Upload
ibm-rational
View
666
Download
2
Tags:
Embed Size (px)
DESCRIPTION
Series Name: System Development Webcast Title: Change/Configuration and Collaboration - RTC Date: 6.18.2013 Presenter: Rolf Nelson
Citation preview
Rational Team Concert for Systems and Software Development
Rolf NelsonIBM [email protected]
June 18, 2013
© 2012 IBM Corporation2
IBM Systems and Software Symposium – February 2013
Agenda
Quick overview of Rational Team Concert
Strategic direction with regard to Systems development
Highlights from recent releases, focus on Systems
Enhancing your current CCM environment with Team Concert
2013 priorities
© 2012 IBM Corporation3
IBM Systems and Software Symposium – February 2013
Be lean at scale. Work together. Deliver quality results.
Process your way – Scrum, waterfall or hybrid; adapt planning to meet your team needs and rhythm.
Friction free communication by smart linking of tasks, code changes, builds and releases as you work
Transparency through live dashboards - write code not status reports – live web based dashboards tell everyone the story
Empower developers - Juggle tasks, patch in seconds, easily add or remove features as required to meet business needs
Runs anywhere – open platform Works with your existing tools and data for incremental adoption
Agile Formal
© 2012 IBM Corporation4
IBM Systems and Software Symposium – February 2013
Team advisor for defining / refining “rules” and enabling continuous improvement
Process enactment and enforcement In-context collaboration enables team members
to communicate in context of their work
Single structure for project related artifacts World-class team on-boarding / offboarding
including team membership, sub-teams and project inheritance
Role-based operational control for flexible definition of process and capabilities
Jazz Team Server
Component based SCM enables reuse across projects
Change set based for easy addition or removal of features
Server-based sandboxes
SCM Work Items
Defects, enhancements and conversations
View and share query results Support for approvals and
discussions Query editor interface
Automated Work item and change set traceability
Build definitions for team and personal builds
Local or remote build servers Multi-level continuous
integration
Build
PlanningIntegrated release/iteration planningEffort estimation & progress tracking taskboards Out of the box process templates: formal or agile
Project Transparency Customizable web based dashboards Real time metrics and reports Project milestone tracking and status
Rational Team Concert functionality
© 2012 IBM Corporation5
IBM Systems and Software Symposium – February 2013
Dynamic planning with multiple views
5
• Provide both traditional and agile views on the same plan
Taskboard
Gantt/Roadmaps
Support any planning method Enable success w/ transparency
© 2012 IBM Corporation6
IBM Systems and Software Symposium – February 2013
Add process improvement – Scrum, waterfall, …Making process executable and repeatable
ProcessArchitect
Variant #1
Step 1: Customize
Step 2: Enact
Variant #2
Variant #3
ProjectManager
Scrum
Waterfall
Iterative
Project C
WaterfallAnalyst Release
EngineerDeveloper QualityProfessional
Project B
Analyst ReleaseEngineerDeveloper Quality
Professional
Project A
Product Owner Scrum Master Team Member
Agile
Iterative
For
mal
pro
ject
mgt
tem
plat
eS
crum
agi
le t
empl
ate
© 2012 IBM Corporation7
IBM Systems and Software Symposium – February 2013
Provide transparency and automated status for everyoneEvery stakeholder knows project status without having to ask
© 2012 IBM Corporation8
IBM Systems and Software Symposium – February 2013
Improve team collaboration across silos
8
• Silo’d teams; disconnected data
• Important discussions are lost to email -project records are missing the “real reason” for decisions
• Unified team shares linked data
• ALM environment tracks what is important for delivering
• “Am I blocking others”
• “Are others waiting for my approval”
www
Every artifact is a web link. Traceability is automated as you perform work. Empower teams and provide flexibility to utilize resources from anywhere.
