78
SECTION I Metal Roofs Insulating Coatings Corporation 956 South Highway 41 Inverness, Florida 34450 (800) 345-5306

Astec Metal Roof Projects

Embed Size (px)

Citation preview

Page 1: Astec Metal Roof Projects

SECTION I

Metal Roofs

Insulating Coatings Corporation956 South Highway 41

Inverness, Florida 34450(800) 345-5306

Page 2: Astec Metal Roof Projects

Client:Heatcraft, Inc. / Cierro117,000 sq. ft. Metal RoofCopper Tube ManufacturerBossier City, LA

Dealer:MTC Coatings, Inc.

100% Rust Primed with ASTEC B-16-71

Cause: Chemical reaction from copper pipes to metal roof deck from a sprinkler systempreviously used to cool metal roof deck.

Project:Steel smelting operation

Exterior surface condition:Heavy black carbon deposits

The need for a roof top sprinkler system waseliminated when the ASTEC system was applied.

Client:Heatcraft / Cierro

Completed: October 1994

ASTECB-16-71 PrimerASTEC WPM #9 Waterproof MembraneASTEC #900 Ceramic Acrylic Finish Coat

Page I-I

Page 3: Astec Metal Roof Projects

Client: Kimberly-Clark CorporationBaby Wipes Div.Maumelle, Arkansas

Project: 84,000 sq ft Standing Seam Metal Roof

Pre-existing repair with TOP COAT materialsresulted in water entrapment, moisture intrusion,metal panel deterioration and coating failure.

Adhesive-backed reinforcement cloth withASTEC WPM #9 was used at point of end lapseam under fasteners. This procedure created alow profile seam system allowing positive flowof water run off. The standing seam roof systemhad a ½” to 12” slope.

Phase 1 completed: May 1997Phase 2 scheduled for Spring 1998

Page 4: Astec Metal Roof Projects

Client:Lee Laser / Orlando, Fl

Dealer:WeatherShield Coatings, Inc.

Project:24,000 sq. f1. Standing Seam Metal Roof

ASTEC WPM #9 and polyester cloth applied to allend lap and ridge cap seams. ASTEC WPM #9brush & roll grade applied to all sidelap seams.

Special condition: ponding water between AlCunits and ridge cap.

Action taken: special cap was installed to raiseelevation enabling positive water flow betweenridge cap and AlC units.

ASTEC #900 Ceramic Acrylic Finish Coat

Completed: September 1996

Page 1-3

Page 5: Astec Metal Roof Projects

Client:Leone IndustriesBridgeton, NJ

Project:50,000 sq. ft. Metal Roof100% RustRusted section proposed for 1997.

ASTEC B-16-7 I Metal Primer

ASTEC WPM #8 Waterproof Membrane

ASTEC #100 Ceramic Finish Coat

Completed: 35,000 sq. ft. 199050,000 sq. ft. 1993

Page 1-4

Page 6: Astec Metal Roof Projects

Client:Friskee's Crete / Nebraska

Dealer:Midwest Thennal Coatings, Inc.

Project:70,000 sq. ft. Metal Roof

ASTEC #100 White Metal Roof ApplicationASTEC #100 16-1 Brown Metal Exterior Sidewall Application plus inside walls

••• ••

170,000 sq. ft. Exterior Sidewalls

• I

Page 1-5

Page 7: Astec Metal Roof Projects

Client:American Meter / Omaha, NE

Dealer:Midwest Thermal Coatings

Project:60,000 sq.ft. of various metal roofs completed overa 3 year period.

ASTEC WPM #8 waterproofmembrane

ASTEC #100 ceramic finish coat

•.<

Page 1-6

Page 8: Astec Metal Roof Projects

Client:Nimnicht ChevroletJacksonville, FL

Completed: July 1996

Project:80,000 sq.fl. Metal Roof

-------- - - ----_.__....._---

Ridge Cap: Foam Closure Repair

Interior Gutter Repair

Page 1-7

Page 9: Astec Metal Roof Projects

Client: Noland CompanyFredericksburg, VA

Project: 50,400 sq. ft. Standing Seam Metal Roof29,102 sq. ft. Exterior Metal, Brick, Masonry Walls

Before After

Page 10: Astec Metal Roof Projects

Client:Northern TelecomBayan Lepas, Malaysia

Project:Phase I43,000 sq. ft. metal roof - 50% light surface rust

Before

Dealer:STH Contract Services Sdn Bhd

After

Project completed: January 1996

Page 1-9

Page 11: Astec Metal Roof Projects

Client:Agrum / Nebraska

Dealer:N.E.N.E.S.

