27

Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

Embed Size (px)

DESCRIPTION

Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow Presenter: Todd Roberts, Memorial Health System The second workshop in our series will look at a recent project at Memorial Health System (MHS) in Illinois. Todd Roberts, System Director of Operations Improvement at MHS will discuss and demonstrate the use of discrete simulation modeling to analyze floor design and throughput for a new Rapid Clinical Examination provider model for a 70,000 annual visit, Level I trauma center emergency department at a 507 bed, tertiary, urban, academic medical center and flow for all aspects of architectural design proposal for $31 million dollar operating room expansion project, including pre-op admission, transport to OR, OR time, and post-anesthesia care units (PACU) for admitted and outpatient surgery. Through the use of discrete simulation modeling, Memorial has reduced length to stay for non-admitted patients in the emergency department by 27%, reduced percentage of patients leaving by without treatment by 50%, and released admit hold time by 37% while improving patient satisfaction from the 57th to 99th percentile (Press Ganey). In addition, Memorial has used simulation to determine the appropriate facilities layout for its new OR expansion project, determining that optimizing the flow of traffic will lead to a reduction of 30 minutes per case in wasted movement and waiting.

Citation preview

Page 1: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software
Page 2: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

SIMUL8 Corporation | SIMUL8.com | [email protected]

1 800 547 6024 | +44 141 552 6888

Page 3: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

SIMUL8 Corporation | SIMUL8.com | [email protected]

1 800 547 6024 | +44 141 552 6888

Page 4: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

Memorial Health System

Discrete Event Simulation

Todd S. Roberts, MBA, CLSSMBB

System Director, Operations Improvement

Memorial Health System

May 15, 2013

Page 5: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

Systems thinking is the ability to see things as a whole (or holistically), including the many different types of relationships between the diverse elements of a complex system

Necessary component of “learning organizations”

Takes cause-and-effect thinking to a higher level and encourages the user to see not just the linear causal connections but also the web of causal interconnections that come into play in real systems

“The Fifth Discipline”

Page 6: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

“Adjusting the system or process

inputs to produce the best possible

average response with minimum

variability”

System Optimization

Page 7: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

The sensitive

dependence on initial

conditions, where a

small change at one

place can result in

large differences to a

later state.

Butterfly Effect

Page 8: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

Three types of failures in complex systems:

– Procedural

• Failure to adhere to/execute a defined process

• Single, obvious mistakes

• Special-cause variation

• Plan, Do, Check, Act or corrective action

– Engineered • People, process, materials

• Common-cause variation

• Defined processes

• Lean Six Sigma projects

– System • Complex interactions between processes and risk factors

• Difficult to understand and pinpoint cause and effect relationships

• Discrete event simulation

Failure in Complex Systems

Page 9: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

Simulated floor design and throughput for new Rapid Clinical Examination provider model for a 70,000 annual visit, Level I trauma center emergency department at a 507 bed, tertiary, urban, academic medical center

Simulation was constructed using floor layout schematic and provider resource models based upon historic hourly ED arrival (Poisson) and service distribution rates (exponential) for high, mid, and low acuity patients as well as admitted vs. discharged dispensation

ED Flow Redesign Project

Page 10: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

Goals of the simulation model were as follows:

– Determine the most efficient model for routing patients through the system (high acuity patients to main ED, low acuity patients to rapid clinical examination)

– Determine the number of provider resources necessary for staffing based upon patient distribution

– Determine primary macro factors affecting length of stay for all patients

– Identify process constraints and bottlenecks

– Identify factors contributing to increased patient wait time and patients leaving without treatment (LWOT)

ED Simulation Goals

Page 11: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

Determined the appropriate routing model for patients to the main ED and the Rapid Clinical Examination process

The provider mix was adjusted to accommodate peak volumes throughout the day in an effort to minimize wait times and LWOTS

A number of Lean Six Sigma projects were chartered based upon the findings of the Simulation model, including time from imaging complete to discharge, lab turnaround time, and CT utilization and turnaround time

