COBOL V5 Migration Strategies17033
Jim Liebert, CompuwareInsert
Custom
Session
QR if
Desired.
34/14/2015
Wednesday
16710: COBOL V5 User Experience
Background
COBOL 5 Migration – Share Seattle 2015
44/14/2015
IBM
Tuesday
16615: How to Take Advantage of the New COBOL V5
Compiler – Migration!Overview
Friday
16710: COBOL V5 Migration Strategy
Case Study
Wednesday
16710: COBOL V5 User Experience
COBOL V5: CliffsNotes
54/14/2015
• Significant rewrite by IBM
- leverage Code Generator code used in Java and C/C++- catch up with z/OS hardware improvements- (more or less) compatible with previous COBOL compilers- (more or less) can run combined with older COBOL executables
• Performance improvements- YMMV. We see 5-7% at our customers (highs in the 9-11% range)- IBM says up to 20% in certain cases.
COBOL V5Win-Win
64/14/2015
For consumers
- possible budget savings
- software catches up to hardware
- IBM commitment
For IBM
- common code paths
- reinvigorate a significant money maker
- growth path
74/14/2015
Risk
Reward
84/14/2015
Risk
Reward
COBOL 5 Project
94/14/2015
Risk
Reward
COBOL 5 Migration
Effort
104/14/2015
Risk
Reward
COBOL 5 Migration
Effort
DevOps: How much time to
implement a one line coding
change?
114/14/2015
Wednesday
16710: COBOL V5 User Experience
Migration
First Steps
124/14/2015
1. Read the Book!
GC14-7383-03
First Steps
134/14/2015
1. Read Migration Guide
2. Create a project!
a) Scope
b) Effort
c) Expectations
1
2
3
4
Migration Project
144/14/2015
1
2
3
4
Project Milestones
154/14/2015
preliminary
work
organic
changes
aggressive
changesfinal
checkpoint
1 2 3 4
Project Timeline
164/14/2015
Time
3IBM grace period for running two COBOL versions¹
¹ talk with IBM
Preliminary Work
174/14/2015
• Simplify migration by completing these items beforehand
• Do not order COBOL v5 until you’re happy with the preliminary work!
1
Preliminary Work
184/14/2015
1
a Get current
Preliminary Work
194/14/2015
1
a Get current
b Complete LE runtime migration
Preliminary Work
204/14/2015
1
a Get current
b Complete LE runtime migration
bc Convert Load libraries to PDSE
Preliminary Work
214/14/2015
1
a Get current
b Complete LE runtime migration
bc Convert Load libraries to PDSE
d SCM product to drive all compiles
Preliminary Work
224/14/2015
1
e Order and install COBOL v5¹
¹ Likely to involve many PTF’s – don’t forget ISV’s too.
Preliminary Work
234/14/2015
1
e
f Implement COBOL v5 in SCM driven compiles
• JCL changes• decide on certain compile options
• AFP• ARCH• HGPR• OPT• SSRANGE• STGOPT
Order and install COBOL v5
1 2 3 4
Project Timeline
244/14/2015
Time
3
Organic changes
254/14/2015
2
a Pilot project
Organic changes
264/14/2015
2
a Pilot project
b Migrate programs as they come up for changes.
• Bug fixes
• Active development
• How much added regression testing?
Organic changes
274/14/2015
2
a Pilot project
b Migrate programs as they come up for changes.
• Bug fixes
• Active development
• How much added regression testing?
bc Publish results• CPU savings• % complete (total, by application)
Organic changes
284/14/2015
Challenges
• Expect “devil is in the details” type problems at this point.
• Exception criteria?
• When to move to step 3? What about code freeze?
2
b
1 2 3 4
Project Timeline
294/14/2015
Time
3
Aggressive changes
304/14/2015
• Identify HIGH CPU consumers or direct effect on your R4HA
• High volume CICS transactions or DB2 stored procedures.
• Long running batch jobs
• Decide how aggressive to address these changes.
• Publish results! (particularly $$$ savings)
• Consider migrating entire applications
3
1 2 3 4
Project Timeline
314/14/2015
Time
3
Final checkpoint
324/14/2015
• Confident of conversion effort – willing to retire the older COBOL
• Go through one code freeze cycle?
4
1 2 3 4
Project Timeline
334/14/2015
Time
3
Project Analysis
344/14/2015
• Did the project meet expectations?
• CPU savings
• $ savings
• effort
• What about the remaining COBOL programs?
5
Project by Group
354/14/2015
SCM Admin
Systems Applications
Project by Group
364/14/2015
SCM Admin
Systems Applications1. Compile JCL
2. Compile optionsa) At each promotion level
3. No-go gates
Project by Group
374/14/2015
SCM Admin
Systems Applications
1. LE Conversion
2. PDSE conversion
3. Currency
Project by Group
384/14/2015
SCM Admin
Systems Applications
1. Application Migration
2. Regression testing
394/14/2015
Wednesday
16710: COBOL V5 User Experience
Considerations
Compile Options
404/14/2015
Option Consideration
OPT(n) Recommend OPT(0) during development; OPT(2) for last compile
SSRANGE Can no longer be deactivated at run time
ARCH Lowest common denominator;DR considerations
Older Environments
414/14/2015
Environment Consideration
OS/VS COBOL Doesn’t mix with COBOL 5
VS COBOL II If NORES – cannot mix with COBOL 5
Storage Eye-catchers May be removed (STGOPT)
AMODE(24) Part of migration – to remove this restriction?
Abend Personality
424/14/2015
Index over-runs:
• May change from S0C7 to S0C4
• Over-run itself may corrupt / re-corrupt / un-corrupt index
- Removes forensics
- Applications may reach out to systems to help solve
4/14/2015 43
Questions?
4/14/2015 44
THANK YOU