Project:90,000 sq. ft. Stainless Steel

Before

After

ASTEC # 100 Ceramic Finish Coat

Page 1-10

Page 12: Astec Metal Roof Projects

Client:AmTrak Repair StationTrain car restoration centerBear, DE.

Project:250,000 sq ft Standing Seam

ASTEC B-16-71 Metal Primer

ASTEC WPM #8 WaterproofMembrance

~~~~~~~~~~~~~ ASTEC #100 Ceramic Finish Coat

Completed: December 1994

Page I-II

Page 13: Astec Metal Roof Projects

Client:BCT Printing / Atlanta, GA

Dealer:Thermal Control Coatings, Inc.

Project:Removal of "Kool Seal" aluminum coatings

Heavy surface oxidation was caused by coatingbreakdown; required multiple passes of pressurecleaning.

Primed with ASTEC B-16-71

Waterproofed with ASTEC WPM #9

Finish coated with ASTEC #100

Page 1-12

Page 14: Astec Metal Roof Projects

Client:Falco Lime / Vicksburg, MS

Dealer:MTC Coatings, Inc.

Project:28,400 sq ft R-panel Metal Roof16,000 sq ft Exterior Metal Sidewalls

Results:15 degree reduction of insidetemperature after completion of roofapplication.

10 percent reduction in heat transferafter completion of sidewallapplication.

.... ..Roof:ASTEC WPM #9 WaterproofMembrane

ASTEC #900 Ceramic Finish CoatWhite

Sidewalls:ASTEC #900 Ceramic Finish Coat16 to 1 Grey

Project completed: June 1996

Page 1-13

Page 15: Astec Metal Roof Projects

Client:Noland CompanyMobile, AL

Rust primed with ASTEC B-16-7l metal primer.

Project:80,000 sq ft Metal Roof and Metal SidewallsR-panel and Standing Seam, 100% Rust

Scaling rust was removed by mechanical brush.

Skylight replacement was fabricated.

Page 1-14

Page 16: Astec Metal Roof Projects

Noland Companycontinued

Extreme delamination of previous paint. Heavy chalky surface.

-\ -. ......I

Project completed: November 1994 ASTEC #900 Ceramic Acrylic Finish Coat in"Bone White"

Page 1-15

Page 17: Astec Metal Roof Projects

Client:Quantum Technologies, Inc.Lake Mary, FL

Project:16,051 sq ft Metal Roof

Dealer:WeatherShield Coatings, Inc.

Urethane foam used to fill in air space void at point of metal flashing.Roof sealed with ASTEC WPM #9 waterproofer and finish coated with ASTEC #900.

Project completed: April 1996

I;

=

Page 1-16

Page 18: Astec Metal Roof Projects

Client:University of Missouri

Project Completed: 1995

ASTEC B-16-7l metal primer.

Project:Quonset Hut25,000 sq ft Metal Roof

ASTEC WPM #9 waterproof membranehorizontal and vertical seams.

ASTEC #900 ceramic acrylic finish coat in beige color.

Page 1-17

Page 19: Astec Metal Roof Projects

Client:Walt Disney World Office ComplexKissimmee, FL

Dealer:WeatherShield Coatings, Inc.

Project:70,000 sq. ft. Standing Seam Metal RoofASTEC #900 Base Blue

Factory finish roof was heavily chalked requiring extensive surface preparation. Standing seamside lap caps required special crimping due to extreme expansion and contraction I thermalshock. This roof is less than 7 years old.

All seams, protrusions, and crevices were sealed with ASTEC WPM #9 waterproof membrane.

Page 1-18

Page 20: Astec Metal Roof Projects

Walt Disney World Office Complexcontinued

Urethane foam was applied to open voids toeliminate wind-driven rain leaks. Foam was sealed ..._ .. .,--=::.-with ASTEC WPM #9 waterproof membrane.

ASTEC #900 ceramic acrylic finish coat in "base blue".

Project Completed: October 1995

Page 1-19

Page 21: Astec Metal Roof Projects

Client:Anderson ChemicalMacon, GA

Dealer:Thennal Control Coatings, Inc.

Project:40,668 sq. ft. Metal Roof

A tar-based asphalt and silveraluminum coating embedded with ametal mesh reinforcement waspresent on all purlin line runs

I~~~~~;~~:=~ including bridging of fastener heads.As the roofing materials aged and

became cracked and brittle,moisture infiltration causedcorrosion and small pin holes whichhad to be repaired and sealed priorto the ASTEC Coating Systemapplication.