Simulation Results

Page 12: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

EMERGENCY DEPARTMENT RAPID CLINICAL EXAMINATION MODEL POST-IMPROVEMENT DATA

Page 13: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

UCL

285.2

CL

208.9

LCL 132.5

104

154

204

254

304

354

404

01

/01

/20

13

02

/01

/20

13

03

/01

/20

13

04

/01

/20

13

05

/01

/20

13

06

/01

/20

13

07

/01

/20

13

08

/01

/20

13

09

/01

/20

13

10

/01

/20

13

11

/01

/20

13

12

/01

/20

13

13

/01

/20

13

14

/01

/20

13

15

/01

/20

13

16

/01

/20

13

17

/01

/20

13

18

/01

/20

13

19

/01

/20

13

20

/01

/20

13

22

/01

/20

13

23

/01

/20

13

24

/01

/20

13

25

/01

/20

13

26

/01

/20

13

27

/01

/20

13

28

/01

/20

13

29

/01

/20

13

30

/01

/20

13

31

/01

/20

13

01

/02

/20

13

02

/02

/20

13

03

/02

/20

13

04

/02

/20

13

05

/02

/20

13

06

/02

/20

13

07

/02

/20

13

08

/02

/20

13

09

/02

/20

13

10

/02

/20

13

11

/02

/20

13

12

/02

/20

13

13

/02

/20

13

14

/02

/20

13

15

/02

/20

13

16

/02

/20

13

17

/02

/20

13

Ove

rall

LOS

Date

Overall Length of Stay

16% Improvement

Page 14: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

UCL

231.8

CL

154.7

LCL 77.6

49

59

69

79

89

99

109

119

129

139

149

159

169

179

189

199

209

219

229

239

249

259

269

279

289

01

/10

/20

12

06

/10

/20

12

11

/10

/20

12

16

/10

/20

12

21

/10

/20

12

26

/10

/20

12

31

/10

/20

12

05

/11

/20

12

10

/11

/20

12

15

/11

/20

12

20

/11

/20

12

25

/11

/20

12

30

/11

/20

12

05

/12

/20

12

10

/12

/20

12

15

/12

/20

12

20

/12

/20

12

25

/12

/20

12

30

/12

/20

12

04

/01

/20

13

09

/01

/20

13

14

/01

/20

13

19

/01

/20

13

23

/01

/20

13

28

/01

/20

13

02

/02

/20

13

07

/02

/20

13

12

/02

/20

13

17

/02

/20

13

22

/02

/20

13

27

/02

/20

13

04

/03

/20

13

09

/03

/20

13

14

/03

/20

13

19

/03

/20

13

24

/03

/20

13

29

/03

/20

13

03

/04

/20

13

08

/04

/20

13

12

/04

/20

13

17

/04

/20

13

22

/04

/20

13

27

/04

/20

13

RC

E LO

S

Date

Rapid Clinical Examination Length of Stay

26% Overall Improvement

Page 15: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

UCL

356.2

CL

259.6

LCL 163.0

130

155

180

205

230

255

280

305

330

355

380

405

430

455

480

505

530

01

/01

/20

13

04

/01

/20

13

07

/01

/20

13

10

/01

/20

13

13

/01

/20

13

16

/01

/20

13

19

/01

/20

13

22

/01

/20

13

25

/01

/20

13

28

/01

/20

13

31

/01

/20

13

03

/02

/20

13

06

/02

/20

13

09

/02

/20

13

12

/02

/20

13

15

/02

/20

13

18

/02

/20

13

21

/02

/20

13

24

/02

/20

13

27

/02

/20

13

02

/03

/20

13

05

/03

/20

13

08

/03

/20

13

11

/03

/20

13

14

/03

/20

13

17

/03

/20

13

20

/03

/20

13

23

/03

/20

13

26

/03

/20

13

29

/03

/20

13

01

/04

/20

13

04

/04

/20

13

07

/04

/20

13

09

/04

/20

13

12

/04

/20

13

15

/04

/20

13

18

/04

/20

13

21

/04

/20

13

24

/04

/20

13

27

/04

/20

13

30

/04

/20

13

Mai

n E

D L

OS

Date

Main ED Length of Stay

16% Improvement

Page 16: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

UCL

4.83%

CL

1.27%

0.00%

1.00%

2.00%

3.00%

4.00%

5.00%

6.00%

7.00%

8.00%

9.00%

10.00%

01

/10

/20

12

06

/10

/20

12

11

/10

/20

12

16

/10

/20

12

21

/10

/20

12

26

/10

/20

12

31

/10

/20

12

05

/11

/20

12

10

/11

/20

12

15

/11

/20

12

20

/11

/20

12

25

/11

/20

12

30

/11

/20

12

05

/12

/20

12

10

/12

/20

12

15

/12

/20

12

20

/12

/20

12

25

/12

/20

12

30

/12

/20

12

04

/01

/20

13

09

/01

/20

13

14

/01

/20

13

19

/01

/20

13

23

/01

/20

13

28

/01

/20

13

02

/02

/20

13

07

/02

/20

13

12

/02

/20

13

17

/02

/20

13

22

/02

/20

13

27

/02

/20

13

04

/03

/20

13

09

/03

/20

13

14

/03

/20

13

19

/03

/20

13

24

/03

/20

13

29

/03

/20

13

03

/04

/20

13

08

/04

/20

13

12

/04

/20

13

17

/04

/20

13

22

/04

/20

13

27

/04

/20

13

LWO

T as

% o

f To

tal V

olu

me

Date

Left Without Treatment (LWOT) as % of Total Volume

53% Improvement

Page 17: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

ED Admitted Patient Average Length of Stay (minutes) 2nd consecutive month below 200 minutes & 1st month below 100 minutes

