We believe customers should be assisted in making informed decisions about Product

Lifecycle Management

o Learn more about us and how we can help you implement a Product Lifecycle Management (PLM) Platform tailored to support your business model and focused on your business initiatives.

At zerowait-state.com“PLM is in our DNA”

Zero Wait-State.

Page 3: Data migration 2.0

•Established in 1999

•SolidWorks Partner: EPDM

•Oracle Gold Partner: Agile PLM

•PLM Implementation, Integration and Data Migration

•Core competencies: All Agile PLM Modules

our company.

Page 4: Data migration 2.0

our customers.

Page 5: Data migration 2.0

core competencies.

Page 6: Data migration 2.0

implementation products.

Page 7: Data migration 2.0

integration products.

Page 8: Data migration 2.0

We have extensive research in PLM and data migration.– Major migrations at

John Deere, Dell, Raytheon and Maxtor

– Successful migrations from Intralink and PDMLink to Enterprise PDM

the experience.

Page 9: Data migration 2.0

Data migration is hard...very very hard.

Data condition is a variable hard to predict which must be done without disrupting current production environment

the facts.

Page 10: Data migration 2.0

• It’s a critical process.

• Product data is the lifeblood of a company

• Bad data can render a PLM or PDM system useless

the process.

Page 11: Data migration 2.0

the big bang bad idea.

• Moving it all is problematic

• Moving increments is more manageable

• Eliminates time constraints

• Reduces Risks

Page 12: Data migration 2.0

• Extracting and transferring history to a new PLM is challenging

• Most companies rarely access earlier versions of data

• Using a “latest only” dramatically reduces costs and complexity

history is best forgotten.

Page 13: Data migration 2.0

• Just because you can migrate all your data, doesn’t mean you should.

• Take a hard look at legacy data and be selective

• Do not pollute your new system with corrupt or inaccurate data

• Don’t “under provision” hardware

• Identify needs and have analysis of data cleansing solutions ready

• Clean up data as much as possible

garbage in, garbage out.

Page 14: Data migration 2.0

• Two test passes and a production pass are minimum recommendations for most migrations

• Have a specific test plan to evaluate data in the test system

• Resist the urge to truncate testing

test. validate. repeat.

Page 15: Data migration 2.0

mission accomplished.

• Moving Intralink 3.4 to enterprise PDM• Joint project with GoEngineer• Extracted meta data and binary files from

Pro/Engineer from Intralink • Used drag and drop to load the CAD files and an

import tool for GoEngineer for the meta data• Customer was successful and shut down two

servers

Page 16: Data migration 2.0

mission accomplished.

• Moving from PDMlink 9.0• Joint project with GoEngineer• Using drag and drop to load the CAD files

and sent meta data to Agile PLM• Customer successfully transitioned from

PDMLink to Agile PLM and EPDM

Page 17: Data migration 2.0

conclusion.

1. Data migration is tricky

2. Data migration is important

3. Preparation and planning can alleviate issues

4. Incremental migration without history is best

5. Beware of undermining the difficulty of migration

Page 18: Data migration 2.0

zero wait-state.

follow us!!

www.facebook.com/zerowaitstate

http://linkd.in/VqVdda twitter.com/zerowaitstate