ASTEC B-16-71 metal primer.

ASTEC WPM #9 waterproofmembrane.

ASTEC #900 ceramic acrylic finishcoat.

Project Completed: 4 196

Page 1-20

Page 22: Astec Metal Roof Projects

Client:Carlton BrutonMarietta, GA

Dealer:Thermal Control Coatings, Inc.

Project:12,000 sq. ft. Metal Roof

Surface was pre-coated with whiteelastomeric.Rust bleed through present on 70%of surface. ...__.... ,

--

-

Rust was primed with ASTEC B-16­71.

Surface was waterproofed withASTEC WPM #9.

Roof was then coated with ASTEC#900 in Custom Green.

Project Completed: May 1996

Page 1-21

Page 23: Astec Metal Roof Projects

Client:Denver Airport, Federal Aviation AuthorityDenver, CO

Project:New Standing Seam Metal Roof

Project Completed: March 1996

ASTEC WPM #9 waterproof membrane.

ASTEC #900 base brown color

Page 1-22

Page 24: Astec Metal Roof Projects

Client:Department of TransportationBrittany Maintenance UnitBaton Rouge, LA

Project:5,453 sq ft Quonset Hut

Dealer:Advanced Technologies, Inc.

100% rust

Light acid washdown given to assist in neutralizing the heavy surface rust. Surface fully primedwith ASTEC B-16-71. ASTEC WPM #9 membrane was applied to all seams and fasteners.ASTEC #900 ceramic finish coat was applied on top.

Page 1-23

Page 25: Astec Metal Roof Projects

Client:EcolochemMiami, FL

Dealer:Insulating Coatings of South Florida, Inc.

Project:27,000 sq. ft. Metal Roof

ASTEC WPM #8 waterproof membrane

ASTEC #100 ceramic finish coat

Extreme pre-existing tar base patchand repair.

This project was completed just 3weeks prior to the onset ofhurricane Andrew. The ASTECsystem remained flexible andprevented any loss of metalflashings or leaks which otherwisemay have been caused by the storm.

~,\

Project Completed: 8 /92

.

Page 1-24

Page 26: Astec Metal Roof Projects

Project: 15,116 sq. ft. Metal Roof

Dealer: Ahrens CompaniesProject Completed: 1994

Silver Aluminum Coatings FailureInterior Gutter, Panel Rust, Wet Insulation

Client: Florida Power & Light CorporationIndiantown, FL

'Applied two coatsASTEC B-16-71 metalprimer

'Applied Pol-E-Forcepolyester cloth 12"widewith WPM 9 waterproofmembrane

*Sealed interior gutterand metal panel

'Applied Pol-E-Basebituminous backed cloth "i_;;;::~;;:i~III!!I:.1IJ!il1!!4"wide r

'Replaced metalflashing

*Removed coating andwire brushed to removeheavy scale rust

'ASTEC #900 Finish coat applied

Page 1-25

Page 27: Astec Metal Roof Projects

.,',..'

~,", .

'./'.' ;I'"

".

--- ,-"",,

Project completed: 1995

ASTEC B-16-71 metal primerASTEC WPM #9 waterproof membraneASTEC #900 ceramic finish coat

Dealer:Trigg & Associates

Project:40,000 sq. ft. R-panel Metal Roof withlight rust

Client:Graybar Electric - New Orleans, LA

Page 1-26

Page 28: Astec Metal Roof Projects

Client:Marathon LatoumeauOil Rig ManufacturerVicksburg, MS

Project:Corrugated Metal Roof withWood Nails into WoodStructure, 100% Rust

Dealer: MTC Coatings, Inc.

27,000 sq. ft. with 1200patches applied

ASTEC B-16-71 metal primer

ASTEC WPM #9 waterproofmembrane

ASTEC #900 ceramic finish coat

Page 1-27

Page 29: Astec Metal Roof Projects

Client:NASAJohnson Space CenterHouston, TX

Dealer:Terow Construction

Project:Metal Roofs and Sidewalls

ASTEC # 100 Ceramic Finish Coat

.... ,," ;~i~-

Page 1-28

Page 30: Astec Metal Roof Projects

Client:Noland PropertiesComputer Mainframe BuildingNewport News, VA

Project:Metal Roof and Sidewalls

Roof: ASTEC #900 White

Trim: ASTEC #900 Base Blue

Walls: ASTEC #900 Bone White

Page 1-29

Page 31: Astec Metal Roof Projects

Client:Palm Island Condo ResonCape Haze, FL

Project:150,000 sq. ft.5 Year Project

5-V Crimp Metal Roof Panels,ASTEC #900 16-1 greyWood Walls, Rail and Trim inASTEC #900 White

Coastal application with heavy salt and sand abrasion.

Page I-3D