© 2012 IBM Corporation9
IBM Systems and Software Symposium – February 2013
Strategic Direction
© 2012 IBM Corporation10
IBM Systems and Software Symposium – February 2013
Rational Addresses Two Key Market Segments - Systems and IT
Complex and Embedded Systems
Software and systems engineering and lifecycle mgt for products and complex systems• WW shipment leader in 3 categories; Embedded requirements #1, modeling #1, and testing #3• Grew ecosystem of partners, eg new ISV solutions +34% yty• Strategic alliances for adjacent market reach & industry solutions: National Instruments for HW/SW
test integration; Siemens PLM for integrated product development
AcceleratingProductand ServiceInnovationApplication Lifecycle
Management (ALM) Software application lifecycle mgt, multiplatform development and modernization for IT
applications• #1 market share in Application Development and Lifecycle Management Software (11
consecutive years, Gartner) • User’s Choice Award in software development platforms for the last 5 years (Evans Data)• 7 category leader/visionary recognitions by analysts• Expanded open, standards-based lifecycle platform via OSLC specs and workgroups• Grew community and user base to of Jazz.net members +45% yty
& Enterprise Modernization (EM)
© 2012 IBM Corporation11
IBM Systems and Software Symposium – February 2013
Trends: Development Complexity and Delivery Cycles are Increasing
Heterogeneous Environments
Public CloudPrivate Cloud
Data Warehouse MainframeEnterprise
Service Bus
Directory Identity
File systems
Collaboration
Web/Internet
Routing Service
Third-partyServices Portals
ContentProviders EJB
SharedServicesArchives
Business Partners
Messaging Services
Product and application complexity and size
are increasing
Development delivery is more rapid, with impacts to how we test and release.
Increasing Development Complexity
IncreasingDelivery Cycles
© 2012 IBM Corporation12
IBM Systems and Software Symposium – February 2013
Rational Team Concert for Systems
Focus on meeting the needs of Systems clients
High rigor
– Rigorous specifications and intensive testing
– Safety critical or expensive to fix failures
– Security and compliance
High variance
– Complex component-based development
– Extensive reuse
– Variant management
– Product lines
Software and systems engineering and lifecycle management for products and complex systems
© 2012 IBM Corporation13
IBM Systems and Software Symposium – February 2013
Highlights from Rational Team Concert 4.0 – June 2012
© 2012 IBM Corporation14
IBM Systems and Software Symposium – February 2013
Highlights from Rational Team Concert 4.0 – June 2012
Improved planning
Cross-project planning
– New plan type: Cross Project Plan
– New type of link: Work item can track other work items
– Roll up the schedule across projects
Kanban task board visualization support
– Visualize the flow of work through the process
– Easily see bottlenecks and inefficiencies
© 2012 IBM Corporation15
IBM Systems and Software Symposium – February 2013
Highlights from Rational Team Concert 4.0 – June 2012
Compliance and Security
Finer grained security control
– Define roles with specific capabilities
SCM read permissions and IP security
– Ability to set SCM read permissions at the file/folder level
– Delete file contents from source control
CLI support for compliance audit
– Extract BOM and content
© 2012 IBM Corporation16
IBM Systems and Software Symposium – February 2013
Highlights from Rational Team Concert 4.0 – June 2012
Variant management Managing deliveries to many streams
Find which release streams contain a set of changes
Select change sets you want to search for
Select streams you want to search
© 2012 IBM Corporation17
IBM Systems and Software Symposium – February 2013
Highlights from Rational Team Concert 4.0 – June 2012
Usability and flexibility – users can work where they are comfortable
New! Windows 7 Explorer integration
– Simple file menus for versioning and locking
– Icons show version status
– Good for users who don’t need Eclipse or Visual Studio
New! Microsoft Source Code Control Interface (MSCCI) interface
– Integrate with Rhapsody, Matlab Simulink
Integrated with Rational Engineering Lifecycle Manager (RELM)
– Visualize, navigate, and query on work items and their relationships
Improved CLI for scripting and automation
© 2012 IBM Corporation18
IBM Systems and Software Symposium – February 2013
Highlights from Rational Team Concert 4.0 – June 2012
Enterprise scalability
High availability with clustering (WAS-ND)
N-1 Client compatibility
– Supports incremental adoption of new releases
– Upgrade the server first
– Teams can upgrade their clients at their pace
Ability to rename a server URL and update the links
© 2012 IBM Corporation19
IBM Systems and Software Symposium – February 2013
Highlights: Rational Team Concert 4.0.1 - November 2012
© 2012 IBM Corporation20
IBM Systems and Software Symposium – February 2013
IBM Rational Team Concert v4.0.1 Highlights - November 2012
Improved performance and usability - Up to 25% faster plan rendering; And new auto-scrolling support
Process sharing and customization - Inherit process across projects and add local project customizations
Better support for code reviews – View cumulative file changes in a feature – Change Summary view
Extended platform support – Mac OS X clients, Visual Studio 2012 IDE, and Chrome browser
Rational LifeCycle Adaptors – Integrate w/ HPQC, Git, Jira, Visual Studio Team System and more!
