Upload
sandy-ketcham
View
226
Download
1
Embed Size (px)
DESCRIPTION
A flooring makeover for Crystal Lake Central High School by Garage Store.
Citation preview
Crystal Lake Central H.S.
Flooring Makeover
By The Garage Store(847) 428-8862
When the Crystal Lake Central High School decided that it needed a “makeover,” Garage Store Illinois stepped in to transform the floors in the Locker Room, the Shop and Classrooms.
The new flooring gives the school a modern up-to-date look. They are both beautiful, durable and easy to clean. Students and faculty will appreciate their new and improved spaces.
Take a look at our before and after pictures.
Locker Room
Before: Even when clean, the floor looked dingy and dirty.
Locker Room
Step 1: Surface is prepped; cracks are filled.
Locker Room
Step 2: The “flake” is added, which will give the floor beauty and texture
Locker Room
Step 3: The floor is finished with the durable coating
Locker Room
The Beautiful, durable and easy-to-clean floor is ready for the athletes!
Classroom - After
The classroom is ready for the new school year to begin!
Classroom - Before
Who wants to attend classes in this room?
Shop - Before
The Shop floor is worn out! Dingy and hard to clean!
Shop Floor - After
The Shop is ready for any project, no matter how messy. The floor is easy to clean and will keep its beauty for years to come!
Crystal Lake Central High School Pride:
The Garage Store is also proud to have helped Crystal Lake Central High School improve the quality of life for its students and faculty!
Call us today to hear more about our flooring and organization systems!