Page 32: Astec Metal Roof Projects

Client:Kehler RanchesPotato Seed WarehouseMonte Vista, CO

Dealer:Roof Mechanics

25,000 sq.ft. Metal Roof

ASTEC #900 cerarllic finish coat

Client:Growers and Shippers Potato CompanyMonte Vista, CO

Dealer:Roof Mechanics

30,000 sq.ft. Metal Roof

ASTEC #900 ceramic finish coat

Page 1-31

Page 33: Astec Metal Roof Projects

Client:Sports AuthorityMiami, FL

Project:90,000 sq. ft. R-panel Metal Roof

Dealer:Insulating Coatings of South Florida, Inc

Area was spot primed with ASTEC 8-16-71 metal primer; sealed with ASTEC WPM #8.

Area was then coated with ASTEC #100 finish coat.

Page 1-32

Page 34: Astec Metal Roof Projects

Client:Vincent MetalsLittle Rock, AR

Project:27,000 sq. ft. Fiberglass Skylight Panels95,000 sq. ft. Metal Roof Panels

All skylights and seams were sealed with ASTEC WPM #9, polyester cloth and ASTEC #900ceramic finish coat.

This building had continuous vibrations through the center due to heavy crane operation.

Page 1-33

Page 35: Astec Metal Roof Projects

Client:City of West Palm BeachWest Palm Beach, FL

Dealer:Ahrens Companies

Project:lO,552 sq. ft. R-panel Metal Roof

Metal panel deterioration at roofs eave.

Moisture wicking at gutter line caused rust deterioration from underside of panel.

New panel configuration was installed. Acomplete ASTEC "dry in" with ASTEC WPM #9waterproof membrane and polyester cloth wasapplied.

ASTEC #900 ceramic acrylic finish coat was thenapplied.

Page 1-34

Page 36: Astec Metal Roof Projects

Client:Wayne Dalton CorporationPensacola, FLGarage Door Manufacturer

Project:216,000 sq.ft. Metal Roof

This building consists of flat aluminum garage doorstyle panels with interlocking seams.

ASTEC #900 finish coat Full ASTEC seam system with ASTECWPM #9 and polyester cloth embedded.

105,000 sq.ft. of standing seam on 50% of roof surface with 100% rust neutralized with ASTECB-16-71 in black color.

The roof had metal shavings 112" deep layered on top it's surface for approximately a seven yeartime period.

Page 1-35

Page 37: Astec Metal Roof Projects

Wayne Dalton cont'd

30" wide interior gutter back flowed water5 to 6 feet up to the metal panels.

Parapet wall and gutter sealed withASTEC WPM #9 and polyester cloth.

Additional drain was installed with an increase in the "collar" style sleeve underneath the maindrains by 2" in diameter, allowing for a 50% increase in the rate of water flow.

Page 1-36

Page 38: Astec Metal Roof Projects

Wayne Dalton Corporation cont'd

105,000 sq.ft. Custom interlocking aluminum panel design with a rubber "T" style strip betweenall seams.

This project has been budgeted for a recoat andwarranty renewal during the year 2004.

12" wide polester cloth installed with ASTEC WPM#9 over every rubber "T" strip cenered over all side lapseams.

660 linear feet of continuous connecting skylight,fasteners installed every 2 inches and skylight end lapseams every I0 feet.

Project completed: August 1994

ASTEC #900 ceramic acrylic finish coat

Ten year material and labor warrantyoffered.

Page 1-37

Page 39: Astec Metal Roof Projects

Client:Ace Mailing ServiceSmyrna, GA

Dealer:Thermal Control Coatings, Inc.

Project:40,000 sq ft Metal Roof

ASTEC B-16-71 metal primerASTEC WPM #9 waterproof membrane with polyester cloth reinforcementASTEC #900 ceramic acrylic finish coat

Project completed: March 1997

Page 1-38

Page 40: Astec Metal Roof Projects

Client:American Valve & HydrantBeaumont, TX

Dealer:Sunpath Coatings, Inc.

Project:15,980 sq. ft. Metal Roof

Retro-fit new panels with fullASTEC coating system installed

Old rotted asphalt coated metal wasremoved and replaced with new 26gauge galvalume panels.

Project completed: April 1996

The roof was then water­proofed with ASTEC WPM #9and finish coated with ASTEC#900.

