Advanced Well Construction Techniques Utilizing Solid Expandable Technologies (SET®)
Extreme Stents for Oil & Gas wells
Pumps & Pipes 1 12 Nov 2007
Mark HollandNA Sales Mgr
Overview
• Intro • Expandable casing statistics• Case Histories• What’s new
On January 10, 1901 the famous Lucas Gusher blew in. Oil sprayed over 100 feet above the derrick for nine days until the well was capped.
Conventional Well Design
Several to many casing strings in a “tapered”
configuration
Each one decreases “diametric efficiency” by
~20%
What and Where is Solid Expandable Technology? (SET®)
Operating Envelope for Expandable Casing
Inclination: 100o from vertical
Temperature: 400o F
Mud Weight: 19.8# / gallon
Depth: 28,750 ft
Hydrostatic: 23,300 psi
Length: 6, 867 ft
Cumulative Installation Footage
As of November 10, 2007798 Installations
100,000
200,000
300,000
400,000
500,000
600,000
700,000
No
v-9
9
Ma
r-0
0
Au
g-0
0
Ja
n-0
1
Ju
n-0
1
No
v-0
1
Ap
r-0
2
Se
p-0
2
Fe
b-0
3
Ju
l-0
3
De
c-0
3
Ma
y-0
4
Oc
t-0
4
Ma
r-0
5
Au
g-0
5
De
c-0
5
Ma
y-0
6
Oc
t-0
6
Ma
r-0
7
Len
gth
(in
fee
t) 238,535 m775,120 ft
775,000 ft equals …
Traveling from Houston to Goliad
Opportunity vs. Need
9-5/8"
7-5/8"
Decision Point
Hole Size Preservation
Hole Size Survival
Opportunity
Need
Economics
Reduced drilling time from 140 to 48 days
Opportunity (planned)
Need (contingency)
Planned Expandable Key OffsetsM
easu
red
De
pth
3000
7000
11000
15000
19000
23000
27000
TechLimit
Case Histories
HPHT Well – Deep Shelf GOM
UD High Pressure – DW GOM
HP/HT Well in GOM – 20’ Water Depth
Trouble ZoneMajor pressure regression - Losses
SolutionInstalled 9-5/8" x 11-3/4" expandable
ValueDrilled and evaluated virgin formation with sufficient hole size
High Pressure Well in GOM – 3400’ Water Depth
Trouble Zone Low Margin Drilling in a
DW GOM wellSolution
Installed 7-5/8” x 9-3/8”Preserve hole size to TD
ValueDrilled and evaluated new formations in a frontier environment
MonoDiameter™ and What is it?
The industry demands it: More challenging drilling environments Current available technology is limited Improved ROI Advanced well construction
MonoDiameter™ Defined
Provide successive uniform ID over multiple liners
MonoDiameter™10.4" ID
Successful Field Appraisal Well
Enventure was operator Safely completed drilling
program Followed standard
operating procedures Well information
Drilled in Oklahoma Real-life well Completed April 2007
Successful installation First of its kind Continuation possible
DNV Certification
Conclusions – What does this mean to us all?
ERD applications “One size fits all” Reduces the Carbon
Footprint of Drilling Ops Drill a more efficient well
Less cuttings, mud, cement, steel, rig size, etc
Is there a “Depth Limit”?