoughtworks
Page 35: Vital Signs Thoughtworks

Delivery Quality

Page 36: Vital Signs Thoughtworks

Schedule x Quality =

How good is the end product

Delivery Quality

Page 37: Vital Signs Thoughtworks
Page 38: Vital Signs Thoughtworks
Page 39: Vital Signs Thoughtworks
Page 40: Vital Signs Thoughtworks

Alternative to Bugs as a Measure of Quality

Page 41: Vital Signs Thoughtworks

Alternative to Bugs as a Measure of Quality

Page 42: Vital Signs Thoughtworks
Page 43: Vital Signs Thoughtworks

Team Dynamics

Page 44: Vital Signs Thoughtworks

Schedule x Team =

State of the team at different stages of delivery

Team Dynamics

Page 45: Vital Signs Thoughtworks

Tuckman Model of Group Development

Performing

Norming

Storming

Forming

http://en.wikipedia.org/wiki/ Forming-storming-norming-performing

Page 46: Vital Signs Thoughtworks
Page 47: Vital Signs Thoughtworks
Page 48: Vital Signs Thoughtworks
Page 49: Vital Signs Thoughtworks

Project Dashboard

Page 50: Vital Signs Thoughtworks
Page 51: Vital Signs Thoughtworks
Page 52: Vital Signs Thoughtworks
Page 53: Vital Signs Thoughtworks

Example Scenario

Page 54: Vital Signs Thoughtworks

Today is Aug 12

Start of Iteration 5

Production Release Sep 9, 4 weeks

Page 55: Vital Signs Thoughtworks

What is the Current State of the Project?

What is the Diagnosis?

What (if any)

Treatment is required?

Page 56: Vital Signs Thoughtworks

Vital Signs

Page 57: Vital Signs Thoughtworks
Page 58: Vital Signs Thoughtworks

Scope Burn Up

Page 59: Vital Signs Thoughtworks

Current State of Delivery

Page 60: Vital Signs Thoughtworks

Budget Burn Down

Page 61: Vital Signs Thoughtworks

Delivery Quality

Page 62: Vital Signs Thoughtworks

Team Dynamics

Page 63: Vital Signs Thoughtworks

What is the Current State of the Project?

Not going to make it.

Page 64: Vital Signs Thoughtworks

What is the Diagnosis?

The team is firing on all cylinders. Quality is good.

Not enough time to deliver the full backlog for the September 9th release.

Not enough money to carry us through the warranty period ending September

23rd.

Page 65: Vital Signs Thoughtworks

What is the Treatment?

Release on Aug 26th instead of Sep 9th. Includes 35 stories that are ready for,

currently in or have passed QA. Remaining 20 stories to be included

in a future release, budgeted for at a later time.

Page 66: Vital Signs Thoughtworks

Current State of Delivery : Before

Page 67: Vital Signs Thoughtworks

Current State of Delivery : After

Page 68: Vital Signs Thoughtworks

Current State of Delivery : After

Page 69: Vital Signs Thoughtworks

Scope Burn Up : Before Treatment

Page 70: Vital Signs Thoughtworks

Scope Burn Up : After Treatment

Page 71: Vital Signs Thoughtworks

Budget Burn Down : Before Treatment

Page 72: Vital Signs Thoughtworks

Budget Burn Down : After Treatment

Page 73: Vital Signs Thoughtworks

Delivery Quality : After Treatment

Page 74: Vital Signs Thoughtworks

Team Dynamics : After Treatment

Page 75: Vital Signs Thoughtworks

Key Messages

Page 76: Vital Signs Thoughtworks

Transparency is key

Page 77: Vital Signs Thoughtworks

Shared team responsibility

Page 78: Vital Signs Thoughtworks

Project Vital Signs