NTPC India’s Largest Power Company….
Presented By; ISHU CHAUHAN E.C.E- 4th year 0728531017
33
TABLE OF CONTENTS:-TABLE OF CONTENTS:-
1.INTRODUCTION.1.INTRODUCTION. 2.PERFORMANCE STATISTICS.2.PERFORMANCE STATISTICS. 3.FEATURES.3.FEATURES. 4.OVERVIEW OF PLANT’s WORKING.4.OVERVIEW OF PLANT’s WORKING. 5.C&I DEPT.5.C&I DEPT. 6.THERMAL PLANT.6.THERMAL PLANT. 7.MAIN COMPONENT OF PLANT.7.MAIN COMPONENT OF PLANT. 8.CONCLUSION.8.CONCLUSION.
44
1975- NTPC was set up in 1975 with 100% ownership by government of INDIA . In the last 30 year NTPC Grown into the largest power utility in India
1997- in 1997 govt. of India granted NTPC status of NAVRATNA being on of the nine jewels of India, enhancing the power of the board of director .
2004- NTPC become a listed COMPANY with majority govt. ownership of 89.5% NTPC become 3rd largest by market capitalization of listed company.
2008- NTPC is largest power generation company in India.
Forbes global 2000 for 2008 ranked it 411 in the world.
INTRODUCTION
55
PERFORMANCEPERFORMANCE
STATISTICSSTATISTICS
66
DESCRIPTIONDESCRIPTION UNITUNIT 1998-991998-99 2009-102009-10 % OF INCREASE% OF INCREASE
Installed Installed
CapacityCapacityMWMW 17,78617,786 28,84028,840 62.1562.15
GenerationGeneration MUsMUs1,09,501,09,50
552,18,842,18,84
0099.8499.84
TABLE SHOWS THAT WHILE THE INSTALLED CAPACITY HAS INCREASED BY 62.15% IN THE LAST
TWELVE YEARS THE GENERATION HAS INCREASED BY 99.84% .
77
World top ten power company,*Main focus on sustainable developement*Golden Peacock Awards for Excellence in Corporate Governance in2003*Installed capacityof 28,644 MW through 31 power station*Operates 18 coal based, 8 gas based and 5 joint venture power station *17000MW under construction on at 17 location
FEATURES :
88
NTPC DADRI
It is country’s only 3-in-1 project-coal based, gas based and converter based
A new stage i.e; STAGE-II is now in running position with a capacity of 980MW (2*490)
To lighten up the CWG-2010 and for benefit of Delhi and UP
It generates 840 MW power from coal based station and 817 MW power from gas based station
99
PLANT’S WORKING
1010
COAL TOCOAL TO ELECTRICITYELECTRICITY
COAL TAKEN.COAL TAKEN.
CRUSHED COAL TO FURNACE.
SENDING TO PRE-HEATERS & MILL.WATER PASSES TO BOILER DRUM.DRUM TO BOTTOM RING HEADER.
COAL TRANSPORTATION.
1111
WATER RISES UP TO WALL TUBES.
MIXTURE TAKEN TO THE BOILER DRUM.
STEAM SENT TO SUPER HEATERS AND GOES TO TURBINE.
ASH PARTICALS ARE EXTRACTED.
STEAM ENTERS HIGH PRESSURE CYLINDER OF TURBINES.
1212
CONTROL & INSTRUMENTATION………
“BRAIN OF THE PLANT”….
1313
This division calibrates various instruments and take care of any
faults occur in the auxiliaries in the
plant.
1414
1515
MANOMETRY LAB
PROTECTION & INTERLOCK LAB
AUTOMATION LAB
PYROMETRY LAB
FSSS LAB.
ELECTRONICS TEST LAB
1616
MANOMETRY LABMANOMETRY LAB
It is basically used for the measurement of the gases and liquids..with the help of following equipments:-1.TRANSMITTERS.2.MANOMETER.3.BOURDEN PRESSURE GAUGE.
1717
PROTECTION AND INTERLOCK LAB
It is basically interconnecting two or more equipments so that if one equipment fails other one can perform the tasks with the help of following etc..
1.RELAY.2.FUSES.3.MINIATURE CIRCUIT BREAKER.
1818
AUTOMATION LAB.AUTOMATION LAB.
This lab deals in automating the existing This lab deals in automating the existing equipments and feeding routes.equipments and feeding routes.
1.Liquid in glass thermometre.1.Liquid in glass thermometre. 2.Ultra violet sensors.2.Ultra violet sensors. 3.Thermocouples.3.Thermocouples. 4.RTD’s4.RTD’s
1919
Furnance Safety and Supervisory Furnance Safety and Supervisory System Lab.System Lab.(FSSS)(FSSS)
This lab has the responsibility of This lab has the responsibility of starting fire in the furnance to starting fire in the furnance to enable the burning of coal.enable the burning of coal.
For firing the furnance a 10KV For firing the furnance a 10KV spark plugis operated for ten spark plugis operated for ten seconds. seconds.
2020
ELECTRONICS LAB.ELECTRONICS LAB.
THIS LAB UNDERTAKES THE THIS LAB UNDERTAKES THE CALIBERATIONS AND TESTING OF CALIBERATIONS AND TESTING OF
VARIOUS CARDSVARIOUS CARDS..
2121
“THERMAL PLANT”
2222
A THERMAL POWER STATION COMPRISES OF ALL THE EQUIPMENT AND A SUBSYSTEM REQUIRED TO PRODUCE ELECTRICITY BY USING A STEAM GENERATING BOILER.
SUCH POWER STATIONS ARE MOST USUALLY CONSTRUCTED ON A VERY LARGE SCALE AND DESIGNED FOR CONTINUOUS OPERATION.
2323
SOME OF THE MAIN COMPONENTS OF THE PLANT
ARE :-
COOLING TOWERS.
THREE PHASE TRANSMISSION LINE.
2424
ELECTRICAL GENERATOR.
BOILER FEED WATER PUMP.
STEAM POWERED PUMPS.
CONTRL VALVES.
DEAERATOR.
2525
FEED WATER HEATER.
PULVERIZER.
BOILER STEAM DRUM.
SUPER HEATER.
ECONOMIZERS.
2626
AIR PREHEATER.
PRECIPITATOR.
FUEL GAS STACK.
2727
2828
2929