Upload
mintcho-mintchev
View
4.057
Download
1
Embed Size (px)
Citation preview
RISK MANAGEMENT WORKSHEET1. Organization and Unit Location:710th ASMC, IL ARNG, North Riverside Armory
2. Page:1 of 1
3. Mission/Task:Classroom Instruction
4. Begin Date / Time Group:(DDTTTTRMMMYY)
5. End Date / Time Group: (DDTTTTRMMMYY)
6. Date Prepared:
7. Tasks 8. Identify Hazards 9. Initial Risk Level 10. Develop Controls 11. Residual
Risk Level 12. Implement Controls (“How To”) 13. Who/How Supervised
Classroom Instruction / Classroom Briefing
Wet floor during inclement weather
Extension cords and power strips
Chairs sliding back
Sickness
Dehydration
L
L
L L
L
Wipe boots on mats, mop floors as necessary;
Practice awareness and avoidance, keep drinks away from electrical equipment;
Practice awareness, look prior to sitting down;
Hand washing, trash disposal, cover mouth when sneezing;
Drink water, breaks in instruction;
L
L
L L
L
Brief participants during inclement weather;
Brief participants;
Brief participants;
Brief participants;
Brief participants, implement breaks in instruction;
Instructor
Instructor
Instructor
Instructor
Instructor
14. Overall Mission/Task Risk Level After Countermeasures are Implemented: (Circle Highest Remaining Risk Level) LOW (L) MODERATE (M) HIGH (H) EXTREMELY HIGH (E)
15. Prepared By: 16. Authority: