Upload
imgs
View
28
Download
1
Tags:
Embed Size (px)
Citation preview
Prime2 – Object Orientated Database
Prime1 Ecommerce Supply System - no longer updated
Updated Prime1 needs to be reengineered from Prime2
Approaches:
1. Converting Prime2 to a Prime1 GFO (automatic)
2. Writing from the Prime2 Oracle database to our current Prime1 EcommSupply Oracle database (automatic)
3. Extracting Prime2 updates, out putting to GFO format to enable Graphic Operators to update Prime1. (manual)
Why?
Differences in Oracle Flowline
Prime2 to Prime1Prime 1
Building with Canopy Building with Canopy
FENCE_PKFENCE_PK
Project Aim: Update 2000+ new buildings and immediate environs from the Prime2 Database
Workbench Aim: Create a Prime2toPrime1 GFO for Graphics Operators
Process: Graphic Operators open the Prime2toPrime1.gfo and the original Prime1 and manually digitise the updates from the Prime2toPrime1 data to the Prime1 file.
Workbench Outputs:
Prime2 to Prime1 GFO
Prime2 Tiff
PNG of Intersecting Map Sheets
Prime2 to a Prime1 GFO and Manual Graphics
FeatureReader
gms_job_id in (select id from smsplan.job start with id in (select id from smsplan.job start with id = @Value(ID) connect by prior parent = id) connect by prior id = parent)
Workbench Outputs for Graphic Operator:
Prime2toPrime1.gfo Prime2 Tiff PNG of Intersecting Map Sheets
Manual Workflow
Graphic OperatorsQuality Assessor
Job Planners10 Staff Members
Prime1 Supply SystemManage the Prime1 Updated Map
Future FME Team Projects
MRDS – Multi Resolution Data Store
- Generation of Product
- Validation of Third Party Data
Create Prime2 Supply Workbenches from MRDS
- Oracle, Post-Gis, SQL Server
- DXF, DWG, TAB, FGDB…..