Upload
gn022010sem1
View
4.455
Download
9
Tags:
Embed Size (px)
Citation preview
Chan Shu Wen Kimberly, Chua Hui Xuan Michelle, Chua Hui Xin Amanda, Ng Jing Xiu, Tan Zhi Qian Nathalie, Tan Yi Zhen
Marina Barrage
1
2
Presentation Outline
1) Introduction2) Layout and Planning of the Development3) Site Context4) Interior Layout5) Architectural Detailing6) Learning Points7) Conclusion
Introduction
3
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Background of the Development “In 20 years, it is possible that there could be breakthroughs in
technology, both antipollution and filtration. Then we can dam up, or put a barrage at the mouth of the Marina, the neck that joins the sea. And we will have a huge fresh water lake.“
- Minister Mentor Lee Kuan Yew
4
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Background of the Development• Dam built across the Marina Channel between Marina East and
Marina South
• Officially opened on 1st
November 2008
• Singapore’s 15th reservoir
• 1st reservoir in the city
• Architect: Architects Team 3
• Constructed by Koh Brothers
Building Civil Engineering
Contractor Pte. Ltd.
• Project cost: S$226 million 5
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Background of the Development
• Part of Singapore’s National Climate Change Strategy– Global temperatures projected to rise by
1.1°C to 6.4°C
– Global mean sea levels projected to rise
by 18 cm to 59 cm over 1990 levels by
around 2100
– Temperature extremes, heat waves and
heavy rainfall events projected to
become more frequent
– Annual rainfall in Southeast Asia projected to
increase by about 7% 6
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Background of the Development
• Singapore’s vulnerability to climate change– Relatively low-lying, densely populated island in the tropics– Potential impacts of climate change on Singapore include:
1) Increased flooding2) Coastal land loss3) Water resource scarcity4) Public health impact from resurgence of diseases5) Heat stress6) Increased energy demand7) Impacts on biodiversity
• Marina Barrage one of the existing measures to help address potential climate change impacts
8
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
8
Design Intention• Water supply• Flood Control• Lifestyle Attraction
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Design Intention1) Water Supply
• Increase local water supply source, which is one of the Four National Taps
• Local water catchment area increased to two-thirds by 2011 when Marina, Punggol and Serangoon Reservoirs are completed
9
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Design Intention1) Water Supply
• 9 crest gates built across 350m wide Marina Channel to keep out seawater
• Marina Basin will turn into a body of freshwater through natural flushing in 1 to 2 years– Similar to Kranji and Lower Seletar Reservoir schemes
• Freshwater treated using advanced membrane technology
10
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Design Intention2) Flood Control• Part of a comprehensive
flood control scheme• Alleviate flooding in low-lying areas in the city• Separates seawater from freshwater and acts as tidal barrier to keep out high tides 11
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Design Intention
3) Lifestyle attraction
• Water in the Marina Basin will
be unaffected by the tides
- Water level will be constant
all year round
• Ideal venue for various recreational
land and water activities
• Venue for many international and
local sporting events and activities12
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Architectural Concept
• Designed on green principles• Number ‘9’ shape• Resembles a seashell and sails of a ship 9
13
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Architectural Concept
• Designed to be attractive and able to blend into the prime location
14
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Layout and Planning of the Development
15
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Structural System
Crest Gates
• Barrage consists of 9 crest gates
• Each gate 30m tall, 5m high, weighs 70 tonnes
16
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Structural System
17
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
• Barrage structure supported by approximately 850 bored piles
• Each between 1 and 1.5m in diameter and up to 74m deep
Structural System
18
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Roof Canopy
• Structure covers an area of 383sqm• Consists of 2 curve arches of different radii• Supported via 3 inclined steel columns and 2 supported end frames
•
Structural System
19
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Construction System
20
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
• Completion at end of 2008
• 2 phases
• Construct 2 temporary cofferdams to facilitate construction of barrage in the dry
• Engage independent professional engineer to counter-check design
Construction System
21
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
• 9 crest gates for blocking out tides- Lifted from a barge and lowered onto the concrete
bedding with nine pivots
• Precision engineering -Tolerance for mistakes was 2 millimetres for centerline of the nine pivot pins of each crest gate
Construction System
22
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
•Floating cranes that are used to install the 70-tonne gates, nine pivot pins were then used to lock the gate in place.