© 2012 IBM Corporation21
IBM Systems and Software Symposium – February 2013
Rational Team Concert 4.0.1
Usability and Getting Started Display plans up to 25% faster Working with large
plans now render faster
Up to 25% faster than 4.0 release
Auto-scrolling for plans makes it easier to move work items across plans
New zip install for RTC standalone installs Gets you up and running with RTC faster, with smaller footprint
Need to install just RTC?
Just download the zip install
Usability and Getting Started Display plans up to 25% faster Working with large
plans now render faster
Up to 25% faster than 4.0 release
Auto-scrolling for plans makes it easier to move work items across plans
New zip install for RTC standalone installs Gets you up and running with RTC faster, with smaller footprint
Need to install just RTC?
Just download the zip install
201320122011
© 2012 IBM Corporation22
IBM Systems and Software Symposium – February 2013
Rational Team Concert 4.0.1
Process Sharing and Customization Allows project areas to extend a shared process
without cutting off inheritance from the parent.
Project areas can now define configuration deltas to a shared work item configuration.
Initial customizations supported
Adding a new attribute to a work item type and adding that attribute to the work item editor for that type
Adding a new literal to an existing enumeration
Adding a new enumeration type
Process Sharing and Customization Allows project areas to extend a shared process
without cutting off inheritance from the parent.
Project areas can now define configuration deltas to a shared work item configuration.
Initial customizations supported
Adding a new attribute to a work item type and adding that attribute to the work item editor for that type
Adding a new literal to an existing enumeration
Adding a new enumeration type
201320122011
“We are maintaining a common process template for all projects, however many project owners have requested minor process changes to their projects.”
“We are maintaining a common process template for all projects, however many project owners have requested minor process changes to their projects.”
© 2012 IBM Corporation23
IBM Systems and Software Symposium – February 2013
Rational Team Concert 4.0.1
Code Reviews and Audits New Change Summary view
Makes code reviews easier
Details pane
Shows cumulative file changes in a feature
Dependency graph can help identify errors
Code Reviews and Audits New Change Summary view
Makes code reviews easier
Details pane
Shows cumulative file changes in a feature
Dependency graph can help identify errors
201320122011
© 2012 IBM Corporation24
IBM Systems and Software Symposium – February 2013
Rational Team Concert 4.0.1
Automate more – New SCM CLI commands View and update workspace properties such as name, owned
by, visibility and description
View and update workspace flow targets
Component properties such as name, owned by and visibility can be viewed and updated
View and update baseline and snapshot properties
Diff the state of artifacts in a snapshot with their state in a workspace, stream, or another snapshot
Diff the state of artifacts in a baseline with their state in a component, contained in a workspace, stream, or snapshot; or another baseline
Display property differences
Scope diff by component
Automate more – New SCM CLI commands View and update workspace properties such as name, owned
by, visibility and description
View and update workspace flow targets
Component properties such as name, owned by and visibility can be viewed and updated
View and update baseline and snapshot properties
Diff the state of artifacts in a snapshot with their state in a workspace, stream, or another snapshot
Diff the state of artifacts in a baseline with their state in a component, contained in a workspace, stream, or snapshot; or another baseline
Display property differences
Scope diff by component
201320122011
© 2012 IBM Corporation25
IBM Systems and Software Symposium – February 2013
Introducing the Rational Lifecycle Integration Adapters
Both Editions have IBM Rational branding and work with RTC/CLM 4.0 and 4.0.1
Both Editions are sold through standard IBM sales channels
Both Editions are supported by standard IBM customer support channels
Available 11/27/12Available 11/27/12Available 10/12/12Available 10/12/12
