Upload
abozhkovbalkanikaenergy
View
134
Download
1
Embed Size (px)
Citation preview
BALKANIKA ENERGY PLC
BALKANIKA ENERGY
Areas of activity of“Balkanika Energy” PLC:
Analysis of the current status, identify problems / opportunities, reengineering, modernization and active energy management to improve the effectiveness and reliability of existing energy systems.
Development, management and implementation of the investment projects for the production and energy usage, including from renewable sources.
The fundamental principle on whichour business is based:
Using the PROJECT PROCESS APPROACHin the implementation and management of activities.
PROJECT PROCESS APPROACHIMPLEMENTATION OF THE PROJECT
Diversification of the project activities
CONTRACT-ING/
RESULTS
FEASIBILITY STUDY/
DESIGNINGPLANNING EXECUTION
COMMISSIONING/SUBMISSION
SERVICE ENERGY
MANAGEMENT
PRINCIPAL/ The END RESULT
of the project activities
FINANCING INSTITUTIONS /Funding Scheme
Conceptualization of the project
idea /Analyze the
feasibility of the PROJECT
CONTRACTOR/Analysis, design,
equipment, construction
works
Surveys and Design/
Comparative techno - economic analysis,
CBA, concept, technical design,
selection of suppliers and subcontractors
Preparation of WORK PACKAGES of
Activities for PROJECT
implementation
Business Plans/For Principal,
Lending bank, Donor programs
Performance of the Activities on the
PROJECT realization according to the
business plan, Gantt charts and timetables
Preparation of Gantt Charts and
timetables for implementation and reporting on
the PROJECT
Regular reporting of the PROJECT
implementation
Commissioning/ (Receiving of the
PERMISSION TO USE)
Final Reporting and Submission to the
PRINCIPAL
Final Reporting to the Financing bodies or
Donor programs
Development and implementation of
Systems for Monitoring and Control of the Energy Costs
Organizing and carrying out warranty and maintenance of the Energy
Systems
Monitoring and Management of
Energy Costs
BALKANIKA ENERGY
"Balkanika Energy" PLC has established, maintains and develops
successful partnerships with a number of leading specialized design
companies,as well as with manufacturers of the
equipment and system for the production and energy usage,
including from renewable sources.
BALKANIKA ENERGY
Innovative nano-technologies to reduce cost and
improve performance.
INNOVATIVE TECHNOLOGIES LTDfrom KAZAN, RUSSIAN FEDERATION
• Full range of nano-materials
• Thermal insulation
• Hydro insulation & UV
protection
• Anti-radon protection
• Fire retardant
BALKANIKA ENERGYis a representative in Bulgaria and
Serbia of:
• Increase longevity of
surfaces
• Anti-corrosion & anti-rust
• Bacterial & chemical
protection
• Floor protection
• Primer
Thermal
insulation
Hydro & UV
protection
Anti-radon
protection
Fire
retardantIncrease
surface
longevity
Anti-
corrosion
and anti-
rustPrimer
Floor
protection
Bacteria and
fungi
protection
The Products
RE-THERM – Thermal Insulation
High-performance: 1mm = 5cm
Cost-effective:
› Reduce investment cost
› Reduce operating expenses
Wide application
Durable:15 year guarantee*
* Durability of concrete and metal surfaces in a moderately cold climatic region (Moscow)
Operating temperature: - 60 ° C to + 250 ° C
Applicable to hard-to-reach places
Technical Specifications Resistance to temperature extremes
› From -40 ° C to + 60 ° C Unchanged
› Exposed to over +250 ° C for 1.5 hours Yellowing, cracking and delamination No blisters
Resistant to seismic activity› Elongation at break 9.1 %› Elongation at break after aging - 10 years
8.4 %
Technical Specifications Safe, easy to apply and applicable to
hard to reach places› Liquid-form› Light-weight 0.4 kg / 1 mm / 1 m2
Ecologically-friendly› Water-based› Stable does not react to:
Cement, gypsum, soap, acid, salt, bitumen, alcohol, organic solvents, petrol, oil, diesel
Reduce heat loss in heat transfer systems
Method of application
Air spray guns
Ordinary painting tools
Applicable to:Industrial systems
Applicable to:Buildings
R-COMPOSIT – Hydro insulation and UV Protection
Excellent water resistance
› 0.5 atm, 24 hours
Protection from sunlight
› Reflectiveness: 80%
› Reflected infrared radiation: 85%
› Resistant to UV
Technical Specifications Operating temperature
› From -70 ° C to + 100 ° C› Frost resistance of the finished coating of
120 cycles (no less than 15 years) Wide application
› Concrete, plaster, rolled roofing materials, slate, metal, tiles, etc.
High strength and elasticity› Elongation at rupture 503 %
R-COMPOSIT RADON
Achieve excellence in health at home
and work
› Drastically inhibits Radon accumulation
What is Radon?
› Radon is a natural radioactive element
› Health implications
Technical Specifications Essentially same technical
specifications as R-COMPOSIT Two variations
› Radon-1 Magnesite› Radon-2 Magnesite and Shungite
Application in:› Households, public cooking and eating
areas, hospitals, schools, etc.