Construction System
23
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Building Services
• Reservoir, provide water supply
• Flood control for low-lying areas
• Lifestyle attraction for Singaporeans
24
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
• Home to Singapore’s largest solar park covering 1,200 square metres
• Sustainable Singapore Gallery educates the public on important environmental and water issues through interactive multi media displays, exhibits and games
Building Services
25
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Air Conditioning• Energy efficient air-conditioning system used for its
function rooms
26
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Air conditioning
• Green roof (650 sq m)• Double-glazed glass panels • Insulation to reduce heat penetration and
minimize energy consumption of the air-conditioning
27
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
• Automatic sprinkler at green roof - Prevents grasses from catching fire due to the blazing sun• Automatic fire alarm system around Marina Barrage and gallery• Engineered smoke control system
Fire-Protection System
28
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Site Context
29
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Environmental Impact of the Green Environment Development
30
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
• The Marina Barrage was officially opened, together with the launch of the annual Clean and Green Singapore
“In 10 years, Singapore will have many waterways and park connectors, creating more recreational
areas and an aesthetic environment. Future generations must keep this city beautiful, distinctive.”
- Minister Mentor
31
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Green features at Marina Barrage:
1. Energy Efficient
The Green Roof• An eco-friendly feature; grass-
carpeted roof• Acts as natural heat insulation• Double-glazed glass panels to
reduce heat penetration• 100% recycled plastics and eco-
friendly drainage cells
* energy savings of 1102 MWh per year! *
32
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Drainage pumps• Job: to drain out excess water during
flooding• Leverage on the siphon effect that occurs
shortly after the pumps’ activation, so less energy is used
*energy savings of 105 MWh per year!*
33
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Close-up of solar panels
Solar Park• 405 solar
panels• Generates
about 50% of the daytime electricity
34
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Green features at Marina Barrage:2. Water Efficient
• A rainwater collection system• The automated irrigation sprinkler system on the rooftop
is linked to rain sensors• Water-efficient fixtures such as waterless urinals and
water-efficient taps35
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
• Green Mark Platinum Infrastructure Awardthe top award at the annual BCA Awards organised by the Building and Construction Authority (BCA)
36
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Building form
37
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Pump house
Contains 7 massive water pumps →
38
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
• Curvilinear curtain wall suspend above the ground like a cliff face
• Hovers protectively over ground storey; serving as a shade for ground storey in hot sunny days
39
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
• Made up mainly of perforated aluminum cladding (good reflector of heat)
• Combination of grilles and louvers, designed to facilitate air movement
• Sun shading are heavily used
40
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
• Main discharge channel in courtyard is turned into a water feature
41
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Fountain
- Water signifies health and wealth
- Water shoots up and flows back into the fountain
- Signifies bringing health and wealth into the building
42
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Exploration of Building's Material and Aesthetic considerations
43
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
• Roof garden with view of the Singapore Flyer
44
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
• Influence of Modern Movement - concrete and steel construction method
• Usage of water
45
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
• Rocks and stones collected on site during construction were re-used as building materials
• 100% recycled plastics and eco-friendly drainage cells are used on the Green Roof
46
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Interior Layout
47
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Interior Layout
• ConcreteFloor & Ceiling– Advantages:
• Versatile: Poles & columns have intricate line designs
• Durable & Low maintenance• Fire resistant• Environmentally sustainable• Energy efficiency• Cost less in the long run
48
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Interior Design: Materials• 2 Materials• 3 Textures: lines, rocks, stones• Distinctive texture & beauty• Wall is patterned: tiles of different sizes
49
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Interior Layout: Ceiling
• CeilingCreases & folds– Increase surface area to lose
heat in the day– Expansion and contraction
• Reduce formation of cracks• Structural stability
50
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Interior layout – Double glazed glass
In the DAY, building can be lit up by natural sunlight At NIGHT, light penetrates
from the inside, minimizing need for street lamps
51
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Interior Layout: Glass • Incorporate passive-energy-conserving
strategies responsive to local climate• Transparent:
– sense of generous space– vantage view of internal facilities
• Double glazed glass panels with vacuum in between– Reduce heat penetration– Minimizing energy consumption– Futuristic and elegant look
• Reflective– Minimize mid-day sun
• Heavily tinted– Reduce the amount of heat entering
• Natural light Save energy and cost Sustainable Building
52
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
• Use of design-screened glass dividers
•Resulting in opacity and a sense of privacy
53
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Interior Design• Advanced green building
technologies• Integrated façade devices to
shade the building from solar gains and glare
• Open space– Natural lighting– Natural Ventilation: Healthy,
comfortable and productive– Optimize use & flexibility of spaces