Standard EditionStandard Edition Tasktop EditionTasktop Edition
© 2012 IBM Corporation26
IBM Systems and Software Symposium – February 2013
Open Lifecycle Integration and Services Management Platform
IBM Rational Team Concert v4.0.3
Deliver faster with improved performance
– Load plans in the web UI up to 50% faster
Focus on developer productivity
– Rank plans simpler and faster with explicit ranking options
– New customizable developer view across all projects for Visual Studio developers. Track my to do list and approvals
Report and act on more data
– Out of the box reports to track time spent
– Ability to report on approval descriptions and complex attributes such as team structure, components and iterations
Get started quicker than ever– New Jenkins plug-in with traceability to Rational Team
Concert work items and SCM to allow faster adoption without having to change your existing build tooling.
– Easier importing of ClearCase data with support for multi-branch, multi-baseline version history.
Build better software and products with an all-in-one development environment
Rational Team Concert
“Plans load much faster, ranking is simpler and now I can expand our adoption of Rational Team Concert to teams using Jenkins”
Development Team Lead
DRAFT: IBM Confidential Until June 2, 201326
AgileFormal
© 2012 IBM Corporation
Software and Systems Engineering | Rational
Rational Team Concert 4.0.3 Performance
Performance: User Productivity
SCM command line:
10% boost in CLI execution
Plan loading performance: Phase II
In RTC 4.0.1 we improved performance by 25%
In RTC 4.0.3 plan loading uses a new “pay as you go” model and other optimizations that improve performance by up to 40 to 50 percent. For example, the Rational Team Concert product backlog now loads in 10 seconds, compared to 20 seconds in 4.0.3 M3, over a network latency shown in the image above using browser Mozilla Firefox 17.0.5.
Pay as you go: When we load a plan, not all plan view data is loaded until you ask for it.
Parallelize requests: Parallel requests when loading data rather than sequential requests
201320122011
© 2012 IBM Corporation
Software and Systems Engineering | Rational
Rational Team Concert 4.0.3: Usability
Usability: Simple and fast agile ranking
Simplify ranking (218174)
Today:
We support automated stack based ranking in backlogs, which can sometimes lead to ranking gaps during drag operations.
Now we allow more explicit control over ranking.
New explicit actions to assign row numbers as rank numbers
Make the rank number manually editable
Improve drag and drop behavior
Make it much faster to rank order a large backlog and maintain consecutive rank when using drag and drop.
Usability: Simple and fast agile ranking
Simplify ranking (218174)
Today:
We support automated stack based ranking in backlogs, which can sometimes lead to ranking gaps during drag operations.
Now we allow more explicit control over ranking.
New explicit actions to assign row numbers as rank numbers
Make the rank number manually editable
Improve drag and drop behavior
Make it much faster to rank order a large backlog and maintain consecutive rank when using drag and drop.
201320122011
© 2012 IBM Corporation
Software and Systems Engineering | Rational
RTC 4.0.3 : Apply Rank Action Examples
“I’ve got the plan ordered the way I want. One click to apply rank across the plan”
“I’ve moved a group of lower priority tasks
to the bottom of the backlog, apply an ordered
rank below, from my current selected task”
201320122011
© 2012 IBM Corporation
Software and Systems Engineering | Rational
201320122011
Rational Team Concert 4.0.3 : Usability
Usability: Visual Studio Developers see all their work
organized in one place
[CCM] As a user make it easy for me to see what I'm working on, in the VS Client (227379)
We improved the current “My Dashboard” UI to make it very easy for a developer to see:
Current Work - my to do list of work items in the current iteration
Future Work - my to do list of work items grouped by future iterations
Pending Approvals – my work items owned by me in “pending” approval state
Pending Requests - All work items that require my approval
User customization of these views (sort order, bar charts, rich hovers)
See work across multiple Visual Studio projects.
