Upload
arjen1970
View
102
Download
2
Tags:
Embed Size (px)
Citation preview
E-plus meets Tulinx
Date: 25 June 2013
Your IT Partner forIntelligent Optimisation solutions
TULINX
Agenda
25 June 2013 2
Tulinx intro & portfolio overview
Minerva ETL
AWACS solution
RadioNDA solution
iSON (roadmap)
Introduction: TULINX B.V.
25 June 2013 3
We provide IT solutions and a toolbox to automate your Optimisation
Portfolio
25 June 2013 4
Services
Software Solutions
System Integration
Quick Scan
Let multi-vendor
systems work
together
Tool Consolidation
Quick Scan
Decrease number
of tools (proto-
types) on workfloor
Data Availability
Fix issues with data
access
Customize data
Mediation
KPI
Implementation
Vendor-independent
design
Radio NDA
Ticketing based
on network data
Auto-diagnose
and prioritize
network issues
AWACS
Webbased GUI
Modular, drag-and-
drop, all data available
for analyzing
Minerva
Extract, process and
load data (counter, kpi)
Cluster, modular, ve
ndor-independent
SOLUTION PORTFOLIO
25 June 2013 5
YOUR NETWORK
DATA
VISUALIZE
PERFORMANCE
ASSISTED OPTIMISATION
SELF OPTIMISATION
AWACS
RadioNDAiSON(Roadmap)
Minerva ETL
Minerva ETL / Overview
25 June 2013 6
3rd party
AWACS
Web Client
MINERVA
Data Warehouse
PM
FM
CORE
Drive-Test
cluster
CM
3rd party
GIS
CDR
Radio-NDA
Web Client
Cluster of
Minerva
Function
Process
(MFP)
modules
Extract Transform Load GUIs
25 June 20137
Minerva ETL / Cluster MFP modules
3GPP
Open
format
Custom
format
Harvesting
MFP modules
Minerva Cluster
Processor MFP modules
Aggregation Generic KPI
calculations
Proprietary KPI
calculations
Other
processing
Mix of open and proprietary modules
Data directly from OSS
Multi-vendor, multi technology
Modular and very flexible
25 June 2013 8
Minerva ETL / Plug-ins
MFP
Plug-in
PM
FM
CM
Aggregation
KPI
calculation
Trigger
Mapping
updates
MINERVA
Data WarehouseCDR
Drive
test
??
Minerva Cluster
MFP
Plug-in
MFP
Plug-in
MFP
Plug-in
MFP
Plug-in
MFP
Plug-in
MFP
Plug-in
MFP
Plug-in
Minerva ETL / Plug-ins
New plug-ins can be created
for currently unsupported
data formats
Takes about 1 – 3 weeks (depends on quality of specs and complexibilty of data)
Multi-vendor / Multi-technology
is no problem
25 June 2013 10
Minerva ETL / Database design
Entity
Directory
PM data
KPI data
Minerva
Custom
…
FM data
CM data
Open, modular design(it‟s possible to access data directly with 3rd
party BI solutions)
Generic linking via
entity directory (multi-vendor + multi technology)
New entities, counters and
parameters are added
automatically
High performance (online monitoring / ticketing)
25 June 2013 11
Minerva ETL / BI Solution examples
25 June 2013
Minerva ETL / Scalability
Consultants
Test engineers
R & D
Drive test
Network trial (e.g. LTE)
Test new SW release
Prototyping 30.000 cells
Minerva / COTS
Basic setup
100.000 cells
Minerva / COTS
Basic setup
Minerva trial / demo
20.000 cells
Low cost
Network operators Network operators Network operators
1 x 22u server rack 3 x 42u server rack
users
5 x workstation1 x laptop
hardware
case
users
hardware
case
users
hardware
case
users
hardware
case
Visualise all network performance now and in the future
25 June 2013 13
AWACS Key Features
• View KPI‟s, Trends, Neighbours, Config & Site details
• All network elements and All trends(incl. counters)
are accessible
• Very clean, powerful and easy-to-use web interface
• Multi-vendor, Multi-technology, HetNet support
• Open source and customisable
AWACS
• Flexible & Modular setup with widgets:
Chart, GIS, TOP N, etc.
• Use “drag and drop” to move between widgets
• Basic Formula editor for new KPI‟s
• One-click Chart export to .CSV or screenshot for ad-
hoc reporting
• Built-in .CSV tables for easy report building
Visualise all network performance now and in the future
25 June 2013 14
AWACS USE CASES :
• Real-Time Performance Monitoring
• Incident/Trend analysis
• Performance or Quality Reporting
• Site/Small Cell Integration
• Before/After analysis e.g. RAN swaps
• Pilots and special projects
• SLA monitoring
Visualise all network performance now and in the future
25 June 2013 15
25 June 2013 16
AWACS / Concepts
RelationsCustom relating of entities (e.g. Cells to site, sites to RNC, cells in a cluster)
AliasesAliases can be used for more human readable naming (e.g. Cellid instead of BTS id)
Tags
Entities can be tagged, forming custom sets.