Page 18: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

UCL

211.908

CL

125.017

LCL 38.125

4.70

104.70

204.70

304.70

404.70

504.70

604.70

01

/01

/20

13

02

/01

/20

13

03

/01

/20

13

04

/01

/20

13

05

/01

/20

13

06

/01

/20

13

07

/01

/20

13

08

/01

/20

13

09

/01

/20

13

10

/01

/20

13

11

/01

/20

13

12

/01

/20

13

13

/01

/20

13

14

/01

/20

13

15

/01

/20

13

16

/01

/20

13

17

/01

/20

13

18

/01

/20

13

19

/01

/20

13

20

/01

/20

13

21

/01

/20

13

22

/01

/20

13

23

/01

/20

13

24

/01

/20

13

25

/01

/20

13

26

/01

/20

13

27

/01

/20

13

28

/01

/20

13

29

/01

/20

13

30

/01

/20

13

31

/01

/20

13

01

/02

/20

13

02

/02

/20

13

03

/02

/20

13

04

/02

/20

13

05

/02

/20

13

06

/02

/20

13

07

/02

/20

13

08

/02

/20

13

09

/02

/20

13

10

/02

/20

13

11

/02

/20

13

12

/02

/20

13

13

/02

/20

13

14

/02

/20

13

15

/02

/20

13

16

/02

/20

13

17

/02

/20

13

Ad

mit

Re

qu

est

to

Ch

eck

ou

t A

vera

ge

Date

ED Admit Request to Checkout Average

50% Improvement

Page 19: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

Emergency Department Patient Satisfaction over 80th%ile for 3nd consecutive month & 2nd consecutive month at 98th%ile or above . 2nd quarter FY 2013 99th%ile .

Page 20: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

– May 2012 – RCE Launch

– July 1, 2012 – RCE Fully implemented 7 days/week

– August 17, 2012 – RCE Red Flag criteria change (based on Simulation)

– January 21, 2013 – 4th lane of RCE added (Based on Simulation)

– April 9, 2013 – ED facilities remodeled to support process flow

Key Process Changes

Page 21: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

Simulate flow for all aspects of architectural design proposal for $31 million dollar operating room expansion project, including pre-op admission, transport to OR, OR time, and post-anesthesia care units (PACU) for admitted and outpatient surgery

Test assumptions for capacity based on an expansion of 5 operating rooms (and pre-op/PACU beds) and increased volumes of 15% over the next 5 years

OR Renovation Design Simulation

Page 22: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

2 Elevators

3 Elevators

Operating Room Opportunity Cost = $54/minute

Page 23: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

Identified process bottlenecks and determined that with a surge of patients transported to the OR for first and second-case starts, that two elevators from the pre-op holding area to the ORs is not adequate for flow, and will lead to staff, physician, and patient dissatisfaction while increasing overall variation by 30 minutes per case throughout the day.

Decision was made to add a third elevator to the design to satisfy flow demand

The discovery of downstream increase in variation could not have been achieved and recognized using static waiting line models.

Simulation Results

Page 24: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

Lean Six Sigma projects have been chartered to

streamline scheduling processes and OR room

turnover processes to further reduce variation

and increase capacity

Studies conducted for projected increased

volume year over year have allowed the building

of adequate facilities for the next 20 years

Next Steps

Page 25: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

Requires deep process understanding (avoid tampering)

Creates a shared visual understanding of the process for all parties

Allows for observational analysis and modification without physical intervention in a complex environment (offline trial and error)

Supports improved decision-making through management by fact

Discrete Event Simulation Benefits

Page 26: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

Contact: [email protected] (217) 757-7782

Page 27: Ensuring the feasibility of a $31 million OR expansion project: Capacity planning, system design, and patient flow with SIMUL8 simulation software

SIMUL8 Corporation | SIMUL8.com | [email protected]

1 800 547 6024 | +44 141 552 6888