Global CCS Institute Member MeetingBergen, 8 May 2012
TCM Mongstad
Alstom CCS & Chilled Ammonia Technology
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
CCS is essential for Power generation, for both Coal & Gas.
Power generation CO2 Emissions
Postponing CCS implementation will increase the ultimate cost to reduce GHG emissions.
TCM will enable rapid scale-upSource : Alstom analysis from IEA WEO 2011
0
5
10
15
20
25
Gt/
y
1990 2035Current Policies
path +6°C
2035New Policiespath +3,5°C
2035450 ppm
Needed path +2°C
Includes CCS 75 GWe
Includes CCS 540 GWe
Alstom – CO2 Capture Systems - P 2
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Clean coal and gas and industrial : Alstom has a full portfolio of tested & viable CCS technologies.
CCS needed on new plants and on the installed base, for both Coal and Gas.
Source: Vattenfall
Pre-combustion(New only)
Power Plant with CO2 capture
Post-combustion Oxy-combustion(New + retrofit) (New + retrofit)
Alstom – CO2 Capture Systems - P 3
Advanced Amines
Chilled Ammonia
Oxy-combustion
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Tests complete
Vattenfall Schwarze-
Pumpe Germany- 30 MWth
Oxy - Lignite
Dow Chemical Co. US -2 MWth
Adv. Amines - coal
Datang- China
Oxy 350 MWe lignite, Post 350 MWe eq. coal
Alstom BSF Windsor
US - 15 MWthOxy - coals
Getica - CET TurceniRoumania – >250MWe
Chilled ammonia - Lignite
PGE BelchatowPoland – 260 MWe
Adv. Amines - Lignite
DOE/Alstom Windsor
US – 3 MWth Chemical
looping - coal
2nd Gen
NER300
NER300
Selected for receiving EEPR funding
NER300: Applied for EU ETS New Entrant Reserve funding
EoN Karlshamn Sweden - 5 MWth
Chilled Ammonia–Fuel oil
WE – Energie US - 5 MWth Chilled Ammonia,
Coal
AEP Mountaineer US - 58 MWth
Chilled Ammonia, coal
Total LacqFrance - 30 MWth
Oxy - Gas
Operating
Alstom Labs Växjö Sweden – 0.25 MWth
Post C. – multi purpose
Large-scale projects-under development
White Rose CCS Project
UK - 426 MWe Oxy – coal
NER300
Commissioning / Startup
TCM Mongstad Norway - 40 MWth
Chilled Ammonia - Gas
EDF – Le HavreFrance – 5 MWth Adv. Amines - Coal
Alstom activity on pilots & demonstrations 1st and 2nd Generation CCS
RFCS EU -Darmstadt
Germany –1 MWth
Chemical looping - coal
2 Gen
Alstom – CO2 Capture Systems - P 4
Reaching demonstration
Support is essential
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
TCM is a critical step in the Roadmap to scale-up Chilled Ammonia!
Test RigsTest Rigs Validation Pilots
Validation Pilots CommercialCommercialIndustrial
PilotsIndustrial
PilotsLarge-scale
demonstrationLarge-scale
demonstration
AlstomVaxjö Sweden0.25 MWth
We Energies Pleasant Prairie USA - 5 MWth, CoalEoN Karlshamn
Sweden - 5 MWth, Oil
AEP Mountaineer USA - 58 MWth, CoalTCM Mongstad
Norway - 40 MWth, Gas
Getica Turceni Feasability Romania - >250 Mwe net, Lignite
20152006 2008 2009
Tests
successful
Tests completed Key TargetsIn operation In StartUp
Chilled Ammonia Process Update on Alstom roadmap
CO2 Capture Mongstad (CCM)Norway- 280 MWe + 350 MWth, CCPP
Alstom – CO2 Capture Systems - P 5
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Chilled Ammonia Process (CAP)
European CO2 Technology Centre Mongstad
(TCM)• Flue gases from natural gas CHP
plant and off-gases from the
RCC
• Validation plant, designed to
capture: 80 ktons CO2/year
(RCC) & 22 ktons CO2/year
(CHP)
• First CAP pilot on industrial source
• Incorporates learning from previous pilots
• Compact and efficient layout
• Unique Validation Features / Expectations.
Mongstad supports CAP validation on gas & industrialAlstom – CO2 Capture Systems - P 6
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
6586
0
50
100
150
200
250
300
Hard Coalwith CCS
2015
Gas CCwith CCS
2015
Nuclear Hydro Geo-thermal
WindOnshore
WindOffshore
SolarThermal
Solar PV
0
50
100
150
200
250
300
€ / MWh CoE Low Carbon technologies over 2011-2016 period (New Plants)
Reference case
CCS – A competitive low carbon solution
Source : Alstom analysis 2011. CCS Post amine 2015 costs, including on shore T&S and CO2 price (Flue Gas Recirculation case for CCS Gas CC) - Cost for firming intermittent Power Generation not accounted
EUROPE
Alstom CCS technologies for Coal &Gas competitive vs most renewables, including Wind and Solar.
© ALSTOM 2012. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
In Summary
Norway & TCM have shown leadership in developing the TCM facility -
Alstom is proud to be part of it, and intend to continue this partnership.
• Fossil Plants will remain for several decades, e.g. in emerging markets.
• CCS, for both coal and gas, is absolutely vital to reach 450 ppm target, in an economically sustainable way;
• Alstom developed promising, tested and viable CCS technologies, ready for demonstration & deployment.
• TCM Mongstad plant is an important step in the CAP roadmap, ready for demos which will introduce commercial technologies.
• Political willingness and Policy instruments similar to Renewables (e.g. Feed-In Tariffs, priority of dispatch) are the next steps needed to support demonstration and kick-start commercial phase.
Alstom – CO2 Capture Systems - P 8