Upload
ibm-danmark
View
796
Download
1
Tags:
Embed Size (px)
DESCRIPTION
Outsourcing skal skabe gode forretningsresultater og ikke blot være en kontraktuel øvelse. Derfor er det vigtigt at tænke test med i processen, således at man kan skabe løsninger af høj kvalitet. Lær mere om, hvordan du bedst muligt kan stimulere infrastrukturen ved outsourcet softwareudvikling og service gennem cloud computing og SaaS. Læs mere her: bit.ly/softwaredagrational3
Citation preview
Skibsmotorer reducerer brændselsforbrugetCarsten B. Poulsen
MAN Diesel & Turbo� „Engineering the Future – since 1758.“
Carsten B. Poulsen
Methodology Research Engineer
Marine Low Speed, Research & Development
Engines & Marine Systems
Turbomachinery Power Plants After Sales
Product Range by Strategic Business Unit
50% is powered by MAN Diesel & Turbo Engines!
Areas of ActivityMAN Diesel & Turbo in World Trade
<
World Trade fleet is 53.000 vessels
•Better fuel economy•Reduced maintenance•Remote management•Reduced crew•Improved reliability•Environment compliance
Challenge:
<
Areas of activityDiesel Engine range from 450 kW to 87,000 kW
Fuel EconomyWhat is 170g/kWh?
15km/l → 20km/l extra-urban
Marine engine efficiency is HIGH!
1g/kWh ~ DKK3000/24hrs
17km/l → 17.1km/l
Mercedes CDIMAN B&W K98
50km/l extra-urbanSpecific Fuel Consumption (SFC): 170g/kWh
Control objects:
•Charge Pressure/Air Density
•Fuel Injection Profile
•Exhaust Gas Recirculation
•Hydraulic Pressure
•Environmental Legislation
•Engine Balance
•etc.
Add Electronics and Software
The Change ProcessThe process vs. workflow?
EventEvent
The Change Workflow(s)The process vs. workflow?
The Change Process tool support
Rational Change (Change Request)
Rational Change (Work Package)
Rational DOORS (Specfications)
Rational Synergy(Artefacts)
Achievements
•Single Change Req. repository•Better collaboration•Improved perspective•Continuous development•SFC still to be determined
Gained ExperiencesProcesses?
Distinguish between
Processes and Workflows
There is no workflow related
distinction between enhancements
and defects
Even important
activities may be
formal or informal
The Process
determines important
activities
All events are
managed equally by
the process
Verification phaseResolution phase
Assignment phase
Analysis phaseInitial phase
1. Document the change
proposal or defect in a CR
2. Analyse the impact of
implementing the CR
3. Accept or reject the CR
4. Schedule selected CRs for
a defined release
5. Review the selection of
scheduled CRs with relevant
stakeholders
6. Verify the implementation
of the CRs
7. Close the CRs
Implement the selection of
CRs as scheduled
Architectural design
Implementation design
Implementation
Integration
Testing
Releasing
Requirements specification
Functional design
Investigation
Feasibility
Development process
Synergy Task concept rules
Keep workflows as simple as
possible
?Questions?