30
Architecture Through Precast Technology Group

VME Group and Precast Technology Products

  • View
    502

  • Download
    2

Tags:

Embed Size (px)

DESCRIPTION

About VME group achievements and their precast products

Citation preview

Page 1: VME Group and Precast Technology Products

Architecture Through Precast Technology

Group

Page 2: VME Group and Precast Technology Products

VME through the years

1986

• VME Group was founded

• One of the pioneers in mechanization of earthwork using excavators and other sophisticated equipment

Page 3: VME Group and Precast Technology Products

1992

• Ventured into building bridges for the Tamil Nadu State Highways based on Precast Technology

• Won an accolade from World Bank team for quality and also speedy execution for the very first bridge

Page 4: VME Group and Precast Technology Products

1998• A bow string girder bridge at

Katpadi for Southern Railways which won a National Award by the Indian Institute of Bridge Engineers

• Entire span of 42 meters weighing 750 tons was cast separately and placed in position

Page 5: VME Group and Precast Technology Products

2008

• Set up India’s First Completely Automated Precast Factory along with global associates VaBe and Elematic of Finland

Page 6: VME Group and Precast Technology Products

2010

• Diversified into Real Estate domain with VME Realty

• Launched its First Project – Lakeside in August 2010 for which the entire construction is done using precast technology

Page 7: VME Group and Precast Technology Products

The group has over the last 25 years focused on planning, execution and transfer of specialized projects in the field of construction like road over bridges, railway bridges and

other prestigious highway projects

Page 8: VME Group and Precast Technology Products

Award Winning Project – Most Outstanding Bridge

ROB at Katpadi RailwayJunction for Southern Railway – Each Bowstring Girder of 42m span weighing 750 tons

were cast and placed in position

Page 9: VME Group and Precast Technology Products

Testimonies that have stood the

test of time Ekkaduthangal – Bridge across Adyar River, Chennai

84 Precast prestressed beams were cast and placed in just 3 months in the year 1992

Page 10: VME Group and Precast Technology Products

Moorad Bridge – Railway Bridge in the back waters of Kerala

Specific sacrificial caisson were used for Well foundation and each well weighing 300Mt were placed in position after casting for the first time in Southern Railway

Page 11: VME Group and Precast Technology Products

VME Precast

Products

Page 12: VME Group and Precast Technology Products

Product 1

Page 13: VME Group and Precast Technology Products

Hollow Core Slabs

Page 14: VME Group and Precast Technology Products

Product 2

Page 15: VME Group and Precast Technology Products

Wall Panels

Page 16: VME Group and Precast Technology Products

Product 3

Page 17: VME Group and Precast Technology Products

Columns & Beams

Page 18: VME Group and Precast Technology Products

Product 4

Page 19: VME Group and Precast Technology Products

Stairs and Landings

Page 20: VME Group and Precast Technology Products

Product 5

Page 21: VME Group and Precast Technology Products

Dwello-Container home

Page 22: VME Group and Precast Technology Products

Product 6

Page 23: VME Group and Precast Technology Products

Aquafort-Instant Storage tank

Page 24: VME Group and Precast Technology Products

Product 7

Page 25: VME Group and Precast Technology Products

Freshin-Toilets

Page 26: VME Group and Precast Technology Products

Product 8

Page 27: VME Group and Precast Technology Products

Garbage Collection Bins

Page 28: VME Group and Precast Technology Products

Product 9

Page 29: VME Group and Precast Technology Products

Foot Over Bridge For Railways

Page 30: VME Group and Precast Technology Products

Thank You for

Watching