Page 1-39

Page 41: Astec Metal Roof Projects

Client:Buna Independent School DistrictBeaumont, TX

Dealer:Sunpath Coatings, Inc.

Project: Flat Deck Gravel Roof Retro-fit / Metal Roof-over with full ASTEC Coating System

. '" - ..---_ _~J" .... -. ;'" "'-:__ 1

Flat deck gravel roof holding ponding water.

New metal roof-over providing positive slope and water flow.

ASTEC WPM #9 waterproof membrane ASTEC #900 ceramic finish coat

ad

Page 1-40

Page 42: Astec Metal Roof Projects

Client:Aberdeen Proving Ground, MDBowling Lanes Building

Dealer:Quantum Enterprises

Project:20,000 sq. ft. Metal Roof

ASTEC WPM #8 waterproof membrane

ASTEC #100 ceramic finish coat

Page 1-41

Page 43: Astec Metal Roof Projects

Client:City of West Palm Beach, FL10,552 sq. ft. Metal Roof

Dealer:Ahrens Companies

Project completed: June 1996

Sealed around protrusions with ASTEC WPM #9

and polyester cloth.

ASTEC #900 ceramic finish coat

Page 1-42

Page 44: Astec Metal Roof Projects

Client:C.T. FilmDalton, GAFilm Processing Manufacturer

Project:50,375 sq. ft. Metal Roof100% Rust

Sensitive interior temperaturesstabilized after application ofASTEC #900 ceramic finish coat.

Project completed: 09/96

ASTECB-16-71ASTEC WPM #9ASTEC#900

Dealer:Thermal Control Coatings, inc.

All skylights were replaced withmetal panels.

ASTEC WPM #9 waterproof~~~ membrane eliminated all pre-

... existing leak problems.

Page 1-43

Page 45: Astec Metal Roof Projects

Client:G.E.C. Precision Corp.Wellington, KS

Dealer:D J Mobile, Inc.

Project:7,248 sq. ft. Metal Roof100% Rust

Project completed: July 1997

ASTEC B-16-7l metal primer

ASTEC #900 ceramic finish coat

ASTEC WPM #9 waterproof membrane

Page 1-44

Page 46: Astec Metal Roof Projects

Client:Gillman Pontiac-BuickHouston, TX

Dealer:Ceramic Coatings, Inc.

Project:80,000 sq. ft. Multiple Metal Roofs100% Rust

Full ASTEC coating system was used:ASTEC B-16-71 metal primerASTEC WPM #9 waterproof membraneASTEC #900 acrylic ceramic finish coat

Page 1-45

Page 47: Astec Metal Roof Projects

Gillman Pontiac-Buick continued

Project Completed: December 1996

Page 1-46

Page 48: Astec Metal Roof Projects

Client:Golf Car Sales & SupplyPeachtree City, GA

Dealer:Thermal Control Coatings, Inc.

Project:3,450 sq. ft. Metal Roof100% Rust

Heavy tar removal

Multiple pinholeperforations

Patch and repair withnew panel integration

Full ASTEC systemused:ASTECB-16-71ASTECWPM#9ASTEC#900

Project completed:9/96

Page 1-47

Page 49: Astec Metal Roof Projects

Client:Harrison County Board of SupervisorsGulf Port, MS

Project:78,541 sq. ft. Metal Roofs100% Rust

Code Enforcement OfficeSheriffs Center / Vehicle MaintenanceBuilding & Grounds MaintenanceField Office

Dealer:MTC Coatings, Inc.

ASTEC B-16-71 metal primerASTEC WPM #9 waterproof membraneASTEC #900 ceramic finish coat

Project completed: 04/96

Page 1-48

Page 50: Astec Metal Roof Projects

Client:Department Of TransportationState of LouisianaBrittany, LA

Dealer:Advanced Technologies, Inc.

Project:5,450 sq. ft. Metal Roof100% Rust

ASTEC B-16-71 metal primerASTEC WPM #9 waterproof membraneASTEC #900 ceramic finish coat

Page 1-49

Page 51: Astec Metal Roof Projects

Client:Oaks Precision FabricationHouston, Texas

Dealer:Ceramic Coatings, Inc.

Project:30,049 sq. ft. Metal Roof

This project originally had a spray urethane foam

system on the entire roof. The foam degraded from !~~~;~~~;~~:~the ultra-violet exposure causing moisturemigration underneath the entire foam system. ::~I1111!~~:....1lI

ASTEC WPM #9 waterproof membraneASTEC #900 ceramic acrylic finish coat

Project completed: 10/96

All urethane foam was completely removed fromthe metal deck and the ASTEC ceramic coatingsystem was applied. No leaks were detected afterthe completion of the ASTEC waterproof coatingsystem.

