EDGINSWELLLANE
A3022RIVIERAWAY
A380
HAMELINWAY
EDGINSWELL PARK
EDGINSWELL
JUNCTION
KERSWELL
GARDENS
A380TORQUAYROAD
WORKS TO BE BUILT AT A LATER DATE
LondontoPenzance
RailwayLine
GOURDERSLANE
Replacement for Elmcroft as
part of other works by DCC
Exeter to T
orquay Rai
lwayBranc
h Line
Exeter to
TorquayRailwayBranch Line
A382TORQUAYROAD
SHALDONROAD
C91STMARYCHURCHROAD
ASHWAY
RIDGEWAYROAD
ALLERBRAKE
ROAD
OAKTREEDRIVE
STLUK
ESROA
D
PARK
ROAD
ALLER
New Bus
Layby
PENN INN
FLYOVER
BUCKLAND
OAKLANDROAD
BRAKE
QUEENSWAY
BUCKLAN
D
ROAD
PINEROADWOOD
ROAD
ADDISON
WALK
LIME TREE
AVENUE
SILVERWOOD
ALLER
JUNCTION
RAILWAY
BRIDGE
BOUNDARY CLOSE
COLE'S LANE
CARSWELLS
SCHOOL
ROAD
BROOK
ORCHAR
D
CHURCH
END R
OADExeter to Torquay Railway Branch Line
OLD NEWTO
N ROAD
FOREDOWN LANE
ExetertoTorquayRailwayBranchLine
MEADOW
CLOSE
PRIMROSEWAY
YANNONLANE
MADDACOMBE
ROAD
OVERBRIDGE
C161MADDOCOMBELANE
CHURCHWAY LANE
GREENHILLROAD
YON STREET
C340 HUXNOR ROAD
EDGIN
SWELL LANE
YON STREET
OVERBRIDGE
EDGINSWELLLANE
EDGINSWELLLANE
A3022RIVIERAWAY
A380
HAMELINWAY
DACCABRIDGEROAD
A380NEWT
ON ROAD
A380TORQUAYROAD
A380 TO
RQUAY R
OAD
EDGINSWELL PARK
EDGINSWELL
JUNCTION
KERSWELL
GARDENS
New play park
A380TORQUAYROAD
MANOR D
RIVE
Existing
Bus Layby
Replacement
play equipment
4.5m wide
carriageway
BOUNDARY CLOSE
COLE'S LANE
CARSWELLS
Exeter to Torquay Railway Branch Line
OLD NEWTO
N ROAD
MEADOW
CLOSE
PRIMROSE WAY
A380TORQUA
WORKS TO BE BUILT AT A LATER DATE
CARRIAGEWAY
3700
CARRIAGEWAY
3700
CENTRAL
RESERVE
2400min
HARD
SHOULDER
2300
HARD
SHOULDER
2300
VERGE
1500min
VERGE
1500min
CARRIAGEWAY
3700
CARRIAGEWAY
3700
CENTRAL
RESERVE
2400min
VERGE
1500min
VERGE
1500min
PREVIOUS CROSS SECTION
AT PENN INN FLYOVER
LINEAR DRAINAGE
SYSTEM
CONCRETE
BARRIER
CURRENT SCHEME
INCLUDES NARROWER
CROSS SECTION AT PENN INN FLYOVER
LINEAR DRAINAGE
SYSTEM
NOT TO SCALE
CONCRETE
BARRIER
CARRIAGEWAY 7300 CARRIAGEWAY 7300
CENTRAL
RESERVE
2500min
VERGE
2500min
HARD
STRIP
1000
VERGE
2500min
HARD
STRIP
1000
HARD
STRIP
1000
HARD
STRIP
1000
CARRIAGEWAY 7300 CARRIAGEWAY 7300
CENTRAL
RESERVE
4500min
VERGE
3500min
VERGE
3500min
CUTTING
SLOPE
TOPSOIL
DRAINDRAINDRAIN
EMBANKMENT
SLOPE
TOPSOIL2.5% 2.5%
CARRIAGEWAY CONSTRUCTION
PREVIOUS CARRIAGEWAY
CROSS SECTION
ALLER - EDGINSWELL
CUTTING
SLOPE
TOPSOIL
DRAINDRAINDRAIN
EMBANKMENT
SLOPE
TOPSOIL2.5% 2.5%
CARRIAGEWAY CONSTRUCTION
CURRENT SCHEME
OMITS HARD STRIPS
ALLER - EDGINSWELL
NOT TO SCALE
Carriageway/
Cutting
Embankment
Footway
SCALE - 1:3750
KEY:-
Badger fencing (E3.1/3.2)
Otter fencing (E3.1/3.2)
Otter tunnel (E3.1/3.2)
Badger tunnel (E3.1/3.2)
Fishway - Pool and traverse
within twin box culverts (E3.1/3.2)
Extent of proposed wetlands habitat
(retained as grazed pasture) (E3.1/3.2)
Existing trees and hedgerowsNew tree and shrub planting
on highway land (as coded)
Seeded areas within highway
boundary (as coded)
Rock cutting (LE1.4)
New hedgerow (LE4.4)
Tree preservation orders
Exchange common land
Listed Building (P3.1)Permissive path / Diverted footpath /
Public right of way (P4.4)
Off site planting
Cycleway
ALLER JUNCTION
EDGINSWELL AND KERSWELL GARDENS
Hedge Translocation
receptor site
The Forum, Barnfield Road, Exeter, Devon, EX1 1QR
Tel: 44-(01392) 229700 Fax: 44-(01392) 229701
0 100 200 300 400 500m