Upload
dutch-power
View
353
Download
2
Tags:
Embed Size (px)
DESCRIPTION
Dutch Power innovatiesessie 20 maart 2014
Citation preview
ENERGY CONNECTS
Blue Energy
Developments on
Afsluitdijk Test facility for RED
ENERGY CONNECTS
Session Blue Energy
Dutch Power Meeting March 2014
Rik Siebers
March 20, 2014
ENERGY CONNECTS
Contents
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
3
ENERGY CONNECTS
History (1)
• 2005 Foundation REDstack BV
• 2006 - … Fundamental Research Wetsus
• 2007 – 2010 First tests on surface water
• December 2011 Public Funding Afsluitdijk project
• May 2012 Private Funding
• May 2012 Start Design Process Afsluitdijk-plant
• June 2013 Permits obtained + start building
• September 2013 First buffer tank in place
• Expected: April 2014 Start experiments Afsluitdijk
4
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
ENERGY CONNECTS
History (2)
5
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
ENERGY CONNECTS
REDstack (1)
• Company founded in 2005, office in Sneek
• 10 employees – 6 FTE
• Funding
– Private, shareholders
– Public, subsidies (regional, national and EU)
• Shareholder structure
– W&F Magneto, Production of Special Anodes
– A. Hak, Contractor and Builder for Transportation Solutions
– Alliander, Manage and Design Energy Infrastructures
6
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
ENERGY CONNECTS
REDstack (2)
Characteristics of RED technology: • Electricity production from salt/fresh water
• No fossil fuels involved, no CO2-emissions
• No chimneys or high buildings
• Sustainable, no back-up required
• Contributes to political targets
Goal of REDstack: • Development
• Up-scaling
• Commercialization
7
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
ENERGY CONNECTS
REDstack (3) Technology Schematic representation of the RED process
8
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
REDstack (4) Technology
• Challenges of the RED pilot and demo phase
– Stack improvement
– Membrane improvement
– Facing real surface water (salt and fresh)
– (Bio) Fouling
– Cost reduction
– Environmental impact studies
• Challenges of RED in commercial phase
– Development of production facilities
– Market entry
9
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
Market expectations (1)
Characteristics markets:
• Surface water: large flow – low energy density
• Industrial water: small flow – high energy density
Products sales ambition worldwide:
• Key components
• Licenses
• Process design
10
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
ENERGY CONNECTS
Market expectations (2)
11
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
Maximum practical RED potential worldwide:
• Variation in estimations between 1.4 - 2.6 TW
Potential (technical/economical) in Netherlands:
• Estimated 1,5 GW
• Is about 10-15% of total Dutch electricity
consumption
ENERGY CONNECTS
Market expectations (3) Possible locations …
12
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
ENERGY CONNECTS
Market expectations (4) … related to energy coconsumption worldwide
13
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
ENERGY CONNECTS
Afsluitdijk Project (1)
14
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
Project spec’s:
• Project partners FujiFilm, Wetsus, REDstack
• Duration 4 years, start 2012
• Technical and system developments
• Stack and membrane development
• First complete system, real world conditions
• Private and public funding
ENERGY CONNECTS
Afsluitdijk Project (2)
15
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
Funding specs: • Public funding;
o SNN and Province of Fryslân 3.35 M€
• Private funding
o FUJIFILM 1.00 M€
o REDstack 2.36 M€
o Wetsus (in kind) 0.61 M€
• Total 7.33 M€
ENERGY CONNECTS
Afsluitdijk Project (3)
16
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
Project planning specs: • Final Design 4 months
• Construction 7 months
• Start-up 1 months
• Research phase 1 21 months
• Research phase 2 15 months
• Total 48 months
ENERGY CONNECTS
Afsluitdijk Project (4)
Scale: • 220 m3/h Seawater input
• 220 m3/h Freshwater input
• Goal: after 4 years 50 kW installed
Research Topics; • Pretreatment
• Membrane development
• Stack development
• Systems integration
17
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
ENERGY CONNECTS
Afsluitdijk Project (5)
18
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
Project location
ENERGY CONNECTS
Afsluitdijk Project (6) Position of pilot
19
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Questions
ENERGY CONNECTS
Afsluitdijk project (7)
Basic process principal
20
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
BufferIJsselmeer water
Pre-treatmentIJsselmeer water
RED stacks
Pre-treatmentWaddenzee water
Effluent bufferBuffer
Waddenzee water
ENERGY CONNECTS
Afsluitdijk project (8)
The initial design
21
Prefiltration
Buffer tanks
8 Stack positions • History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
ENERGY CONNECTS
Afsluitdijk project (9) Actual design: 3D Impression
22
• History
• REDstack
• Market
expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
ENERGY CONNECTS
Photo shoot [June 2013]
First action on location
23
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
Reinforced Concrete foundation
24
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
First (fairly informal!) meeting with contractors
25
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
First buffer tank (2013.09.02)
26
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
Buffer tanks in metalstructure
27
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk
photoshoot
• Questions
ENERGY CONNECTS
Open view on lJsselmeer
28
• History
• REDstack
• Market expectations
• Projects
• Afsluitdijk project
• Photo shoot
• Questions
ENERGY CONNECTS
Drumfilters on platform
29
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
Position intake fresh water
30
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
Fresh water intake
31
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
Position salt water intake
32
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
Salt water intake
33
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
Control unit
34
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
We worked from an empty location …
35
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
… Via …
36
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
… Via …
37
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
… And …
ENERGY CONNECTS
Uptill now [2014.03.20]
39
ENERGY CONNECTS
… With content …
40
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
… And with the RED team!
41
• History
• REDstack
• Market expectations
• Afsluitdijk project
• Afsluitdijk photoshoot
• Questions
ENERGY CONNECTS
Questions
Thank you for your attention.
Any questions?
42
• History
• REDstack
• Market
expectations
• Afsluitdijk projects
• Afsluitdijk
photoshoot
• Questions