14
Solar and The Power Grid Solar and The Power Grid Chairman Jon Chairman Jon Wellinghoff Wellinghoff Federal Energy Regulatory Federal Energy Regulatory Commission Commission April 24, 2009 April 24, 2009 Jack Morton Auditorium Jack Morton Auditorium Washington, D.C.

Jon Wellinghoff | Solar and the Power Grid

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: Jon Wellinghoff | Solar and the Power Grid

Solar and The Power GridSolar and The Power Grid

Chairman Jon Chairman Jon WellinghoffWellinghoff

Federal Energy Regulatory Federal Energy Regulatory CommissionCommission

April 24, 2009April 24, 2009Jack Morton Auditorium Jack Morton Auditorium

Washington, D.C.Washington, D.C.

Page 2: Jon Wellinghoff | Solar and the Power Grid

22

U.S Google Energy Plan / U.S Google Energy Plan / 20302030

Page 3: Jon Wellinghoff | Solar and the Power Grid

33

U.S. Renewable Energy U.S. Renewable Energy ResourcesResources

Geothermal

Biomass

Wind

Solar CSP

Solar PV

Source: National Renewable Energy Laboratory

Page 4: Jon Wellinghoff | Solar and the Power Grid

44

Concentrating Solar PowerConcentrating Solar Power

Page 5: Jon Wellinghoff | Solar and the Power Grid

55

Nellis ProjectNellis ProjectNellis Air force Base 14 MW Solar Power SystemNellis Air force Base 14 MW Solar Power System

Page 6: Jon Wellinghoff | Solar and the Power Grid

66

Solar PV on a HomeSolar PV on a Home

Page 7: Jon Wellinghoff | Solar and the Power Grid

77

Existing High Voltage Existing High Voltage TransmissionTransmission

Page 8: Jon Wellinghoff | Solar and the Power Grid

88

““While at the Commission, I While at the Commission, I intend to concentrate on three intend to concentrate on three issue areas that I believe will issue areas that I believe will bolster our commitment to bolster our commitment to ensuring that consumers ensuring that consumers receive reliable power at just receive reliable power at just and reasonable rates. These and reasonable rates. These areas [include] … opening areas [include] … opening wholesale markets to wholesale markets to renewable and distributed renewable and distributed resources.”resources.”

FERC Commissioner Jon WellinghoffFERC Commissioner Jon WellinghoffSeptember 21, 2006September 21, 2006

FERC Action on Renewable FERC Action on Renewable EnergyEnergy

Page 9: Jon Wellinghoff | Solar and the Power Grid

99

Order No. 890 (February 2007)Order No. 890 (February 2007) Conditional Firm ServiceConditional Firm Service Energy Imbalance and Generator Imbalance ExemptionsEnergy Imbalance and Generator Imbalance Exemptions Transmission PlanningTransmission Planning

CAISO Location-Constrained Resources Proposal CAISO Location-Constrained Resources Proposal (April 2007)(April 2007)Interconnection Queue Processing (March 2008)Interconnection Queue Processing (March 2008)

Merchant Transmission Financing Flexibility Merchant Transmission Financing Flexibility (February 2009)(February 2009)

Smart Grid Proposed Policy Statement (March 2009)Smart Grid Proposed Policy Statement (March 2009) Transmission Investment Rate IncentivesTransmission Investment Rate Incentives

FERC Action on Renewable FERC Action on Renewable EnergyEnergy

Page 10: Jon Wellinghoff | Solar and the Power Grid

1010

Transmission PlanningTransmission Planning Transmission planning increasingly must look Transmission planning increasingly must look

beyond the needs of a single utility or even a beyond the needs of a single utility or even a single state to examine requirements of an single state to examine requirements of an entire region.entire region.

Order No. 890 Order No. 890 Requires transmission planning on regional, open, Requires transmission planning on regional, open,

transparent, coordinated basistransparent, coordinated basisApplies to all jurisdictional transmission providersApplies to all jurisdictional transmission providersNon-public utility transmission providers also Non-public utility transmission providers also

expected to participate in regional planning expected to participate in regional planning processesprocesses

Page 11: Jon Wellinghoff | Solar and the Power Grid

1111

Transmission PlanningTransmission Planning FERC examining adequacy of transmission FERC examining adequacy of transmission

planning processes:planning processes:

March 2009 technical conference begins series on March 2009 technical conference begins series on challenges/solutions to integrating renewable challenges/solutions to integrating renewable energy.energy.

FERC Staff to hold regional technical conferences FERC Staff to hold regional technical conferences later this year to evaluate Order No. 890 later this year to evaluate Order No. 890 transmission planning and areas that need transmission planning and areas that need improvement. improvement.

Focus of Senate, House legislation.Focus of Senate, House legislation.

Page 12: Jon Wellinghoff | Solar and the Power Grid

1212

Transmission ReliabilityTransmission ReliabilityFederal Power Act Section 215 (EPAct Federal Power Act Section 215 (EPAct

2005)2005)Bulk Power SystemBulk Power SystemMandatory, Enforceable RulesMandatory, Enforceable RulesERO (NERC), Regional EntitiesERO (NERC), Regional Entities

Page 13: Jon Wellinghoff | Solar and the Power Grid

1313

Necessary Factors for Solar Necessary Factors for Solar DevelopmentDevelopment

Transmission Transmission PlanningPlanningSitingSitingCost AllocationCost Allocation

DR For IntegrationDR For Integration

Page 14: Jon Wellinghoff | Solar and the Power Grid

1414

Thank Thank YouYou