Solar and The Power GridSolar and The Power Grid
Chairman Jon Chairman Jon WellinghoffWellinghoff
Federal Energy Regulatory Federal Energy Regulatory CommissionCommission
April 24, 2009April 24, 2009Jack Morton Auditorium Jack Morton Auditorium
Washington, D.C.Washington, D.C.
22
U.S Google Energy Plan / U.S Google Energy Plan / 20302030
33
U.S. Renewable Energy U.S. Renewable Energy ResourcesResources
Geothermal
Biomass
Wind
Solar CSP
Solar PV
Source: National Renewable Energy Laboratory
44
Concentrating Solar PowerConcentrating Solar Power
55
Nellis ProjectNellis ProjectNellis Air force Base 14 MW Solar Power SystemNellis Air force Base 14 MW Solar Power System
66
Solar PV on a HomeSolar PV on a Home
77
Existing High Voltage Existing High Voltage TransmissionTransmission
88
““While at the Commission, I While at the Commission, I intend to concentrate on three intend to concentrate on three issue areas that I believe will issue areas that I believe will bolster our commitment to bolster our commitment to ensuring that consumers ensuring that consumers receive reliable power at just receive reliable power at just and reasonable rates. These and reasonable rates. These areas [include] … opening areas [include] … opening wholesale markets to wholesale markets to renewable and distributed renewable and distributed resources.”resources.”
FERC Commissioner Jon WellinghoffFERC Commissioner Jon WellinghoffSeptember 21, 2006September 21, 2006
FERC Action on Renewable FERC Action on Renewable EnergyEnergy
99
Order No. 890 (February 2007)Order No. 890 (February 2007) Conditional Firm ServiceConditional Firm Service Energy Imbalance and Generator Imbalance ExemptionsEnergy Imbalance and Generator Imbalance Exemptions Transmission PlanningTransmission Planning
CAISO Location-Constrained Resources Proposal CAISO Location-Constrained Resources Proposal (April 2007)(April 2007)Interconnection Queue Processing (March 2008)Interconnection Queue Processing (March 2008)
Merchant Transmission Financing Flexibility Merchant Transmission Financing Flexibility (February 2009)(February 2009)
Smart Grid Proposed Policy Statement (March 2009)Smart Grid Proposed Policy Statement (March 2009) Transmission Investment Rate IncentivesTransmission Investment Rate Incentives
FERC Action on Renewable FERC Action on Renewable EnergyEnergy
1010
Transmission PlanningTransmission Planning Transmission planning increasingly must look Transmission planning increasingly must look
beyond the needs of a single utility or even a beyond the needs of a single utility or even a single state to examine requirements of an single state to examine requirements of an entire region.entire region.
Order No. 890 Order No. 890 Requires transmission planning on regional, open, Requires transmission planning on regional, open,
transparent, coordinated basistransparent, coordinated basisApplies to all jurisdictional transmission providersApplies to all jurisdictional transmission providersNon-public utility transmission providers also Non-public utility transmission providers also
expected to participate in regional planning expected to participate in regional planning processesprocesses
1111
Transmission PlanningTransmission Planning FERC examining adequacy of transmission FERC examining adequacy of transmission
planning processes:planning processes:
March 2009 technical conference begins series on March 2009 technical conference begins series on challenges/solutions to integrating renewable challenges/solutions to integrating renewable energy.energy.
FERC Staff to hold regional technical conferences FERC Staff to hold regional technical conferences later this year to evaluate Order No. 890 later this year to evaluate Order No. 890 transmission planning and areas that need transmission planning and areas that need improvement. improvement.
Focus of Senate, House legislation.Focus of Senate, House legislation.
1212
Transmission ReliabilityTransmission ReliabilityFederal Power Act Section 215 (EPAct Federal Power Act Section 215 (EPAct
2005)2005)Bulk Power SystemBulk Power SystemMandatory, Enforceable RulesMandatory, Enforceable RulesERO (NERC), Regional EntitiesERO (NERC), Regional Entities
1313
Necessary Factors for Solar Necessary Factors for Solar DevelopmentDevelopment
Transmission Transmission PlanningPlanningSitingSitingCost AllocationCost Allocation
DR For IntegrationDR For Integration
1414
Thank Thank YouYou