Method of application
Air spray guns
Ordinary painting tools
RE-FLAME
Extreme fire resistance
› No damage for 90 minutes at + 1600 ° C
Easy application due to liquid form
Durable and easily repairable
› 20 year durability outdoors
› 30 year durability indoors
Experiment with RE-FLAME
Front Side: with layer of RE-
FLAME
Back Side: without layer of RE-FLAME
+ 1600 ° C + 174 ° C
Experiment with RE-FLAME
1 min.
5 min.
20 min.
Up to 90 min.
Technical Specifications Type of thin film intumescent coating Up to 30, 45, 60, 90 min. of non-deformation Apply to:
› Enclosing and support structures of concrete and reinforced concrete
› Load-bearing metal constructions› Air ducts (ventilation channels)› Flat roofs› Window frames› Wood constructions
Method of application
Air spray guns
Ordinary painting tools
NANO-FIX Anticor *
Highly-effective
Stops the process of corrosion
Neutralizes current corrosion
Protects surface
* For surface-level (several mm.) corrosion damage only.
Technical Specifications Operating temperature
› From -70 ° C to + 230 ° C Drying time
› 12 hrs. at 18-22 ° C› 40 min. at 100-110 ° C
Two-stage process:› Converts rust already present› Stops rust from forming
No coating
50 / 50 Complete
NANO-FIX Medic
Highly-effective agent versus
microorganisms
Achieve pure production process
Comply with health requirements
Eliminates most known microorganisms
Technical Specifications Treats and eliminates:
› Aspergillus niger, Aspergillus terreus, Penicillium funiculpsum, Penicillium ochro-chloron, Paecilomyces variotii, Trichoderma viride, and many others
Apply to:› Public and residential buildings, Food
industry, Pharmaceutical industry, Health care facilities and Child care facilities
NANO-FIX Primer
Excellent surface preparation
Strong adhesion
Priming of type of surface:
› Aluminium, Magnesium, Titanium alloys,
Plastic, Carbon steel, Galvanized steel and
Stainless steel
Technical Specifications
Drying time› No more than 1 hour at 20±2 ° C› Enamel paint applied 2-3 hours after
drying Recommended thickness of
› 0.08 - 0.15 mm
NANO-FIX Strong
Strengthens and hardens floor surfaces
Provides wear and chemical resistance
of floor surfaces
High adhesion and easy use
Technical Specifications Operating temperature
› From -70 ° C to + 180 ° C Resistance to:
› Boiling water at +97 ° C to +103 ° C for 40 hrs.› Diesel fuel for 96 hours› 15% aqueous sodium chloride solution 96 hrs.› 15% aqueous solution sulfuric acid for 96 hrs.› Temperature of +190 ° C for 1 hours
Example: Production hall
Example:Hostel
NANO-FIX Effective preparation of concrete and sand-
cement bases for laying tiles, parquet, laminate,
linoleum or carpet
Increases durability, protects and strengthens
surfaces
Reduces required amount and increases
effectiveness of paint and coating
Health benefits: Hypoallergenic
Technical Specifications
Depth impregnation > 5mm
De-dusting surface: complete
Durability: at least 15 years
Partial water resistance
Some chemical protection
Method of application
Air spray guns
Ordinary painting tools
Thermal
insulation
Hydro & UV
protection
Anti-radon
protection
Fire
retardantIncrease
surface
longevity
Anti-
corrosion
and anti-
rustPrimer
Floor
protection
Bacteria and
fungi
protection
Total Solution!(Just) Products
PROJECT PROCESS APPROACHIMPLEMENTATION OF THE PROJECT
Diversification of the project activities
CONTRACT-ING/
RESULTS
FEASIBILITY STUDY/
DESIGNINGPLANNING EXECUTION
COMMISSIONING/SUBMISSION
SERVICE ENERGY
MANAGEMENT
PRINCIPAL/ The END RESULT
of the project activities
FINANCING INSTITUTIONS /Funding Scheme
Conceptualization of the project
idea /Analyze the
feasibility of the PROJECT
CONTRACTOR/Analysis, design,
equipment, construction
works
Surveys and Design/
Comparative techno - economic analysis,
CBA, concept, technical design,
selection of suppliers and subcontractors
Preparation of WORK PACKAGES of
Activities for PROJECT
implementation
Business Plans/For Principal,
Lending bank, Donor programs
Performance of the Activities on the
PROJECT realization according to the
business plan, Gantt charts and timetables
Preparation of Gantt Charts and
timetables for implementation and reporting on
the PROJECT
Regular reporting of the PROJECT
implementation
Commissioning/ (Receiving of the
PERMISSION TO USE)
Final Reporting and Submission to the
PRINCIPAL
Final Reporting to the Financing bodies or
Donor programs
Development and implementation of
Systems for Monitoring and Control of the Energy Costs
Organizing and carrying out warranty and maintenance of the Energy
Systems
Monitoring and Management of
Energy Costs
BALKANIKA ENERGYCombine innovative nano-materials using
our
Example of how the products can be applied and combined:Pipes and heat-sensitive material transportation systems.
Achieve maximal sustainable effect
Example of how the products can be applied and combined:Manufacturing and storage facilities.
Achieve maximal sustainable effect
Example of how the products can be applied and combined:Households and commercial buildings.
Achieve maximal sustainable effect
Thank You!How may we help You?
Bulgaria, 1680 Sofia, 88 Bulgaria blv., fl. 1, off.9-10
tel.: +359 2 465 3291fax: +359 2 419 7046