Brussels: all network elements in Brussels
Ericsson: all Ericsson elements
Euro2012: all cells, relevant for Euro2012
4G: all 4G cells
Cluster42: all elements of cluster 42
AWACS bookmark example
25 June 2013 17
AWACS LTE example
25 June 2013 18
AWACS Small Cell example
25 June 2013 19
RadioNDA
25 June 2013 20
All data (PM, CM, FM, kpi) available
can be taken into account
Rich context for tickets
of related issues and data(assisted optimization)
Rule-based triggering + workflow
Automatic prioritization of tickets(automatically updated + autoclose)
Customizable (e.g. Exceptions)
Online issues,offline issues , capacity
management, configuration checks etc.
GIS
RadioNDA / Notifications and Tickets
21
• „Messages‟ notifying something happened• May lead to a ticket (depends on type and weight of messages)• Rules are specified with Python scripts
• Notifications may lead to ticket• Total weight of notifications is weight of ticket• New notifications will be linked automatically (weight increases)• When weight increases, issue still exists• When weight does not increase anymore, issue is „solved‟• Autoclose mechanism (engineers should only deal with relevant tickets)
• Workflow: assign, put on hold, close etc
Notifications
Tickets
25 June 2013 22
RadioNDA / Ticket - context
alarms
notifications
remedy tickets
W = 100
W = 100
W = 50W = 50
W = 0
W = 0
W = 200
W = 10
W = 0
configuration
remarks
TicketW = 510
23
RadioNDA / Process
PM
FM
CM
CDR
DT
CCR
CSSR
HSDPA
Config
Alarms
. . .
Pre-defined:
-Rules
-Scripts
- correlations
Trig
gers
Notification 1
Notification 2
Notification 3
Not. 1
+
Not. 2
+
Not. 3
Trig
gers
Ticket
Pre-defined:
-Rules
-Scripts
- correlations
RadioNDA / some trigger categories
25 June 2013 24
Configuration • Bad SC within x km or for neighbor
• Non symmetrical neighbor relation
• Neighbor relation distance larger then x km
• Relation added/deleted
Performance
Availability Cell availability, Downtime, Congestion
• bad CSSR, CCR for Speech, Packet yesterday
• Avg. RSSI Too Low/Too High
• HSDPA Access Probability, Bad EUL drop rate
• E1 Congestion, No RRC connections
• Increased Drop rate over 4 weeks
• RXQUAL67 DL/UL increase over 4 weeks
• PCHAGCH Blocking
Daily Weekly
ExamplesCategory
Other possible categories:
SLA management, event monitoring, data availability monitoring, etc, etc
Intelligent SON (iSON)(roadmap / to be integrated in AWACS)
Issue / Ticket(e.g radioNDA)
Proposal 1
Proposal 2
Proposal 3
Automatically
generated proposals
Engineer decides what to do
ChangeImplementation
Proposals can be customized (via scripting)
Engineer stays in control (responsibility)
Proposals can be automated by engineer
Issue / ticket(e.g radioNDA)
Proposal 1
Proposal 2
Proposal 3
Engineer has automated proposal 3
AutomatedOptimisation
Engineer has decided that proposal 3 can be automated
Results of automated proposals should be monitored (reports etc)
Intelligent SON (iSON)(roadmap / to be integrated in AWACS)
Intelligent SON (iSON) / scheme
25 June 2013 27
OTHER
- Objectives /Targets
- Customer Data
- Coverage simulationsAutomated
Analysis
Data
SON functions
SON
Coordinator/PilotAutomated, Optimised parameters
REPORTING
-KPI/QoS
-Automated SON functions
-Not automated issues/tasks
- Engineer Assistant
- Switch on/off automated tasks
AWACS
Intelligent SON (iSON) / design(roadmap / to be integrated in AWACS)
25 June 2013 28
Intelligent SON (iSON) / design(roadmap / to be integrated in AWACS)
25 June 2013 29
WHY AUTOMATE WITH TULINX
Supports
HetNet
Multi Vendor
Flexible
Customisable
Modular
Usability
Performance
Scalable
Future-Proof
30
25 June 2013 31
Contact us or more information
T: +31 13 504 6127E: [email protected]: www.tulinx.com
Saal van Zwanenbergweg 115026 RM TilburgThe Netherlands