Page I-50

Page 52: Astec Metal Roof Projects

ASTEC B-16-71metal primer

BEFORE

ASTEC#IOOceramic finishcoat

AFTER

POREXATLANTA, GEORGIA

ASTEC CERAMICINSULATING RE-ROOFING SYSTEM

Page I-51

Page 53: Astec Metal Roof Projects

Client:Riverfront GrovesYero Beach, FL

Project:31,400 sq. ft. Metal RoofCorrugated Panel

Dealer:Nordic Trading Co.Energy Coatings Corporation

ASTEC B-16-71 metal primerASTEC WPM #8 waterproof membraneASTEC #900 ceramic acrylic finish coat

Twenty-year-old corrugated panel was no longer available so ASTEC was this client's most cost­effective alternative to roof replacement. ASTEC stopped their leak problems and saved theirroof.

~-- ..~ -

Project completed: October 1996

Page I-52

Page 54: Astec Metal Roof Projects

Client:Rock-Tenn "Corrugator" BuildingNorcross, GAPackaging Design Manufacturer

Project:

Dealer:Thermal Control Coatings, Inc.

120,000 sq. ft. Multiple Metal Roofs

ASTEC stopped the leaks and stabilized interior temperatures.

ASTEC #4200 surface conditioner

Page I-53

Page 55: Astec Metal Roof Projects

Rock-Tenn continued

ASTEC WPM #9 waterproof membraneASTEC #900 acrylic ceramic finish coat

Project completed: October 1996

Page I-54

Page 56: Astec Metal Roof Projects

Client:Southwest Beverage, Inc.Lake Charles, LA

Project:Anheuser-Busch DistributorTemperature Control Warehouse16,792 sq. ft. Metal RoofCorrugated Metal PanelsStanding Seam Panels

Dealer:Sunpath Coatings, Inc.

After the ASTEC system was installed a temperature analysis was performed over a two monthperiod. The results indicated an average reduction of 7 degrees in the inside temperature of thewarehouse.

Project completed: April 1996

ASTEC #900 acrylic ceramic finish coat

Page I-55

Page 57: Astec Metal Roof Projects

Client:Thomaston MillsHuman Resources BuildingThomaston, GA

Dealer:Thermal Control Coatings, Inc.

50% Rust

Previously coated with Kool Seal, this entire roofsurface had a bad chalk condition which requiredadditional surface preparation.

Asphalt tar materials were heavily applied at theridge cap seams.

ASTEC 8-16-7 I metal primerASTEC WPM #9 waterproof membraneASTEC #900 ceramic finish coat

Project completion: April 1996

Page I-56

Page 58: Astec Metal Roof Projects

Client:Thomas W. Ruff, Office DepotMaitland, FLOffice Furniture Distributor

Project:48,875 sq. ft. Metal Roof19,867 sq. ft. Metal/Stucco Sidewalls

Dealer:WeatherShield Coatings, Inc.

Front sales offices have stucco walls which were coated with ASTEC 5000HB TEX coarsefinish. The rear warehouse metal sidewalls are coated with ASTEC #900 acrylic finish.

Project completed: March 1997

Page I-57

Page 59: Astec Metal Roof Projects

Client:Wheeling Pittsburgh SteelPittsburgh, PA

Dealer:Specialty Coatings, Inc.

Project:65,000 sq. ft. Metal Roofs100% Rust

60 feet high ridge cap ventilators

Due to the height and design of the roofventilators, this project presented unusual workingrequirements as well as extended man hours.

Full ASTEC waterproof system was installedwith:ASTEC B-16-71 Metal PrimerASTEC WPM #8 Waterproof

:'~::::.~~cll:'=:::9 ASTEC # 100 Ceramic Finish Coat

Page I-58

Page 60: Astec Metal Roof Projects

Client:Doane Products Co.Manassas, VADog Food Manufacturer

Dealer:American Eagle Energy, Inc.

Project:51,000 sq. f1. Metal Roof

ASTEC WPM #9 waterproof membraneASTEC #900 acrylic ceramic finish coat

Page I-59

Page 61: Astec Metal Roof Projects

Client:Graham WhiteSalem, VA

Dealer:Wick's Painting, Inc.

Project: 21,110 sq. ft. Quonset Hut Corrugated Panels

ASTEC B-16-71 metal primer

ASTEC WPM #9 waterproof membraneASTEC #900 ceramic acrylic finish coat

Page 1-60

Page 62: Astec Metal Roof Projects

Client:McAllen ComponentsMcAllen, TX

Dealer:Protective Coatings of Texas

