View
881
Download
0
Embed Size (px)
DESCRIPTION
Presentation by Tara Thue, Governor's Office of Economic Development (GOED), and Bert Granberg, Utah Automated Geographic Reference Center (AGRC) at the Utah Broadband Provider Roundtable on 10/4/2010.
Citation preview
Inaugural Utah Broadband Provider Roundtable
What is the Utah Broadband Project
A joint effort between – the Utah Public Service Commission (PSC) [the official
grant designee], – the Governor’s Office of Economic Development (GOED),
[responsible for coordination and planning], and – the Utah Automated Geographic Reference Center (AGRC)
[responsible for mapping/technical services]– Provider Engagement Contractor: International Research
Center (IRC)
Funding
Mapping: $1.5 Million Planning: $500,000 • The total grant award just over $2 million• In-kind match for approximately $500,000• Total project estimate=$2,555,553
New Award• A supplemental award of $3.1 million was announced by the
NTIA last week.• What for?
– Prolong the “life” of the project from two to five years; – Support a research survey on broadband demand and Internet usage; – Provide for local outreach related to increasing broadband adoption; – Establish one additional staff member to support the existing project
staff; – Identify and implement best practices related to data collection,
integration, and validation; and – Leverage state-to-county relationships and Utah’s 911 Committee to
develop a statewide address file.
Other Broadband Efforts in Utah
• BTOP Recipients• Utah Education Network ($13 million)• Ute Tribe ($1.4 million)• Utopia ($16 million)
• BIP Recipients• South Central Communications ($9.2 million)
State Legislative Efforts
Rural Broadband Service Fund Act Utah Code Ann. § 63M-1-2305
• The fund was limited to $1,000,000 in post performance cash grants with a 50% of project cost ceiling and a sunset date of July 1, 2010.
Public Outreach Efforts• Audiences:
– Broadband Providers– Public Officials– Businesses– Consumers
• Mechanisms– Meetings– Tradeshows– Traditional Media– Social Media
• SlideShare• YouTube• Facebook (via GOED’s page)• Twitter
– NEW WEBISTE: http://BROADBAND.UTAH.GOV
@UtahBroadband
Website
• Will be released later this month• Designed by Utah Interactive
Preview…..
Questions, feedback or technical assistance requests?
Contact the Utah Broadband Project team anytime at [email protected]
Tara Thue, [email protected]
Bert Granberg, [email protected]
Utah Automated Geographic Reference Center (AGRC)
• Dept. of Technology Services (DTS)– State Geographic Information Database
• Data, Services, Infrastructure– Aerial Photography– Streets & Address Locations– Land Ownership & Parcels– Municipal and Political Boundaries– Demographic Data– Terrain Models– GPS Network– …
AGRC Broadband Mapping Role
• Technology Services Provider to the Project– Data collection, standardization, verification– NTIA submission– State Broadband Map
• Hosting and Development
Technical Assistance Available To Providers!
What is being mapped?• NTIA Broadband Definition:
– 768K down, 200K Up• Speed & Technology:
– Wireless Service Areas• Service polygons
– Wire-based Service Areas• Census Block (where blocks <= 2 sq miles)• Road Segment• Address Service Points
– Infrastructure• Middle & Last Mile Locations
– Service Overview (by county)– Community Anchor Institutions
• Schools, Emergency Response, Health, Government, Public Services
Italics = Protected Data Records
Expected Utah Participation inOctober 2010 NTIA Data Submission
• Emery• Frontier• Gunnison• Hughes• InfoWest• Integra• Leap/Cricket• Level3• Manti• Myvocom• NewEdge• Qwest
• Sprint/Nextel• SouthCentral• Spanish Fork• Strata• T-Mobile• ThreeSixty• Union• Utopia• Veracity• Verizon• Wild Blue• XOCommunications• XpressWeb
• AllWest• American Fiber• AT&T• Baja• Beehive• Bresnan• CentraCom• Comcast• Covad• Digis• DirectComm.
Significant Data Processing
Still Underway
Broadband Availability
WirelessBroadband
Broadband Availability
WirelineBroadband
(& Wireless)
Broadband Availability
Fiber Service
(& Wireline& Wireless)
Broadband Availability
10 mbps or greater(Provider-reported
Service, All technologies)
Broadband Availability
10 mbps or greater
including UEN & Community
Anchor Institutions
(All technologies)
Broadband Availability
State Broadband Map• Interactive Browser Based Map• Allow Users to Explore Non-Confidential
Broadband Data• Design, User Cases:
– Consumer– Community, Civic Leaders– Policy: Incentives, Planning, etc.
Interactive Map w/
Zoom and Pan
Controls
CONCEPT DRAFT
Find Location of
Interest
CONCEPT DRAFT
View Broadband & Demographic Data For Map
Center Location
CONCEPT DRAFT
CONCEPT DRAFT
Filter BroadbandMap Data
SelectMap
Background
CONCEPT DRAFT
Utah Broadband Mapping: The Road Ahead
• NTIA Data Submission, Wed Oct 6th [date extended by NTIA]– Provider Feedback Packets, November 2010
• New FCC National Broadband Data Model– Subsequent submissions, March/September
Our Goals:1. Browser-based submission portal, Mar 20112. State Broadband Map
– Target Release: Jan 2011• Provider preview, 1 month prior
3. Speed Test Data Available to Providers4. Statewide Address Point Map Layer, July 2012
Questions, feedback or technical assistance requests?
Contact the Utah Broadband Project team anytime at [email protected]
Tara Thue, [email protected]
Bert Granberg, [email protected]
Inaugural Utah Broadband Provider Roundtable