Land Development Update

NAIOP/NVBIA Joint MeetingFebruary 11, 2016

Page 2: Land Development Update-February 11, 2016

Booster Shot Hiring

  Agency Division Classification Status Comments1 CAP Engineer III S27 1 - Filled Street Light Focus 2 DPZ Zoning Administration Planner III S27 1 - Filled 3 DPZ Zoning Evaluation Planner III S27 1 - Filled 4 DPZ Zoning Evaluation Planner III S27 1 - Filled Filled as Planner III5 FCDOT Transportation Planner II S24 1 - Filled 6 FCDOT Transportation Planner II S24 1 - Filled 7 Fire Marshal Fire Inspector II S20 1 - Filled 8 Fire Marshal Fire Inspector II S20 1 - Filled 9 Fire Marshal Administrative Assistant II S13 1 - Filled

10 Fire Marshal Engineer III S27 1 - Filled

11Health Department Environmental Health Environmental Health Spec II S23 1 - Filled

12 LDS Building Plan Review & Inspections Code Specialist II S24 1 - Filled 13 LDS Director's Office Management Analyst I S21 1 - Filled 14 LDS Code Development & Compliance Engineer Tech II S18 1 - Filled 15 LDS Code Development & Compliance Code Specialist II S24 1 - Filled 16 LDS Site Development & Inspections Senior Engineer III S28 1 - Filled 17 LDS Code Development & Compliance Code Specialist II S24 1 - Filled 18 LDS Code Development & Compliance Engineer Tech III S21 1 - Filled 19 LDS IT Business Analyst III S27 1 - Filled 20 LDS Director's Office Planner IV S29 1 - Filled 21 LDS Building Plan Review & Inspections Engineer III S27 1 - Filled 22 LDS Site Development & Inspections Sr Engineer III S28 1 - Filled Reclassified; filled23 LDS Site Development & Inspections Senior Engineering Inspector S21 1 - Filled 24 Urban Forestry Urban Forester II S24 1 - Filled 25 LDS Director's Office Assistant Director S34 2 - Interviews LDS Operations Director26 LDS HR Human Resources Generalist II S24 2 - Interviews 27 Fire Marshal Engineer III S27 3 - Advertising re-advertising; offer declined28 LDS Building Plan Review & Inspections Engineer IV S29 3 - Advertising Reclassified from Eng III to Eng IV

Page 3: Land Development Update-February 11, 2016

Average Site Plan Timelines

Plan Types Target Nov-Jan Last Period (Sep-Nov)

Average for 2015

Average for 2014

Infill Lot Grading Plan (INF, Non-bonded Single Family) 21 30 27 25.0 28

Major Plan First Submission (SP, SD, PI) 60 60 59 53 67

Major (SP, SD, PI) Second DPE 14 / 28 24 22 25 37

Major (SP, SD, PI) Subsequent Non-DPE 45 64 56 75 92

Page 4: Land Development Update-February 11, 2016

County of Fairfax, VA - Lines of Business Presentation - Winter 2016

4

Site Plan Review Times

Major Site Plans (2nd Submission Non-DPE)

Major Site Plans (2nd Submission DPE)

Major Site Plans (1st Submission DPE/Non-DPE)

Infill Lot Grading Plans

0 10 20 30 40 50 60 70 80 90 100

75

25

53

25

92

37

67

28

45

28

60

21

Target20142015

Page 5: Land Development Update-February 11, 2016

Average Review TimeResidential Building

Page 6: Land Development Update-February 11, 2016

Average Review Time Commercial Building

Page 7: Land Development Update-February 11, 2016

County of Fairfax, VA - Lines of Business Presentation - Winter 2016

7

Building Plan Review Wait Times

New Single Family Home

Home Addition

Residential Revisions

New Commercial Building

Commercial Tenant Layout

Retaining Walls, etc.

Peer Review

0 5 10 15 20 25 30

6

2

3

28

21

21

7

Number of Days Plans Wait in Reviewer’s Queue (2015)

Days In Queue

Page 8: Land Development Update-February 11, 2016

Fire Marshal’s Office – Plan Inventory

79 (Burkholder Backlog) plus 11 (Herrity Backlog) yields 90 plans (Ceiling is 100 total plans in backlog.)

Plan Type No. on Hand Oldest Date Work Day Lag

Sprinkler, Tenant plans without calculations 10 1-28-16 3

Sprinkler, Tenant plans with calculations 4 1-15-16 9

Sprinkler, Shell Bldgs., NFPA 13 systems 6 1-5-16 17

Sprinkler, Shell Bldgs., NFPA 13-R & 13-D systems 3 1-15-16 9

Town of Herndon Building Tenant  0 -- 0

Fire Alarm, Tenant plans 14 1-15-16 9

Fire Alarm, Shell Bldgs. 13 1-4-16 18

Door Lock / Security plans 2 2-2-16 0

Range Hood/Tanks/Foam/Public Safety Plans /Misc. 6 1-22-16 5

Site Plans/Rezoning 9 / 10 1-21-16 6

High-Piled Storage Plans 2 1-29-16 2

Evacuation / Lockdown Plans 0 -- 0

Burkholder Building Summary 79 1-4-16 XXXXXXXXX  FM Architectural Review done at Herrity Building(Class 4 and Greater Building Plans) 5 1-28-16 3

FM Architectural Review (Fast Track Tenant Plans) 0 -- 0

FM Arch. Review (non-Fast Track Tenant Plans) 6 1-29-16 2

Herrity Building (B-2) Summary 11 1-28-16 XXXXXXXXX

Page 9: Land Development Update-February 11, 2016

Planning & Zoning

Page 10: Land Development Update-February 11, 2016

New NVBIA/NAIOP Webpage

http://www.fairfaxcounty.gov/dpwes/committees/nvbia-naiop-fairfax-committee.htm