Project: 60,000 sq. ft. Standing Seam Metal Roof

The cross-over support bars were removed at the point where they met the end laps. ASTECWPM #9 was applied with polyester cloth reinforcement; then support bars were re-installed.

1'!

-

ASTEC #900 Ceramic Acrylic Finish Coat

Page 1-61

Page 63: Astec Metal Roof Projects

Client:MID TotcoInstrumentation ManufacturerCedar Park, TX

Dealer:Protective Coatings of Texas

Project:211,468 sq. f1. Standing Seam

, ,

Flashing seams had aluminum asphalt backed tape at all seams, water penetration occurred due totape curling and pulling loose; thermal shock also ensued.

Previous sealants and repair efforts were removed by heat guns, minimizing man-hour costs.

Page 1-62

Page 64: Astec Metal Roof Projects

MID Totco continued

ASTEC adhesive-backed reinforcement cloth was used on this project with ASTEC WPM#9.This method was found to be very efficient enabling an instant dry-in condition.

Project completed: July 1997

Page 1-63

Page 65: Astec Metal Roof Projects

Client: Marathon Letourneau, MSOil Rig Manufacturer

Dealer: MTC Coatings, Inc.

Project: 100% rust, nails into wood purlins

ASTEC B-16-71 metal primer, ASTEC WPM #9 waterproof membrane, ASTEC #900 ceramicfinish coat

Client: Mississippi National Guard Dealer: MTC Coatings, Inc

Project: Corrugated Quonset Hut

This project had urethane foam over the entire metal surface area. The Astec coating system wasapplied with a full polyester cloth reinforcement embedded with Astec WPM 9 waterproofmembrane and finish coated with Astec #900 in a military beige.

Page 1-64

Page 66: Astec Metal Roof Projects

Dealer:MTC Coatings, Inc.

Client:Anderson Tulley SawmiJiVicksburg, MS

Project:Multiple Metal Roofs100% Rust

The ASTEC coating system saved these roofs from new metal replacement costs

Dealer:MTC Coatings, Inc.

Client:Falco Truck LineFleet Truck Maintenance ShopVicksburg, MS

Projects:28,000 sq. ft. Metal Roofplus Metal Sidewalls

Polyvulc Plant55,000 sq. ft. Metal Roof

Dealer:MTC Coatings, Inc.

Client:Atwell ChevroletVicksburg, MS

Project:45,663 sq. ft. Metal Roof

100% Rust, R-Panel previously coated withKool Seal. Due to overspray concerns fromhigh wind coming from the MississippiRiver, this entire project had to be done bybrush and roll application.

ASTEC B-16-71 metal primer, ASTEC WPM #9, ASTEC #900 ceramic finish coat.

Page 1-65

Page 67: Astec Metal Roof Projects

Client:Oshkosh B'GoshByrdstown, TNClothing Manufacturer

Dealer:A & J Superior Coatings, Inc.

Project:26,466 sq. ft. R-Panel Metal Roof

ASTEC B-16-7 I metal primerASTEC WPM #9 waterproof membraneASTEC #900 ceramic finish coat

em. Ir

---_..-.-

-i.

-.

Page 1-66

Page 68: Astec Metal Roof Projects

Client:L & N Safety GlassCalexico, CAMexicali, MX

Dealer:Arizona Insulation Specialist

Project:220,000 sq.ft. Metal Roof

Desert heat, extreme thermal shock, mis-matched panel configuration.

Page 1-67

Page 69: Astec Metal Roof Projects

L & N Safety Glass page 2

Urethane foam was usedto fill voids prior toapplication of the ASTECwaterproof system.

Page 1-68

Page 70: Astec Metal Roof Projects

L&N Safety Glass page 3

Hundreds of protrusions, vents, pipes.

Full prime with ASTEC 8-16-71

ASTEC WPM #9 waterproof membrane

Page 1-69

Page 71: Astec Metal Roof Projects

L & N Safety Glass page 4

Thousands of patches were done with WPM#9 waterproof membrane and polyester cloth.

Finish coated with ASTEC #900 ceramic acryliccoating.

Project completed: April 1994

10 year material and labor warranty

Page 1-70

Page 72: Astec Metal Roof Projects

Client:Cameco IndustriesThibodeaux, LA

Project:125,000 sq ft Metal Roof100% Rust

ASTEC B-16-71 corrosion primer

ASTEC WPM #9 waterproof membrane

Fasteners Side and end lap seams

Page 73: Astec Metal Roof Projects

Cameco Industries page -2-

