Great Rivers Greenway and its partners held a pre-bid construction conference and DBE mixer on October 7, 2013 at 1520 Market Street in St. Louis, MO. For details on the project, visit www.CityArchRiver.org or www.GreatRiversGreenway.org. Bids will be publicly opened at Great Rivers Greenway offices at 6174A Delmar Blvd, St. Louis, MO 63112 on October 24, 2013 at 2:00 p.m.
Citation preview
Projects
Central Riverfront ConstructionPre-Bid Conference
Agenda
• Project Overview• Considerations• Project & Bid Requirements• DBE participation• DBE networking event to follow
immediately after.
Great Rivers Greenway District
• About the District
• Our Role
CityArchRiver 2015 Projects
Federal Highway Administration Transportation Projects• Park Over the Highway• Central Riverfront
Department of Interior (DOI) & National Park Service (NPS) Projects• Luther Ely Smith Square• Old Courthouse• Museum/Visitor Center• Arch Grounds
• Reflecting ponds• East Slopes• Processional Allees• North Gateway Park
City of St. Louis, Great Rivers Greenway & CityArchRiver 2015 Foundation Project• Kiener Plaza
• Goals:– Enhancing the Gateway Arch experience for everyone.– Safe and easier access to park.
• Partners– CityArchRiver 2015 Foundation– National Park Service– Bi-State Development Agency (Metro)– MoDOT– City of St. Louis– Federal Highway Transportation Administration– Many more
CityArchRiver 2015
Central Riverfront Today
Central Riverfront 2015
Central Riverfront 2015
Central Riverfront 2015
Central Riverfront Today
Central Riverfront 2015
Packages & DBE Goals– #4 Demolition/Earthwork (12%)– #5 Asphalt Paving (19%)– #6 Landscaping (20%)– #7 Concrete (19%)– #8 Pavers (19%)– #9 Metals/Rails (19%)– #10 Signage (20%)– #11 Sewers/Plumbing (19%)– #12 Electrical (22%)– #13 Temporary Flood Protection (9%)
Bid Requirements– Bids must be for complete Bid Packages. See spec section
00310, Scope of Construction Work, for full description– Bids submitted to GRG at their office at 6174 Delmar by
2:00 pm, Thursday, October 24– All prime bidders (except landscaping, pavers, and
metals/rails) must submit or have on file a MoDOT Contractor Questionnaire on file at least 7 days prior to bid opening (October 17th). See MoDOT website.
– 5% bid bond with bid. 100 % performance and payment bonds at contract award.
Order of Work• Phase 1:
Chouteau to 2/3 of Grand Staircase. Estimated start 11/2013Estimated completion 9/2014
Access
Phase 1• Chouteau & Poplar Streets Closed at
LKS• Construction access from the south• Maintain Access to Material Sales• Maintain Emergency Fire / Rescue
Access to River• Maintain Access to Heliport, Riverboat,
and levee from the north• Maintain Pedestrian Access to River
from Grand Staircase
Order of WorkPhase 2:• 2/3 of Grand Staircase to Biddle Street Trailhead –
N. Riverfront Trail• Estimated start 9/2014• Estimated completion 9/2015
Access
Phase 2• Washington, Lucas, Morgan, Lacledes
Landing Blvd., and MLK Drive closed at LKS
• Construction access from the north• Maintain Access to First Street Parking
Garage (limited)• Maintain Access to Heliport, Riverboat,
and levee from the south• Maintain Pedestrian Access to River from
Grand Staircase
Transportation Resources & SupportMissouri Procurement Technical Assistance Center (PTAC)5988 Mid Rivers Mall Drive, Suite 111 | St. Charles, MO 63304Carolyn Jones | [email protected] | (314) 643-7684
Missouri Regional Certification Committee (MRCC)707 N. First Street | St. Louis, MO 63102(314) 982-1400 x 1352www.MetroStLouis.org/DBE
U.S. Department of Transportation Small Business and Disadvantaged Business Utilization1200 New Jersey Avenue SE | Washington, D.C. 20590(800) 532-1169 or (202) 366-7228 | www.dot.gov/osdbu
Missouri Office of Equal OpportunityTruman State Office Building | 301 West High Street, Room 360Jefferson City, MO 65102 | (877) 259-2963 | www.oeo.mo.gov
Questions?