Upload
informa-australia
View
417
Download
1
Tags:
Embed Size (px)
DESCRIPTION
Jason Howe delivered the presentation at the 2014 Building the Territory Conference. The inaugural Building the Territory Conference 2014 is an opportunity to meet with the project owners and leaders, to hear about the new opportunities and developments for the built environment in the Territory. For more information about the event, please visit: http://bit.ly/BuildingtheNT2014
Citation preview
“Darwin Marine Supply Base”
Jason Howe, General Manager - Northern Australia
2
• Leading international oil and gas
services company
• US$1.3billion revenue in 2013
• 2000 employees worldwide
• Operating in more parts of the
world than any other specialist oil
and gas services company
• Marine Supply Bases in the UK,
Norway, Australia, Tanzania,
Trinidad and Tobago, Azerbaijan
and Eastern Canada
ASCO Group
3
• Offshore supply base
management
• Onshore oilfield support
• Fuel services
• Environmental services
• Personnel and training
• Inventory and materials handling
• Advisory and technical services
Our services
4
• Darwin Marine Supply Base
• East Arm Logistics Centre
• ONIQUA – inventory and asset
management
• Bonnie Rock Transport – onshore
logistics and transport
• Leveraging global experience to
benefit local operations
ASCO in Australia
5
November 2013 to April 2014
• Committed - 14 LNG, gas and oil projects valued
at $197b representing 86% of committed
investment for the Australian resources sector
• Publicly Announced – petroleum projects with a
combined CAPEX of $28b-$30b
• Feasibility - 8 LNG, gas and oil projects identified
with a combined value of $43b
Major Projects - BREE
6
Darwin Marine Supply Base
7
• 3 working berths with no tidal restrictions
• 4000m2 of laydown alongside each berth
• Efficient pumping rates for fuel and water
• Piped drilling bulks
• Heavy lift berth capable of operating
600 tonne cranes
• Open and undercover storage
• Office space and facilities for
external workers
• State-of-the-art security system
• Dangerous goods and waste transit bunds
Darwin Marine Supply Base
8
Darwin Marine Supply Base
9
ASCO in the Territory
Marine Supply Base
ASCO
Logistics
Centre
Port of Darwin
10
Australia’s onshore potential
• $168m – committed onshore NT petroleum exploration work program to 2018
• 30 wells and 5734 line km of 2D seismic data.
Source: energyNT 2013 - Department of Mines and Energy
11
• 15 years as one of the leading providers of
transport and logistics services to the oil and
gas industry in Australia
• Depots in Perth, Dampier, Dongara and
Broome in Western Australia, as well as
Chinchilla in Queensland
• Mobilisation of large drilling rigs and
associated equipment in often remote and
difficult locations
• Remote camp services, freezer, chiller and
general haulage
12
• Focus on transport and logistics
services to the oil and gas industry
across Australia
• Modern purpose-built infrastructure
to support both offshore and
onshore operators
• Established reputation and well
positioned to take advantage of the
significant onshore opportunities
Growing in Australia
THANK YOU