Usability: Visual Studio Developers see all their work
organized in one place
[CCM] As a user make it easy for me to see what I'm working on, in the VS Client (227379)
We improved the current “My Dashboard” UI to make it very easy for a developer to see:
Current Work - my to do list of work items in the current iteration
Future Work - my to do list of work items grouped by future iterations
Pending Approvals – my work items owned by me in “pending” approval state
Pending Requests - All work items that require my approval
User customization of these views (sort order, bar charts, rich hovers)
See work across multiple Visual Studio projects.
© 2012 IBM Corporation
Software and Systems Engineering | Rational
Rational Team Concert 3.x and 4.x – New Jenkins OSS plug-in. Available from the Jenkins plug-in site.
Incremental Adoption: New Jenkins plug-in Installs into Jenkins as a Jenkins plug-in, not shipped with the RTC
product
Runs SCM phase of a Jenkins build when you’re using RTC SCM
Supports integration at both SCM level and Build level with traceability from RTC build result.
Works with multiple versions of RTC (RTC 3.0.1.5 and 4.x and later)
Benefits:
Simpler to set up – provides incremental adoption of RTC
Automatically creates an RTC build result for you
Provides traceability to build workspace, snapshot, SCM changes link and “included in build” work item links
Leverage other Jenkins plug-ins / ecosystem
More details about obtaining the plug-in see our wiki page:
https://wiki.jenkins-ci.org/display/JENKINS/Team+Concert+Plugin
Incremental Adoption: New Jenkins plug-in Installs into Jenkins as a Jenkins plug-in, not shipped with the RTC
product
Runs SCM phase of a Jenkins build when you’re using RTC SCM
Supports integration at both SCM level and Build level with traceability from RTC build result.
Works with multiple versions of RTC (RTC 3.0.1.5 and 4.x and later)
Benefits:
Simpler to set up – provides incremental adoption of RTC
Automatically creates an RTC build result for you
Provides traceability to build workspace, snapshot, SCM changes link and “included in build” work item links
Leverage other Jenkins plug-ins / ecosystem
More details about obtaining the plug-in see our wiki page:
https://wiki.jenkins-ci.org/display/JENKINS/Team+Concert+Plugin
201320122011
© 2012 IBM Corporation
Software and Systems Engineering | Rational
New Jenkins plug-in for Rational Team Concert
After the SCM phase has run, the build change log captures:
SCM change sets and snapshot, with links to associated work items
201320122011
© 2012 IBM Corporation
Software and Systems Engineering | Rational
RTC 4.0.3 Plans : Enhanced ClearCase Importer
ClearCase Multi-branch Importer Improvements
Import baselines for multiple related releases or branches
– Must import streams in dependency order
Baselines are created in RTC automatically
– Now the version trees of imported files are comparable across ClearCase and RTC
Main line R8.0
R7 branch
R7.x
R6 branch
R6.x
201320122011
© 2012 IBM Corporation
Software and Systems Engineering | Rational
RTC 4.0.3 Plans - Reporting
Regulatory Reporting: Report on Time Spent, approval descriptors and Modified By custom attributes
[CCM] Improve ability to report on time spent / lean metrics (213855)
[CCM] Make complex custom work item attributes, approval descriptors and Modified By data reportable and available in the data warehouse (242806)
Data collected in time sheets (via time tracking) can be reported on using RPE
– Time sheet data has a REST interface (4.0.1) for RPE
– Time sheet data is available for live reporting using BIRT reports
New out of the box timesheet reports
201320122011
© 2012 IBM Corporation
Software and Systems Engineering | Rational
Details: New Approvals and Attribute Data Available for Reporting
ETL for "modified by" data
RICALM.REQUEST_HISTORY (Field: MODIFIER_ID)
ETL for approvals and approval descriptors
RICALM.REQUEST_APPROVAL_STATE
RICALM.REQUEST_APPROVAL_TYPE
RICALM.REQUEST_APPROVAL
RICALM.REQUEST_APPROVAL_DESCRIPTOR
ETL for complex custom attributes
The complex custom attributes data is now loaded into the data warehouse. The data includes complex custom attributes of these types: Category, Contributor, Deliverable, Item, Iteration, Process Area, Project Area, Team Area, Timeline, Work Item, and SCM Component.