Treatment: Fiberglass Skylight

ASTEC WPM 9 waterproof membrane wasembedded with polyester cloth reinforcement.

ASTEC #2541 skylight sealer was applied

* Panel fatigue * New metal repair * ASTEC “dry in”

Preparation phase completed

Page 74: Astec Metal Roof Projects

Cameco Industries page –3-

ASTEC WPM #9 waterproof membrane was

applied to all horizontal end lap seams and all vertical side lap seams.

Page 75: Astec Metal Roof Projects

Client: Dealer:Thomaston Mills, Thermal Control Coatings, Inc.Warehouse #10Thomaston, GA45,000 sq ft Metal Roof

Thermal Control Coatings, Inc.

This project has heavy tar patches, chalky surfaceand full rust prime with AstecB-16-71

Metal break patch and repair

Sealing of vent stacks allowing positive water flow.

ASTEC WPM #9 waterproof membrane

Page 76: Astec Metal Roof Projects

Thomaston Mills page -2-

Boxed skylight: ponding water with brittle-to-cracked tar base materials.

Created a wedged slope by filling in between the panel corrugations, then sealed with ASTECWPM #9 waterproof membrane thus providing a cricket which allowed positive water flow.

The ASTEC system negated the need for a tear off and replacement of a new metal panel system.

Page 77: Astec Metal Roof Projects

Thomaston Mills page -3-

This metal deck had a very chalky surface withrust bleed-through over the entire roof area.

Project completed: December 1995 ASTEC #900 ceramic acrylic finish coat

Page 78: Astec Metal Roof Projects

Project: Atlantic Airlines Dealer: Florida Exterior Coatings Lakeland, Florida Date: 2001

HANGER ROOF TEMPERATURE DROPS 66 DEGREES Atlantic Airlines is a charter service serving the U.S. East Coast with plans to add a few

seventeen-passenger planes. When Atlantic Airlines Pres. Mark Blanton bought another hanger in Lakeland, Florida he noticed a few roof leaks while remodeling the building. During this same time he received an Astec mailer and called ICC for more information. ICC sent out an information packet and the inquiry was forwarded to Florida Exterior Coatings, the Astec Dealer for that area. Kevin Guenther, owner of Florida Exterior Coatings, met with Mr. Blanton and detailed all the benefits of the Astec system including the insulating and heat reduction properties. “This was exactly what I was looking for”, Mr. Blanton said.

Mr. Blanton said the work was completed on a Saturday and you could tell an immediate

difference in temperature. Also, the project had generated a lot of interest around the airport. Mr. Blanton went on to say, “The next morning (Sunday) thirteen people came over to look at the job and all were very skeptical of the claims concerning heat reduction. That particular day we had a temperature on the concrete pad in front of the hanger of 107 degrees with no breeze. One of the gentlemen came equipped with a magnetic digital temperature gauge and proceeded to attach it to the underside of the roof of an adjoining hanger. The gauge read 164 degrees. We all anxiously waited while he entered my hanger and attached the unit to my roof. He then detached it, wiped it clean, reset the gauge and re-attached it. He looked down and said, ‘ you’re not going to believe this’. The temperature on the underside of my roof was 98 degrees. That is a difference of 66 degrees on adjoining hangers.” Mr. Blanton has plans to build another six hanger complex alongside the present hanger and said he will stipulate Astec coatings for the roof and sidewalls. Along with the superior waterproofing benefit, he said he also considers the thermal heat reduction a safety factor. “ If you can keep your mechanic comfortable, he might spend just a little more time on a repair or maintenance project if he doesn’t have sweat running in his eyes”.

Page 79: Astec Metal Roof Projects