14
Task 6 By : Julia Carolina Daud 5209100059 Luthfiya Ulinnuha 5209100115 Testing RANCANG BANGUN APLIKASI INSTALASI RAWAT INAP DENGAN PARADIGMA PENGEMBANGAN TERINTEGRASI MENGGUNAKAN ENTERPRISE SERVICE BUS (ESB)

Testing implementation kel 11

Embed Size (px)

Citation preview

Page 1: Testing implementation kel 11

Task 6

By :

Julia Carolina Daud 5209100059

Luthfiya Ulinnuha 5209100115

Testing RANCANG BANGUN APLIKASI INSTALASI RAWAT

INAP DENGAN PARADIGMA PENGEMBANGAN

TERINTEGRASI MENGGUNAKAN ENTERPRISE SERVICE BUS (ESB)

Page 2: Testing implementation kel 11

The testing process

Determining the test methodology

Planning the test

Designing the test

Performing the test

Page 3: Testing implementation kel 11

1. Determining the test methodology

The testing methodology that we use in this software testing

are;

The appropriate required software quality standard

The software testing strategy.

Page 4: Testing implementation kel 11

The appropiate required software

quality

Standart level that we use for software quality is:

Highest software quality standard

Software package requires highest software quality standard

considering the effect of software failure

Page 5: Testing implementation kel 11

Software testing Strategy

Incremental testing strategy

Why Incremental?

Because incremental do test per section in the software

modules (unit testing), followed by testing each module

integration (integration test), then the whole package is

tested (system testing)

What Incremental we use?

Incremental Top- Down

Page 6: Testing implementation kel 11

Which part using?

Black-box testing

Page 7: Testing implementation kel 11

2. Planning the test Performance Testing

1. Evaluate the program's ability to operate properly viewed from

the side of the reference needs. for example: data flow, the size

of the memory used, speed of execution, etc.

2. Find out the work load or the conditions of the

program configuration.

3. Specification of performance is defined at the specification

stage or design. Can be used for testing the limits of the

environment program.

Page 8: Testing implementation kel 11

Planning the test (cont’d) What to test:

Every functional requirement on public hospital

Which sources to use for test case:

SRS

Requirement Traceability Matrix

Who is to perform the tests:

Julia Carolina Daud

Luthfia Ulinnuha

Where to perform the tests:

Classrom and Laboratory

When to terminate the tests:

April, 16th 2012

Page 9: Testing implementation kel 11

3. Designing the test

1. Scope of the test

1.1 Software package name:

RANCANG BANGUN APLIKASI INSTALASI RAWAT INAP DENGAN PARADIGMA PENGEMBANGAN TERINTEGRASI MENGGUNAKAN ENTERPRISE SERVICE BUS (ESB)

1.2 Documents that provide the basis:

Final Project

o Rancang Bangun Aplikasi Instalasi Rawat Inap Dengan Paradigma

Pengembangan Terintegrasi menggunakan Enterprise Service Bus (ESB)

Page 10: Testing implementation kel 11

Designing the test (cont’d)

2. Testing

environment 2.1 Testing site

-Ebussiness Laboratory

2.2 Required hardware and firmware

Specification

Hardw

are

Processor Intel® Core™2 Duo CPU

E7500 @2.93 GHz 2.93 GHz

RAM 2.00 GB

Software

Operation

System

Windows 7 Ultimate

Web Server Apache Tomcat 6

Database MySQL

Language

Programming

Java, ZK

Editor Netbeans 6.8

ESB Synapse

Page 11: Testing implementation kel 11

Designing the test (cont’d)

3. Test details

3.1 Test Identification

Before we do the testing phase, we have RTM as our guidance

3.2 Test Objective 1. To find out as many as error as possible and to make software more

reliable and easily maintainable

2. to verify the affordibility

3. to verify the user friendliness

4. to verify the usefullness

5. to verify the performance

6. to verify the appearance

Page 12: Testing implementation kel 11

3.3 Cross-reference to the relevant design document and the requirement

document

Use Case SRS

Test Case RTM

3.4 Test level:

Performance testing

4 Test schedule

4.1 Preparation

• 2 weeks preparation

4.2 Testing

o April, 16th 2012

Page 13: Testing implementation kel 11

4. Performing the test Software test report

1 Test identification 1.1 Name:

RANCANG BANGUN APLIKASI INSTALASI RAWAT INAP DENGAN PARADIGMA PENGEMBANGAN TERINTEGRASI MENGGUNAKAN ENTERPRISE SERVICE BUS (ESB)

1.2 Documents:

• Use Case SRS

• Test Case RTM

1.3 Test site

• Ebiss Laboratory

1.4 Tes team members

• 2

Page 14: Testing implementation kel 11

2. Test environment

2.1 Hardware & Software

o Intel® Core™2 Duo CPU E7500 @2.93 GHz 2.93 GHz

o 2.00 GB

o Windows 7 Ultimate

o Apache Tomcat 6

o MySQL

o Java, ZK

o Netbeans 6.8

o Synapse

2.2 Preparation and training

• 2 months