54
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Interior Design
• WaterFountain• Reconnect with environment• Emotional and therapeutic
benefits that nature provides– Sounds of water– Children’s laughter
55
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Interior Layout
• Internal structures create an Earth-look-alike picture
• Interior layout– Ecologically & socially
responsive– Raise awareness of
environmental issues– Energy-conservation– Sustainability practices 56
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Sustainable Singapore Exhibition Gallery
57
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Sustainable Singapore Exhibition Gallery• 5 dimensional: Light, sound, 3D visual
– Use of water sounds, natural sound in the gallery and lighting
– Emphasize on the LED Lighting used to give a futuristic, vibrant feeling, wide selection of colour
– High ceiling: Less enclosed
58
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Sustainable Singapore Gallery (SSG)
• Purpose: Environmental sustainability
• Sustainable: – Clean air– Affordable water– Quality living environment
• Spectacular sensory experience• Timeline gallery
– Singapore’s efforts towards environmental sustainability 59
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Sustainable Singapore Exhibition Gallery 1
• Current environmental challenges• “Organic Tree”• Colour switches from:
– blue to red to green• Uncertain state of environmentSelection of colors:
– colors can transmit messages• Feature wall: NEWater bottles
– NEWater: treated wastewater• Sustainable water supply
• 3-Dimensional: Visual and Texture60
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Sustainable Singapore Exhibition Gallery 2
• Story of the Singapore River:– polluted to a clean water
way• Environmental story of
Singapore• Use of reflective
materials: Mirrors– Modernized and futuristic
61
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Sustainable Singapore Exhibition Gallery 3
• Active, Beautiful, Clean waters programme
• Aim:– Raise awareness of
water-conservation– Public responsibility
62
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Sustainable Singapore Exhibition Gallery 4
• Innovative barrage model demostration– Details the intricate
construction & operations of the dam
• Deeper understanding of underlying mechanisms
• Educational tool– Man-environment interactions
63
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Sustainable Singapore Exhibition Gallery 5
• Jewel box• Sustainability from different
angles:– Industrialization– Waste management– Housing– Commerce– Nature
• Careful planning and management– Limited land– Maximize potential 64
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Sustainable Singapore Exhibition Gallery 5
• Blue LED lighting– Symbolizes water
• 71% earth surface
– Create transformational experience
– Calm and soothing color– Creates a conducive
environment• Environmentally sustainable
practices • Intervene and resolve 65
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Sustainable Singapore Exhibition Gallery 6
• Steadfast commitment in caring for the environment:
– 3P• Interactive walkway to engage
people• Futuristic feel
– “journey to the future”• Memorable experience
66
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Architectural Detailing
67
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Special green architectural features• Solar Park• Double-glazed glass panels
Green Roof
• Rainwater Collection System• Automated Irrigation• Water-efficient flushing systems
Water Sustainability
• Garden City• Waterscape designs
Ecological Landscape
68
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
1. Iconic Green RoofGreen Roof•Natural heat insulation•Reduces indoor temperature by approximately 3°C
Double-glazed Glass Panels•Reduces heat penetration•Minimizes energy consumption of air-con system
Solar Park •Green renewable energy•Reduces daytime electricity demands by 50%•Powers some of the barrage’s public spaces
69
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
2. Water Sustainability DesignRainwater Collection System•Harnesses rainwater to meet the irrigation requirements•Supports water independence
Automated Irrigation Sprinkler System•Linked to rain sensors that will be deactivate the system when it rains
Water-saving Flushing systems•Waterless urinals•Water-efficient taps
70
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
3. Ecological Landscape
Singapore’s Garden City Reputation• Connects a tropical botanical park to the city, extending
from downtown and along the reservoir
PUB: “Active, Beautiful, Clean Waters”• Transform infrastructural waterways Central Courtyard
and Community Play areas• Learn water conservation methods through play
interaction
71
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Learning Points
72
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Family Outings- Lifestyle attraction right at the heart of the city
Educational Field Trips- Community education on important environmental & water issues
Photography excursions- Aesthetic Features
Site Observation
73
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Similar Architectural Features - ADM
• Helical Grass Roof• 2 interlocking spirals• Extensive use of glass panels
• Fountain in courtyard
• Curvilinear shape• Illusion of a bigger area
Marina Barrage ADM
74
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Conclusion
75
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Prizes won
• Green Platinum Award in new Green Mark category introduced at the annual Building and Construction Authority (BCA) Awards• ASEAN Outstanding Engineering Achievement
Award
76
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Prizes won• Superior Achievement Award at the American Academy of
Environmental Engineers (AAEE)’s Excellence in Environmental Engineering competition
• Grand Conceptor Award at the American Council of Engineering Companies of Massachusetts' 2009 Engineering Excellence Awards
77
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Conclusion
• New scenic icon that graces Singapore’s city skyline with numerous benefits – Educational, practical benefits and lifestyle hot spot
• Important milestone in efforts to maximise Singapore’s rainwater harvesting capacity and to create a sustainable water supply
78
Introduction Layout/Planning Site Context Interior Layout Architectural
Detailing Learning Points Conclusion
Conclusion
The End Thank You! (:
79