RICALM.REQUEST_COMPONENT_EXT
RICALM.REQUEST_CATEGORY_EXT
RICALM.REQUEST_RESOURCE_EXT
RICALM.REQUEST_RELEASE_EXT
RICALM.REQUEST_ITERATION_EXT
RICALM.REQUEST_PROJECT_EXT
RICALM.REQUEST_TEAM_EXT
35 IBM Confidential
© 2012 IBM Corporation
Software and Systems Engineering | Rational
Improved Process Permissions Configuration – Web UI
The contents of the Permissions tab were replaced with a new Permissions editor. Features include merging of project and team permissions, inheritance of permissions from the parent when customizing, filtering by operation name, and visibility of roles and time periods configured
36
201320122011
© 2012 IBM Corporation
Software and Systems Engineering | Rational
Process Area History
History tab in the web UI, shows the history for project and team areas: who made each change, when it was made, and what was changed.
UI details what’s currently included (membership, roles, iterations, process xml)
37
201320122011
© 2012 IBM Corporation
Software and Systems Engineering | Rational
Process Guidance in Work Items
38
201320122011
© 2012 IBM Corporation
Software and Systems Engineering | Rational
RTC 4.0.3 Plans – Complex Cross Project Plans
Increased hierarchy levels for drill down
– Previously cross-project plans displayed a single hierarchy level. Now, they support multiple hierarchy levels for items that are tracked in the plan. The level is configurable.
201320122011
© 2012 IBM Corporation
Software and Systems Engineering | Rational
RTC 4.0.3 Plans – Complex Cross Project Plans
Cross-project plans support three new plan checks for items that are tracked in a plan.
– Visual warnings are displayed when the following situations occur:
• The rolled-up schedule for an item in the plan exceeds the end date of the iteration that the plan is associated with.
• The "planned for" date of a plan item exceeds the plan's iteration end date.
• The rolled-up schedule for an item in the plan exceeds the due date that is specified for the item.
Colorizers and filters now support date expressions
– To highlight or hide items in the plan by date
201320122011
© 2012 IBM Corporation41
IBM Systems and Software Symposium – February 2013
Enhance your CCM environment with Team Concert
© 2012 IBM Corporation42
IBM Systems and Software Symposium – February 2013
Team ConcertState of the art collaborative development
solution
Goes beyond traditional CCMState-of-the-art collaborative
development platformIntegration hub with Jazz OSLCOne product with integrated CM
and SCM + planning, build and reporting
Designed for web and high performance over WAN’s
Easier to use and low administration Ideal for Agile developmentScalable from small to large globally
distributed teamsCan also “surround” other SCM’s:
Subversion, Git, ClearCase, SynergyCM functionality available separately
How do you get the most out of your CCM investment?
ClearCase / ClearQuest
Very large scale enterprise
development solutions
Build on your current investments to realize a collaborative change and configuration management solution
Build on your current investments to realize a collaborative change and configuration management solution
Very large development projectsVery complex and customized
workflowsBuild auditing and optimized build
avoidanceTwo products: ClearCase (SCM),
ClearQuest (CM)Stringent compliance requirements
(eg CMMi, SPICE) Complex requirements
management through DOORS integration
Specialized systems software development
Two products: Synergy (SCM), Change (CM)
Synergy / ChangeStringent compliance requirements for very specialized systems
development
© 2012 IBM Corporation43
IBM Systems and Software Symposium – February 2013
Jazz is… A scalable, extensible team collaboration platform
A community at Jazz.net, where you can see Jazz-based products built in the open
An open architecture for lifecycle integration (OSLC - www.open-services.net)
Co-existence: Unifying Rational CCM product usageEnabled by Jazz: an open platform with a shared set of services
ClearCase & ClearQuest Synergy &
ChangeBuild Forge
3rd-PartyJazz
Capabilities
FutureIBM
Capabilities
StorageCollaboration
QueryDiscovery
Administration: Users, projects,
process
Best Practice Processes
Presentation:Mashups
Requisite Pro
& DOORS
HP Quality CenterSubversion
Co-existence... Enables teams to reuse enterprise
assets, process and investment in ClearCase/ClearQuest or Synergy/Change
Leverage new Collaborative Lifecycle Management in an evolutionary way with lower business risk
Use the “right-sized” governance solution for different project needs. Teams can collaborate and exchange Change Requests and Code
© 2012 IBM Corporation44
IBM Systems and Software Symposium – February 2013
2013 Directions for Rational Team Concert
© 2012 IBM Corporation45
IBM Systems and Software Symposium – February 2013
Follow Systems priorities in the RTC backlog on Jazz.net
Monitor progress here:https://jazz.net/jazz/web/projects/Rational%20Team%20Concert#action=com.ibm.team.apt.viewPlan&page=com.ibm.team.apt.web.ui.plannedItems&id=_vbiXZqC5EeCGUsd9CqIfuw&planMode=com.ibm.team.apt.viewmodes.internal.productBacklog.ranking
© 2012 IBM Corporation46
IBM Systems and Software Symposium – February 2013
www.ibm.com/software/rational
© 2012 IBM Corporation47
IBM Systems and Software Symposium – February 2013
Acknowledgements and Disclaimers:
© Copyright IBM Corporation 2012. All rights reserved.
– U.S. Government Users Restricted Rights - Use, duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp.
IBM, the IBM logo, ibm.com, Rational, the Rational logo, Telelogic, the Telelogic logo, Green Hat, the Green Hat logo, and other IBM products and services are trademarks or registered trademarks of International Business Machines Corporation in the United States, other countries, or both. If these and other IBM trademarked terms are marked on their first occurrence in this information with a trademark symbol (® or ™), these symbols indicate U.S. registered or common law trademarks owned by IBM at the time this information was published. Such trademarks may also be registered or common law trademarks in other countries. A current list of IBM trademarks is available on the Web at “Copyright and trademark information” at www.ibm.com/legal/copytrade.shtml
Other company, product, or service names may be trademarks or service marks of others.
Availability. References in this presentation to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates.
The workshops, sessions and materials have been prepared by IBM or the session speakers and reflect their own views. They are provided for informational purposes only, and are neither intended to, nor shall have the effect of being, legal or other guidance or advice to any participant. While efforts were made to verify the completeness and accuracy of the information contained in this presentation, it is provided AS-IS without warranty of any kind, express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, this presentation or any other materials. Nothing contained in this presentation is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software.
All customer examples described are presented as illustrations of how those customers have used IBM products and the results they may have achieved. Actual environmental costs and performance characteristics may vary by customer. Nothing contained in these materials is intended to, nor shall have the effect of, stating or implying that any activities undertaken by you will result in any specific sales, revenue growth or other results.
© 2012 IBM Corporation48
IBM Systems and Software Symposium – February 2013
© Copyright IBM Corporation 2012. All rights reserved. The information contained in these materials is provided for informational purposes only, and is provided AS IS without warranty of any kind, express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, these materials. Nothing contained in these materials is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software. References in these materials to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities referenced in these materials may change at any time at IBM’s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature availability in any way. IBM, the IBM logo, Rational, the Rational logo, Telelogic, the Telelogic logo, and other IBM products and services are trademarks of the International Business Machines Corporation, in the United States, other countries or both. Other company, product, or service names may be trademarks or service marks of others.
www.ibm.com/software/rational